Full Site Search  
Sat Nov 25, 2017 01:48:39 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Medium; Platform Pic; Small Station Board;
Bandra+Terminus+Marathi+Name+Board
Medium; Platform Pic; Small Station Board;
Bandra+Terminus+English+Name+Board


BDTS/Bandra Terminus (7 PFs)
वान्द्रे टर्मिनस     बान्द्रा टर्मिनस

Track: Double Electric-Line

Type of Station: Terminus
Number of Platforms: 7
Number of Halting Trains: 0
Number of Originating Trains: 56
Number of Terminating Trains: 56
Tel; 022-26435756, Station Road, Bandra(East), Mumbai-400051
State: Maharashtra
add/change address
Elevation: 8 m above sea level
Zone: WR/Western
Division: Mumbai
 
 
9 Travel Tips
No Recent News for BDTS/Bandra Terminus
Nearby Stations in the News

Rating: 3.6/5 (174 votes)
cleanliness - good (25)
porters/escalators - good (20)
food - good (20)
transportation - good (24)
lodging - average (20)
railfanning - good (23)
sightseeing - good (20)
safety - good (22)

Nearby Stations

BA/Bandra 1 km     KHAR/Khar 1 km     STC/Santa Cruz 2 km     MM/Mahim Junction 3 km     SIN/Sion 3 km     GTBN/Guru Tegh Bahadur Nagar 4 km     KCE/Kings Circle 4 km     CHF/Chunabhatti 4 km     MRU/Matunga Road 4 km     VLP/Ville Parle 4 km    

Station News

Page#    Showing 1 to 20 of 172 News Items  next>>
Nov 03 2017 (10:06)  SOME NORTH-BOUND WESTERN RLY TRAINS TO BE AFFECTED DUE TO NON – INTERLOCKING WORK AT HARRAWALA STATION (www.wr.indianrailways.gov.in)
back to top
IR AffairsIR Press Release  

News Entry# 321723     
   Past Edits
Nov 03 2017 (10:06)
Station Tag: Bandra Terminus/BDTS added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 03 2017 (10:06)
Station Tag: Indore Junction BG/INDB added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 03 2017 (10:06)
Station Tag: Ujjain Junction/UJN added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 03 2017 (10:06)
Station Tag: Dehradun/DDN added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 03 2017 (10:06)
Station Tag: Haridwar/HW added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 03 2017 (10:06)
Train Tag: Ujjaini Express/14310 added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 03 2017 (10:06)
Train Tag: Indore-Dehradun Express/14317 added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 03 2017 (10:06)
Train Tag: Dehradun - Mumbai Bandra Terminus Express/19020 added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 03 2017 (10:06)
Train Tag: Mumbai Bandra (T.) - Dehradun Express/19019 added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461
 
 
Due to Non – Interlocking work at Harrawala station, for provision of panel interlocking inorder to run 18 coaches train between Haridwar – Dehradun section and also for the overhauling of lever frame at central cabin of Dehradun with effect from 5thNovember to 8th November, 2017; certain trains departing as well as arriving at W. Rly will be short terminated and will also depart from Haridwar station instead of Dehradun as per the details given under:
1.Train no 19019 Bandra Terminus – Dehradun Express, journey commencing o­n 04.11.2017, 05.11.2017 & 06.11.2017 will be short terminated at Haridwar station.
2.Train
...
more...
No. 19020 Dehradun – Bandra Terminus Express, journey commencing o­n 05.11.2017, 06.11.2017, 07.11.2017 & 08.11.2017 will depart from Haridwar station.
3.Train no 14317 Indore – Dehradun Express, journey commencing o­n 04.11.2017 & 05.11.2017 will be short terminated at Haridwar station.
4.Train No. 14310 Dehradun – Ujjain Express, journey commencing o­n 07.11.2017 & 08.11.2017 will depart from Haridwar station.
Nov 02 2017 (10:33)  Bullet Train Route 'Profitable', 100% Occupancy, Says Railways In U-Turn (www.ndtv.com)
back to top
Other NewsWR/Western  -  

News Entry# 321557   Blog Entry# 2614897     
   Past Edits
Nov 02 2017 (10:33)
Station Tag: Bandra Terminus/BDTS added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 02 2017 (10:33)
Station Tag: Mumbai Central/BCT added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 02 2017 (10:33)
Station Tag: Ahmedabad Junction/ADI added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 02 2017 (10:33)
Train Tag: Ahmedabad - Mumbai Central Passenger/59442 added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 02 2017 (10:33)
Train Tag: Mumbai Central - Ahmedabad Passenger/59441 added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 02 2017 (10:33)
Train Tag: Ahmedabad - Mumbai Central Passenger/59440 added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 02 2017 (10:33)
Train Tag: Mumbai Central - Ahmedabad Passenger/59439 added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 02 2017 (10:33)
Train Tag: Gujarat Superfast Express/22954 added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 02 2017 (10:33)
Train Tag: Gujarat Superfast Express/22953 added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 02 2017 (10:33)
Train Tag: Karnavati Express/12934 added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 02 2017 (10:33)
Train Tag: Karnavati Express/12933 added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 02 2017 (10:33)
Train Tag: Ahmedabad - Mumbai Central AC Double Decker Express/12932 added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 02 2017 (10:33)
Train Tag: Mumbai Central - Ahmedabad AC Double Decker Express/12931 added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 02 2017 (10:33)
Train Tag: Gujarat Mail/12902 added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 02 2017 (10:33)
Train Tag: Gujarat Mail/12901 added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 02 2017 (10:33)
Train Tag: Ahmedabad - Mumbai Central AC Duronto Express/12268 added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 02 2017 (10:33)
Train Tag: Mumbai Central - Ahmedabad AC Duronto Express/12267 added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 02 2017 (10:33)
Train Tag: Ahmedabad - Mumbai Central Shatabdi Express/12010 added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 02 2017 (10:33)
Train Tag: Mumbai Central - Ahmedabad Shatabdi Express/12009 added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461
 
 
MUMBAI: The Western Railway yesterday said that contrary to its own earlier RTI replies of 40 per cent drop in seat occupancy coupled with a huge loss in the Mumbai-Ahmedabad sector, it was actually a very profitable sector with over 100 per cent occupancy even during off-season.
In RTI replies provided to activist Anil Galgali, WR's Chief Commercial Manager Manjit Singh had given detailed figures of the seats going vacant on this sector, resulting in losses of almost Rs. 30 crore between July and September this year.
However, now Chief Public Relations
...
more...
Officer Ravinder Bhakar said that there are nine direct trains and 25 other trains going via Ahmedabad and the total earnings on this sector during that period was Rs. 233 crore, against the losses of nearly Rs. 30 crore as per the RTI replies, which pertained to number of passengers travelling between Mumbai Central-Ahmedabad.
"The information does not include information about en route traffic, passengers from originating station to en route stations, intermediate stations to intermediate and to destination stations between Mumbai Central and Ahmedabad, thereby showing lesser occupancy," Mr Bhakar said.
Despite the July-September period being a lean season, he said the occupancy on this sector remained 100 per cent plus on all the 34 trains.
Ads by ZINC
Of the nine direct trains, there were 803,150 berths of which actual bookings were 830,978, or 103 per cent occupancy in the Mumbai-Ahmedabad sector, and in return direction, the position remained the same.
Besides, in the 25 trains going via Ahmedabad, the berth availability was 1,070,710 and actual bookings were 1,230,585 or 115 per cent; in the return direction, it was even higher at 121 per cent.
RTI activist Anil Galgali said it is strange that the specific RTI query between Ahmedabad-Mumbai, which implied all stations en route, the number of passengers and revenue records and appropriate information should have been provided.
He said in the data given under RTI, details of all classes were provided but now that is not available. The RTI reply said that in the 32 trains on Mumbai-Ahmedabad sector, there were 735,630 seats and in 31 trains on Ahmedabad-Mumbai sector, there were 706,446 seats.
"Now, the WR is saying the total number of seats on this sector in 34 trains is much higher. Why the huge discrepancy in the figures given by the WR Chief Commercial Manager under RTI and the WR spokesperson?" Mr Galgali said.
Under these circumstances, if the replies provided under RTI are wrong, then the WR should initiate action against the people concerned and Railway Ministry must issue a detailed white paper on the occupancy and revenue status on this crucial sector where the bullet train project is being planned at a cost of over Rs. 1 lakh crore, he said.

1740 views
Nov 02 2017 (10:57)
12301HowrahRajdhaniTheGod~   2209 blog posts   1 correct pred (100% accurate)
Re# 2614897-1            Tags   Past Edits
hamara desh ko becha ja raha hain Japan ke pass. India cannot achieve 100% literacy, success, credibility & humanity as 50% of India's Administrative & Political personnel are totally illiterate in all aspect. [Only thing which is still making possible for our country's growth is presence of no other strong neighboring countries except China nearby].
Current Indian Govt will now surely scrap RT Info, RT Freedom, RT Free Speech, RT Love, Freedom of Expression(FOE), Freedom of Press, RT Live Freely from The Fundamental Rights of Indian Citizen granted by our Constitution.
the
...
more...
huge discrepancy in the figures given by the WR Chief Commercial Manager under RTI and the WR spokesperson is just the start of Dark age

1483 views
Nov 02 2017 (14:14)
a2z~   2187 blog posts
Re# 2614897-2            Tags   Past Edits
It is very difficult to get exact reply to complicated questions through RTI, because the concerned deptt almost always give the information specifically asked, and not the questions that may be considered to be implied.
For Mumbai-Ammedabad sector, The reply may include only the sale of tickets/ occupancy of seats at originating station only. Practically Mumbai-Ahm route is very high traffic density route and occupancy of just about 60% is hard to believe. Special fare/Premium trains may have poor occupancy due to high dynamic fares.
Oct 28 2017 (23:53)  Western Railway launches breastfeeding room at Bandra Station (www.freepressjournal.in)
back to top
New Facilities/TechnologyWR/Western  -  

News Entry# 321136     
   Past Edits
Oct 28 2017 (23:53)
Station Tag: Dadar Western/DDR added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Oct 28 2017 (23:53)
Station Tag: Dadar Central/DR added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Oct 28 2017 (23:53)
Station Tag: Lokmanya Tilak Terminus/LTT added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Oct 28 2017 (23:53)
Station Tag: Mumbai CSM Terminus/CSTM added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Oct 28 2017 (23:53)
Station Tag: Bandra Terminus/BDTS added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461
 
 
The Western Railway on Thursday launched a breastfeeding room at Bandra Station. This will be the first breastfeeding room on the suburban network of the railway.
According to a report in Hindustan Times, the room is located at platform number one near the newly built washroom. Earlier, this facility of the breastfeeding room was available only at stations handling long distance trains, which includes Chhatrapati Shivaji Maharaj Terminus (CSMT), Mumbai Central and Lokmanya Tilak Terminus (LTT). Even at Dadar station there is a room reserved for breastfeeding. This room is located at platform number six. The Central and Western Railway are planning to have more of such breastfeeding rooms at other stations as well.
Oct 28 2017 (23:48)  Bandra railway booking office shut after devastating slum fire (www.freepressjournal.in)
back to top
Crime/AccidentsWR/Western  -  

News Entry# 321134     
   Past Edits
Oct 28 2017 (23:48)
Station Tag: Bandra/BA added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Oct 28 2017 (23:48)
Station Tag: Bandra Terminus/BDTS added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461
Stations:  Bandra Terminus/BDTS   Bandra/BA  
 
 
Mumbai: After a major fire broke out at Behrampada Garib Nagar slum, which left many shanties gutted in a fire, the booking office on the footover bridge (FOB) towards Bandra Kurla Complex (BKC), just above the accident site has been shut down by western railway officials as a precautionary measure.
Also, for the convenience of commuters, extra ticket vending machines and retired staff members have been deployed at automatic ticket vending machines. Bandra station master A K Srivastava remarked that due to extensive fire which broke out on Thursday the wire installation at the booking office at the Bandra Kurla Complex (BKC) end FOB bridge got damaged (melted) and only after the inspection the booking office will be reopened.
At
...
more...
the BKC-end ticket booking office total four railway staffs where been working in two shifts each. However, everyone had a lucky escape. “During the blaze immediately the office was vacated by the staff and cordoned by firemen and Railway Police Force (RPF) constables for no way to enter the premises,” Srivastav added.
Another officer from chief ticket booking office of Bandra who did not want his name to be revealed stated, “The four staff from the booking office which has been shut down for the time being have been shifted to other booking offices.”
Oct 26 2017 (18:43)  Major fire outside Bandra station in Mumbai (www.tribuneindia.com)
back to top
Major Accidents/DisruptionsWR/Western  -  

News Entry# 320917     
   Past Edits
Oct 26 2017 (18:43)
Station Tag: Bandra/BA added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Oct 26 2017 (18:43)
Station Tag: Bandra Terminus/BDTS added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461
Stations:  Bandra Terminus/BDTS   Bandra/BA  
 
 
A major fire broke out at Behrampada adjacent to suburban Bandra station in Mumbai on Thursday afternoon, forcing the railway authorities to halt train services on the harbour line, a senior railway official said.
No casualties have been reported so far, a fire brigade official said.
The fire broke out near the east side of Bandra local station during a demolition drive carried out by the municipal corporation, the official said.
"Our
...
more...
control room got a call at 4.24 pm and fire brigade personnel along with 16 fire engines and 10 water tankers have been pressed into service," the official said.
The chief PRO of the Central Railway said, "We have stopped Harbour line up and down services from 4.25 pm as a precautionary measure owing to fire near the Bandra station on the east side." — PTI
Page#    Showing 1 to 20 of 172 News Items  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.