Full Site Search  
Fri Jan 19, 2018 07:19:21 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Large Station Board;
Large Station Board;


CCT/Kakinada Town Junction (4 PFs)
కాకినాడ టౌన్ జంక్షన్     काकिनाडा टाउन जंक्शन

Track: Double Electric-Line

Type of Station: Junction
Number of Platforms: 4
Number of Halting Trains: 18
Number of Originating Trains: 10
Number of Terminating Trains: 6
Jn. Pt. SLO/COA/KPLH, Valemuri Vari Veedhi, Rama Rao Peta, Kakinada, East Godavari
State: Andhra Pradesh
add/change address
Zone: SCR/South Central
Division: Vijayawada
 
 
No Recent News for CCT/Kakinada Town Junction
Nearby Stations in the News

Rating: 4.2/5 (51 votes)
cleanliness - good (7)
porters/escalators - good (6)
food - excellent (7)
transportation - good (7)
lodging - good (6)
railfanning - excellent (6)
sightseeing - excellent (6)
safety - good (6)

Nearby Stations

KOVH/Kovvada 5 km     AKAH/Artalakatta 11 km     SLO/Samalkot Junction 12 km     KRAP/Karapa 14 km     CRPM/Chandrampalem 16 km     GDPT/Gudaparti 17 km     VH/Vakada 18 km     PAP/Pithapuram 21 km     MPU/Medapadu 21 km     VGH/Velangi 22 km    

Station News

Page#    Showing 1 to 20 of 41 News Items  next>>
Jan 10 2018 (18:19)  Tirupati to be developed as world-class railway station (www.thehansindia.com)
back to top
New Facilities/TechnologySCR/South Central  -  

News Entry# 326683     
   Past Edits
Jan 10 2018 (18:19)
Station Tag: Kakinada Town Junction/CCT added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Jan 10 2018 (18:19)
Station Tag: Pithapuram/PAP added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Jan 10 2018 (18:19)
Station Tag: Sri Kalahasti/KHT added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Jan 10 2018 (18:19)
Station Tag: Nadikude Junction/NDKD added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Jan 10 2018 (18:19)
Station Tag: Padugupadu/PGU added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Jan 10 2018 (18:19)
Station Tag: Bhadrachalam Road/BDCR added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Jan 10 2018 (18:19)
Station Tag: Vijayawada Junction/BZA added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Jan 10 2018 (18:19)
Station Tag: Tirupati Main/TPTY added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461
 
 
Vijayawada: South Central Railway (SCR) General Manager Vinod Kumar Yadav said on Tuesday that the South Central Railway will develop Tirupati railway station at a cost of Rs 400 crore to reduce congestion and enhance passenger amenities in the railway station.
He further said the Railways had adequate funds for construction of rail-over bridges, foot-over-bridges, escalators and lifts in the railway station. He said the SCR was receiving representations from the people and political leaders in this regard.
After the completion of meeting with MPs from the State, the General Manager addressed a
...
more...
media conference here. He said Tirupati railway station would be developed in an area of six lakh square feet at a cost of Rs 400 crore to transform it into a world-class railway station. He said one more platform would be built at the railway station to meet the rush of passengers.
He said the SCR would construct 200 foot-over bridges, 100 lifts in the railway stations in SCR zone. He said that 58 rail-over bridges were under various stages of construction and the department is ready to construct the ROBs as per the needs of the people. He said the railways is giving priority to improve passenger amenities like construction of lifts, escalators etc.
Referring to the development of Vijayawada railway station building, he said proposals are underway to give the land for lease for 90 years as the applicants are not coming forward for the proposed 40 years lease.
Giving details of Bhadrachalam-Kovuru railway line, he said the Railways would be holding discussions with Telangana government to acquire land for construction of the line.
Referring to Nadikudi-Srikalahasti railway line, the General Manager said the 30-km line would be opened by the end of March 2018. He said the railway department was holding discussions with the State government to sort out problems pertaining to the Pithapuram-Kakinda railway line.
Jan 10 2018 (10:57)  TDP MP pushes for Kakinada-Pithapuram rail line construction (indiatoday.intoday.in)
back to top
Other NewsSCR/South Central  -  

News Entry# 326650   Blog Entry# 2987032     
   Past Edits
Jan 10 2018 (10:57)
Station Tag: KSR Bengaluru City Junction (Bangalore)/SBC added by karbang~/50057

Jan 10 2018 (10:57)
Station Tag: Kadapa Junction/HX added by karbang~/50057

Jan 10 2018 (10:57)
Station Tag: Kurnool City/KRNT added by karbang~/50057

Jan 10 2018 (10:57)
Station Tag: Yerraguntla Junction/YA added by karbang~/50057

Jan 10 2018 (10:57)
Station Tag: Pithapuram/PAP added by karbang~/50057

Jan 10 2018 (10:57)
Station Tag: Kakinada Town Junction/CCT added by karbang~/50057
Posted by: karbang~  419 news posts
 
 
Telugu Desam Parliamentary Party leader Thota Narasimham today raised a strong demand for taking up the much-delayed Kakinada-Pithapuram railway main line construction project.
The Railways had kept the project on a "freezing mode" based on an "erroneous report" sent to its board, Narasimham told reporters here this afternoon.
The Lok Sabha member from Kakinada took up the issue with South Central Railway General Manager Vinod Kumar Yadav at a meeting organised with MPs from the state.
Narasimham
...
more...
maintained construction of the Kakinada- Pithapuram main line was a decades-old dream and linked to sentiment of the people of the region.
"Suresh Prabhu, when he was Minister for Railways, granted Rs 50 crore in the first year and Rs 150 crore in the second year for the 21km project.
"The state government is ready to bear the land acquisition cost of the project but some officials sent a wrong report to the Railway Board that the Samalkot-Kakinada line is not viable. This has nothing to do with the Kakinada- Pithapuram line," he told reporters after the meeting.
The Railways officials did not consult him before submitting the report, he added.
"I have taken up the issue with Railways Minister Piyush Goyal and he promised to take up the work if there is no problem in land acquisition."
Meanwhile, the SCR General Manager informed the MPs that major works related to development of rail infrastructure in Andhra Pradesh were progressing at a brisk pace.
Works related to construction of a new line between Yerraguntla and Nandyal and electrification of the Wadi- Raichur-Guntakal section were completed during the current fiscal, Yadav said.
In addition, a small stretch in the Nadikudi? Srikalahasti and Kadapa?Bengaluru new line projects was also targeted for completion during the current fiscal, he added.
He said works on doubling and electrification of the Vijayawada-Gudivada-Bhimavaram-Narsapursection section were going on at a fast pace.
Works on construction of 58 Road-Over-Bridges (ROBs) and 138 Road-Under-Bridges (RUBs) were in progress, while construction of another 21 ROBs and 24 RUBs was under consideration, Yadav said.
The Tirupati railway station would be developed into a world-class facility at a cost of Rs 450 crore, the General Manager said.
A proposal to connect Kadapa and Kurnool towns in Rayalaseema with new the state?s new capital Amaravati was under active consideration, Yadav added.
Telugu Desam Party and YSR Congress MPs attended the meeting. PTI DBV RSY RDS

3 posts - Wed Jan 10, 2018 - are hidden. Click to open.

24 posts - Thu Jan 11, 2018 - are hidden. Click to open.

454 views
Jan 11 2018 (19:25)
HOG WAM4 WAP1~   3224 blog posts
Re# 2987032-29            Tags   Past Edits
Avunu. Via Uppada, Nemam, Kothapalli. Balayogi garu Kotipalli line sanction cheyinchinappude, PAP line aithe only 10km deviation, pedhaga upayogam undadhu, Annavaram varaku aithe around 50km parallel route vastundhi and some use untundhi ani propose chesaru. Kaani aayana povadam tho aa idea alage undipoyi, PAP line sanction ayyindhi. Petro corridor project last year May lo cancel chesinattunnaru, SEZ lo land godavala valla. But, ee alignment aithe port vallaki kuda distance taggadaniki use avtundhani, direct ga port station ki link cheyyadaniki land ivvochu ani talk. Mari deeni gurinchi emaina chestaro, leka passenger association valla matalu MPs galiki vadilestaro chudali.

483 views
Jan 11 2018 (19:27)
SRG*^~   36377 blog posts   199042 correct pred (76% accurate)
Re# 2987032-30            Tags   Past Edits
Asalki deniki kadutunnadu PF#4 ?? Daani valla emiti upoyagam asalki planning enti??

481 views
Jan 11 2018 (19:29)
SRG*^~   36377 blog posts   199042 correct pred (76% accurate)
Re# 2987032-31            Tags   Past Edits
Idi cheste Freight traffic direct vacheyochu port side with out touching sarpavaram-CCT route...Baguntadi cheste but emi chestaro upar wala jaane.

503 views
Jan 11 2018 (19:30)
HOG WAM4 WAP1~   3224 blog posts
Re# 2987032-32            Tags   Past Edits
Antha Bhanugudi side velle passengers kosam. Morning trains digaka janalu PF (2/3) ending nunchi track cross chesi Autos teesukuntunnaru (Near Blue bells school). Vallaki direct ga Bhanugudi side ki digadaniki low level platform kattaru. Ippudu danni height penchi normal platform laa cheyyadaniki proposals icharanta.

534 views
Jan 11 2018 (19:34)
SRG*^~   36377 blog posts   199042 correct pred (76% accurate)
Re# 2987032-33            Tags   Past Edits
2/3 ante ippudu arrivals 3-4 ki isatara enti adi avithe or seperate ga vere alignment edaina chestunnara?? Kakinada poyi chala rojulayyindi ee saari velli nappudu chudaali.

780 views
Jan 11 2018 (19:37)
SRG*^~   36377 blog posts   199042 correct pred (76% accurate)
Re# 2987032-34            Tags   Past Edits
Oh oka pic undi meeru upload chesinde anukunta Seshadri PF#3 ki ichadu arrival even though PF#2 free ga ne unna...

753 views
Jan 11 2018 (19:58)
HOG WAM4 WAP1~   3224 blog posts
Re# 2987032-35            Tags   Past Edits
Avnu. Arrivals regular ga 3/4 chesthadu anukunta. October lo 3 weeks unna, appudu Gowthami, Seshu kuda PF3 meeda arrival ichadu chaala saarlu. Nenu ippatlo Kakinada vellalenu, just family and friends ni regular ga observe cheyyamani champuthu unta. :)

727 views
Jan 11 2018 (20:00)
SRG*^~   36377 blog posts   199042 correct pred (76% accurate)
Re# 2987032-36            Tags   Past Edits
Family & Friends ivvani kuda chusi pedatara?? Entuku ivvanni ani adgara?? :)

687 views
Jan 11 2018 (20:13)
HOG WAM4 WAP1~   3224 blog posts
Re# 2987032-37            Tags   Past Edits
Railfans to thirigi vallaki kuda alavaatu ayipoyindhi. :)

649 views
Jan 11 2018 (20:30)
SRG*^~   36377 blog posts   199042 correct pred (76% accurate)
Re# 2987032-38            Tags   Past Edits
Super _/\_
Dec 16 2017 (10:48)  Special trains between Kakinada town-tirupati-Visakhapatnam-Guntue (m.facebook.com)
back to top
New/Special TrainsSCR/South Central  -  

News Entry# 324735     
   Past Edits
Dec 16 2017 (10:48)
Station Tag: Guntur Junction/GNT added by mnj777~/1818520

Dec 16 2017 (10:48)
Station Tag: Visakhapatnam Junction/VSKP added by mnj777~/1818520

Dec 16 2017 (10:48)
Station Tag: Kakinada Town Junction/CCT added by mnj777~/1818520

Dec 16 2017 (10:48)
Station Tag: Tirupati Main/TPTY added by mnj777~/1818520

Dec 16 2017 (10:48)
Train Tag: Tirupati - Vishakapatnam Special/07044 added by mnj777~/1818520
Posted by: mnj777~  4 news posts
 
 
07239 will run upto Gnt instead of old Ndd
Nov 30 2017 (12:48)  Special Trains between Hyderabad and Kakinada Town - 07075 /07076 (www.scr.indianrailways.gov.in)
back to top
New/Special TrainsSCR/South Central  -  IR Press Release  

News Entry# 323679     
   Past Edits
Nov 30 2017 (12:48)
Station Tag: Kakinada Town Junction/CCT added by Electrification of BAY/36147

Nov 30 2017 (12:48)
Station Tag: Samalkot Junction/SLO added by Electrification of BAY/36147

Nov 30 2017 (12:48)
Station Tag: Rajahmundry/RJY added by Electrification of BAY/36147

Nov 30 2017 (12:48)
Station Tag: Bhimavaram Town/BVRT added by Electrification of BAY/36147

Nov 30 2017 (12:48)
Station Tag: Gudivada Junction/GDV added by Electrification of BAY/36147

Nov 30 2017 (12:48)
Station Tag: Vijayawada Junction/BZA added by Electrification of BAY/36147

Nov 30 2017 (12:48)
Station Tag: Guntur Junction/GNT added by Electrification of BAY/36147

Nov 30 2017 (12:48)
Station Tag: Nalgonda/NLDA added by Electrification of BAY/36147

Nov 30 2017 (12:48)
Station Tag: Hyderabad Deccan Nampally/HYB added by Electrification of BAY/36147

Nov 30 2017 (12:48)
Train Tag: Kakinada Town - Hyderabad (via Bhimavaram) SpecialFare Special/07076 added by Electrification of BAY/36147

Nov 30 2017 (12:48)
Train Tag: Hyderabad – Kakinada Town SpecialFare Special/07075 added by Electrification of BAY/36147
 
 
In order to clear extra rush, South Central Railway will run two special trains between Hyderabad and Kakinada Town via., Guntur, Bhimavaram Townas detailed below.

Train No. 07075 Hyderabad – Kakinada Town special train will depart Hyderabad at
18:50 hrs on 1st December, 2017 (Friday) arrive/depart Secunderabad at
...
more...
19:15/19:20 hrs and arrive Kakinada Town at 05:30 hrs o­n the next day.

In the return direction, Train No. 07076 Kakinada Port - Hyderabad special train will depart Kakinada Town at 18:10 hrs on 3rd December, 2017 (Sunday) arrive/depart Secunderabad at 06:00/06:05 hrs o­n the next day and arrive Hyderabad at 06:50 hrs.

Enroute, these special trains will also stop at Nalgonda, Miryalaguda, Nadikudi, Piduguralla, Sattenapalli, Guntur, Vijayawada, Gudivada, Kaikaluru, Akividu, Bhimavaram Town, Tanuku, Nidadavolu, Rajahmundry, Samalkot and Kakinada Town stations in both the directions.

All these special trains will consist of AC II Tier, AC III Tier and Sleeper Class Coaches
Sep 19 2017 (14:57)  Railways, RTC gear up for Brahmotsavams (www.thehansindia.com)
back to top
Other NewsSCR/South Central  -  

News Entry# 317268     
   Past Edits
This is a new feature showing past edits to this News Post.
Posted by: karbang~  419 news posts
 
 
irupati: As the nine-day annual Brahmotsavams of Lord Venkateswara will be commencing on September 23, the Railways and RTC are gearing up to meet additional influx of pilgrims. As the Brahmotsavams are coupled with the Dasara holidays, the authorities were expecting huge rush of devotees.
To meet the extra demand, Railway authorities were having a close watch on the waiting lists of various trains reaching pilgrim from various destinations to introduce special trains for the convenience of passengers. Several trains for which Tirupati is the source or destination station, were already having huge waiting lists. During normal days also, Tirupati will have good influx of passengers and considered as a grade one railway station in South Central Railway (SCR).
It
...
more...
is the only station which contributes Rs 40-50 lakh daily to the Railways in Guntakal Division. Every day, 97 trains of all categories pass through Tirupati railway station. So far, SCR has announced two trains between Tirupati-Kakinada which will run on Thursday and Saturday.
Train number 07941 will leave Kakinada station at 7 pm on September 20 to reach Tirupati at 6.20 am the next day. On September 21, train number 07492 leaves Tirupati at 7 pm to reach Kakinada at 5.30 am the next day. Similarly, the train runs on September 22 and 23 also. It halts at Samalkot, Rajahmundry, Tadepalligudem, Eluru, Vijayawada, Tenali, Ongole, Nellore, Gudur, Srikalahasti and Renigunta.
The train will have 15 coaches. Speaking to The Hans India, Tirupati Station Manager M Subodh Mithra said another train between Secunderabad and Tirupati is under consideration and may be announced in a day or two. He said that they were coordinating with the TTD authorities to make arrangements for the pilgrims. With the help of the TTD, information counters will be opened at railway station, he said.
Apart from the regular doctors of Railways, the station manager said that they are entering into an understanding with the Narayanadri Hospitals to arrange special medical camp at railway station for the pilgrims.
The RTC authorities have planned to run 550 buses between Tirupati and Tirumala on Garuda Seva Day which will make around 4,200 trips. On the remaining days of Brahmotsavams, the bus trips may go up to 2,000 from the existing 1,600 depending on the rush.
APSRTC Regional Manager V Nagasivudu revealed that they are providing relief teams on the ghat road along with the TTD. Safety driving instructors will be deployed at vulnerable turnings on the ghat roads, he stated and added that more buses will be operated to various destinations of Tamil Nadu and Karnataka as more pilgrims are expected from that states. Letters were sent to Vijayawada, Nellore and other depots to operate more buses as and when required.
Information centres and medical camps will be held at the bus station, he maintained. Meanwhile, the Transport department allocated Brahmotsavam duties to 32 Motor Vehicle Inspectors (MVIs) working in the district.
They have to ensure that no vehicle without proper documentation should enter Tirumala. Taxi drivers should collect only the approved fares from the pilgrims. The MVIs have to take action against taxi drivers if they receive complaints from pilgrims of collecting additional fare from them. On Garuda Seva day, no two-wheeler will be allowed on ghat roads.
Page#    Showing 1 to 20 of 41 News Items  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.