Full Site Search  
Tue Jul 25, 2017 02:23:31 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Large Station Board;
Large Station Board;
Scenic; Medium; Platform Pic;
Front Entrance - Outside;

RPH/Rampurhat Junction (3 PFs)
রামপুরহাট জংশন     रामपुरहाट जंक्शन

Track: Double Electric-Line

Type of Station: Junction
Number of Platforms: 3
Number of Halting Trains: 86
Number of Originating Trains: 23
Number of Terminating Trains: 23
Station road , 03461-255131, Rampurhat , DIST - Birbhum
State: West Bengal
Elevation: 40 m above sea level
Zone: ER/Eastern
Division: Howrah
4 Travel Tips
No Recent News for RPH/Rampurhat Junction
Nearby Stations in the News

Rating: 3.9/5 (93 votes)
cleanliness - good (12)
porters/escalators - good (12)
food - good (12)
transportation - good (12)
lodging - good (9)
railfanning - good (13)
sightseeing - good (12)
safety - excellent (11)

Nearby Stations

TPF/Tarapith Road 7 km     SDLE/Swadinpur 7 km     ALPD/Adalpahari 12 km     MLV/Mallarpur 13 km     NHT/Nalhati Junction 14 km     PRGR/Pinargaria 19 km     TKP/Takipur 21 km     GHLE/Gadadharpur 21 km     CTR/Chatra 23 km     HRNS/Harinsing 27 km    

Station News

Page#    Showing 1 to 20 of 28 News Items  next>>
Jul 09 2017 (15:25)  ER TO PROVIDE MORE PASSENGER AMENITIES AT BOLPUR & RAMPURHAT STATIONS (er.indianrailways.gov.in)
back to top
New Facilities/TechnologyER/Eastern  -  IR Press Release  

News Entry# 307883     
   Tags   Past Edits
Jul 09 2017 (15:25)
Station Tag: Pakur/PKR added by Second LHB train in Bhagalpur soon😊😊^~/1685971

Jul 09 2017 (15:25)
Station Tag: Sainthia Junction/SNT added by Second LHB train in Bhagalpur soon😊😊^~/1685971

Jul 09 2017 (15:25)
Station Tag: Rampurhat Junction/RPH added by Second LHB train in Bhagalpur soon😊😊^~/1685971

Jul 09 2017 (15:25)
Station Tag: Bolpur Shantiniketan/BHP added by Second LHB train in Bhagalpur soon😊😊^~/1685971

Posted by: In a relationship with poorva exp😎😎^~  35 news posts
Kolkata, July 7, 2017:
Shri Harindra Rao, General Manager, Eastern Railway thoroughly inspected different stations in Khana-Bolpur-Rampurhat-Gumani section of Eastern Railway’s Howrah Division today and also conducted window trailing inspections over the section to see the track maintenance , signalling system , bridges etc to ensure safe running of trains.
At Bolpur, General Manager inspected waiting hall, foot over bridges, canteen, drinking water provisions and other passenger amenities. General Manager also interacted with the passengers to get a feedback and advised all
...
more...
concerned to provide even better facilities and amenities to the passengers. Shri Rao also visited ER’s Gitanjali Museum at Bolpur station where rare photographs of Gurudev Rabindranath Tagore and other souvenirs of the Great Poet are preserved.
Shri Rao also conducted inspections at Sainthia, Rampurhat & Pakur stations where he thoroughly checked passenger amenities, cleanliness , safety aspects and observance of safety rules by the o­n duty staff.
GM advised the divisional officers and staff, to provide more amenities for the passengers especially at stations like Bolpur-Shantinitetan & Rampurhat in this section having rush of tourist and pilgrims, in order to make pleasant travel experience for them while in Railway jurisdiction.
Principal Officers from ER headquarters, DRM/Howrah and other senior officers of the division accompanied GM during the inspection.
Dec 24 2016 (12:20)  Humsafar Express train passing through Chennai to be flagged off on Dec 25 (timesofindia.indiatimes.com)
back to top
New/Special Trains

News Entry# 289524     
   Tags   Past Edits
Dec 24 2016 (12:25PM)
Station Tag: Katpadi Junction/KPD added by ßαηεяנεε™^~/665304

Dec 24 2016 (12:25PM)
Station Tag: Perambur/PER added by ßαηεяנεε™^~/665304

Dec 24 2016 (12:25PM)
Station Tag: Vijayawada Junction/BZA added by ßαηεяנεε™^~/665304

Dec 24 2016 (12:25PM)
Station Tag: Duvvada/DVD added by ßαηεяנεε™^~/665304

Dec 24 2016 (12:25PM)
Station Tag: Vizianagaram Junction/VZM added by ßαηεяנεε™^~/665304

Dec 24 2016 (12:25PM)
Station Tag: Brahmapur/BAM added by ßαηεяנεε™^~/665304

Dec 24 2016 (12:25PM)
Station Tag: Khurda Road Junction/KUR added by ßαηεяנεε™^~/665304

Dec 24 2016 (12:25PM)
Station Tag: Bhubaneswar/BBS added by ßαηεяנεε™^~/665304

Dec 24 2016 (12:25PM)
Station Tag: Cuttack Junction/CTC added by ßαηεяנεε™^~/665304

Dec 24 2016 (12:25PM)
Station Tag: Bhadrak/BHC added by ßαηεяנεε™^~/665304

Dec 24 2016 (12:25PM)
Station Tag: Kharagpur Junction/KGP added by ßαηεяנεε™^~/665304

Dec 24 2016 (12:25PM)
Station Tag: Howrah Junction/HWH added by ßαηεяנεε™^~/665304

Dec 24 2016 (12:25PM)
Station Tag: Rampurhat/RPH added by ßαηεяנεε™^~/665304

Dec 24 2016 (12:25PM)
Station Tag: Malda Town/MLDT added by ßαηεяנεε™^~/665304

Dec 24 2016 (12:25PM)
Station Tag: KishanGanj/KNE added by ßαηεяנεε™^~/665304

Dec 24 2016 (12:25PM)
Station Tag: New Jalpaiguri Junction/NJP added by ßαηεяנεε™^~/665304

Dec 24 2016 (12:25PM)
Station Tag: New Bongaigaon Junction/NBQ added by ßαηεяנεε™^~/665304

Dec 24 2016 (12:25PM)
Train Tag: Bengaluru Cantt. - Kamakhya Humsafar Express/12503 added by ßαηεяנεε™^~/665304

Dec 24 2016 (12:25PM)
Train Tag: Kamakhya - Bengaluru Cantt. Humsafar Express (Weekly)/12504 added by ßαηεяנεε™^~/665304

Posted by: Banerjee™^~  281 news posts
Hamsafar weekly express trains will run via Perambur in Chennai and Katpadi.
The inaugural special train will leave Kamakhya at 12.15pm on December 25. It will leave Perambur at 10:20am on December 27 and reach Bangalore Cantonment at 5pm on the same day.
It will stop at New Bongaigaon, New Jalpaiguri, Kishanganj, Malda Town, Rampur Hat, Howrah, Kharagpur, Bhadrak, Cuttack, Bhubaneswar, Khurda Road, Brahmapur, Vizianagaram, Duvvada, Vijayawada, Perambur, Katpadi and Whitefield.
The
...
more...
regular service of Train No 12504 / 12503 Kamakhya - Bangalore Cantonment - Kamakhya Hamsafar weekly express trains will begin from Bangalore Cantonment on December 30, 2016.
The train will have 13 AC-3 tier coaches. The facilities would include CCTV cameras, fire and smoke detection systems and tea-coffee vending machines, officials said.
Southern Railway will get two more Humsafar Express trains -- Chennai-Ahmedabad and Tiruchirapalli- Sriganganagar trains.
Oct 25 2016 (02:47)  दिवाली तोहफा : भागलपुर से हावड़ा के लिए चलेंगी 2 नई ट्रेनें (m.livehindustan.com)
back to top
New/Special TrainsER/Eastern  -  

News Entry# 283927     
   Tags   Past Edits
This is a new feature showing past edits to this News Post.

Posted by: chandanbhrt  1 news posts
भागलपुर के साथ साथ सम्पूर्ण अंग क्षेत्र के लोगों केलिए खुशखबरी है।
नवनिर्मित भागलपुर-मंदारहिल-रामपुरहाट रेल लाइन होकर भागलपुर से हावड़ा के लिए दो ट्रेनें मिल सकती हैं।
जोनल मुख्यालय ने बाकायदा इसके लिए रेलवे बोर्ड को प्रस्ताव भी दे दिया है, जिसकी स्वीकृति मिल गई है। सोमवार को भागलपुर दौरे पर आ रहे पूर्व रेलवे के जीएम घनश्याम सिंह इसकी फिजिबिलिटी का जायजा भी लेंगे।
जो
...
more...
दो ट्रेनें भागलपुर से हावड़ा के लिए प्रस्तावित हैं, वह भाया हसडीहा, दुमका और रामपुरहाट होकर हावड़ा तक जाएगी।
दोनों एक्सप्रेस ट्रेनें होंगी।
इनमें से एक ट्रेन नई होगी जबकि एक ट्रेन हावड़ा-सुरी एक्सप्रेस (13053-13054) है जिसे भागलपुर तक विस्तारित करने का प्रस्ताव है।
जोनल मुख्यालय से इस प्रस्ताव को स्वीकृति मिलने के बाद मालदा रेल मंडल ने बाकायदा भागलपुर के रेल अधिकारियों को अधिकारिक रूप से इसकी सूचना भी दी है।
पढ़े : जरूर पढ़ें
बताया जा रहा है कि सोमवार को जीएम भागलपुर यार्ड में जोनल और डिविजनल अधिकारियों के साथ ट्रेन मेंटेनेंस के संसाधनों का जायजा लेकर तमाम विंदुओं पर विचार करेंगे। मसलन ट्रेन चलने पर प्राइमरी और सेकेंड्री मेंटेनेंस कहां कराया जा सकता है। कितने यात्री लाभान्वित होंगे और कितनी बोगियों की ट्रेन चलाई जा सकती है। तमाम विंदुओं पर चर्चा होने के बाद ट्रेन चलाने की तिथि निर्धारित की जाएगी।
ये क्षेत्र होंगे लाभान्वित
भागलपुर,
मंदारहिल/बांका,
हसडीहा,
दुमका,
रामपुरहाट
इलाके के लोग
ये होंगे प्रमुख फायदे
नए रेलखंड से चलने वाली नई ट्रेन कम समय में पहुंचेगी भागलपुर से हावड़ा
भागलपुर से हावड़ा की दूरी 470 किमी की जगह 440 किमी हो जाएगी
भागलपुर से रामपुरहाट की दूरी 207 की जगह 175 किमी रह जाएगी
स्टॉपेज कम होने के कारण कम समय में तय होगी दूरी
दुमका-हसडीहा-मंदारहिल रेलखंड के यात्रियों को एक्सप्रेस ट्रेन की सुविधा मिलेगी
दुमका, रामपुरहाट, हसडीहा, मंदारहिल आदि जगह के व्यवसायी दो बड़े बाजार से जुड़ जाएंगे
दूरी कम होने के कारण किराया भी काम होगा
तीन तीर्थस्थलों की राह होगी आसान
इस नए रेलखंड चलने वाली इन एक्सप्रेस ट्रेनों से चार महत्वपूर्ण तीर्थस्थल पर जाने वाले लोग भी लाभान्वित होंगे। भागलपुर-रामपुरहाट रेलखंड से जुड़े तीन प्रमुख तीर्थस्थल हैं।
तारपीठ,
बौंसी में मंदार तीर्थ /जैन मंदिर
और
दुमका के पास बासुकीनाथ
जैसे महत्वपूर्ण तीर्थस्थल हैं।
Jul 31 2016 (11:18)  RS 26K-CR RAILWAY PROJECTS IN PROGRESS FOR J’KHAND (www.dailypioneer.com)
back to top
IR Affairs

News Entry# 275480     
   Tags   Past Edits
Jul 31 2016 (11:18AM)
Station Tag: Singrauli/SGRL added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Ramna/RMF added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Garhwa Road Junction/GHD added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Son Nagar Junction/SEB added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Ranchi Road/RRME added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Patratu/PTRU added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Barkakana Junction/BRKA added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Tori/TORI added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Ranchi Junction/RNC added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Dhanbad Junction/DHN added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: RafiGanj/RFJ added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Chittaranjan/CRJ added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Chirimiri/CHRM added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Rampurhat/RPH added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Jasidih Junction/JSME added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Dumka/DUMK added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Basukinath/BSKH added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Gaya Junction/GAYA added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: Barwadih Junction/BRWD added by Ghost Rider/356854

Jul 31 2016 (11:18AM)
Station Tag: DaltonGanj/DTO added by Ghost Rider/356854

Posted by: Ghost Rider  9 news posts
A total of 28 railway projects worth Rs 26,025 crore are in progress in the State of Jharkhand. It includes projects for lying 12 new lines at estimated cost of Rs 13,379 crore, gauge conversion of one line at cost of Rs 48.73 crore and doubling of 17 lines at cost of Rs 12,598 crore. Rajen Gohain, Minister of State for Railways stated in Rajya Sabha on July 29, 2016 in reply to the question raised by member of Rajya Sabha Parimal Nathwani.
The minister informed that the works for laying 12 new lines including Chitra-Basukinath (37 km), Godda-Pakur (80 km), Barwadih-Chirmari (182 km), Gaya-Bodhgaya-Chatra, Gaya-Natesar (Nalanda) (97 km), Gaya-Daltonganj via Rafiganj (136.88 km), Giridih-Koderma (102.5 km), Hansdiha-Godda (30 km), Koderma-Ranchi (189
...
more...
km), Koderma-Tilaiya (68 km), Pirpainti-Jasidih (97 km) and Rampurhat-Mandarhill via Dumka (130 km) with new MM for Rampurhat-Murarai (29.48 km) 3rd line are in progress.
Gauge conversion of Ranchi-Lohardaga with extension to Tori (113 km) is also going on, according to the statement laid on the table of the House. The work for doubling of lines including Garwa Road-Rail over rail (10 km), Gomoh-Flyover for down trains (15 km), Bondamunda-Ranchi (166 km), Chakradharpur-Goelkera 3rd line (34 km), Denea-Ranchi Road (25.2 km), Dhanbad-Sonnagar-Patratu 3rd line (291 km), Dongoaposi-Rajkharswan 3rd line (65 km), Garhwa Road-Ramna (32.32 km), Goelkera-Manohrpur 3rd line (40 km), Jarangdih-Danea (29.2 km), Khargpur-Adityapur 3rd line (132 km), Manoharpur-Bondamanda 3rd line (30 km), Rajkharswan-Chakradharpur 3rd line (20 km), Ramna-Singrauli (160 km), Ranchi Road-Patratu (31 km) and Sini-Adityapur (22.5 km) 3rd line are going on, as per the statement.
Nathwani wanted to know about on going and pending railway projects in the States of Gujarat and Jharkhand along with estimated cost of the projects. In Gujarat, total 20 railway projects with estimated cost of Rs 17,073 are in progress.
The minister stated that every railway project requires a number of clearances from various Ministries and Departments of State/Central Governments. These, inter-alia, include clearances inherent to land acquisition, forestry clearances and permission for crossing from departments like National Highway Authority of India, Public Works Department, Irrigation canals etc., and also clearances of Archeological Survey of India if the alignment is passing in vicinity of a protected monument, local bodies for project passing through urban areas, etc. which are part of project execution, he said. The progress of works is based on above factors and availability of funds, said the minister.
Jul 30 2016 (10:23)  झारखंड में 26,025 करोड़ रुपये की रेल परियोजनाएं (www.prabhatkhabar.com)
back to top
Other NewsSER/South Eastern  -  

News Entry# 275379   Blog Entry# 1945743     
   Tags   Past Edits
Jul 30 2016 (10:23AM)
Station Tag: Patratu/PTRU added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Sini Junction/SINI added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Adityapur/ADTP added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Kharagpur Junction/KGP added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Dhanbad Junction/DHN added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Patratu/PTRU added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Son Nagar Junction/SEB added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Chakradharpur/CKP added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Bondamunda/BNDM added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Netaji SC Bose Gomoh Junction/GMO added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Garhwa Road Junction/GHD added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Tori/TORI added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Lohardaga/LAD added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Rampurhat/RPH added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Jasidih Junction/JSME added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Ranchi Junction/RNC added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Koderma Junction/KQR added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Gaya Junction/GAYA added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Chirimiri/CHRM added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Ambikapur/ABKP added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Barwadih Junction/BRWD added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Pakur/PKR added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Basukinath/BSKH added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Chatra/CTR added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Jul 30 2016 (10:23AM)
Station Tag: Singrauli/SGRL added by Few SF trains in NCR have silver spoon of PRIORITY*^/100643

Posted by: धनबाद मंडल के बिना ECR बेकार है*^~  409 news posts
रेल राज्यमंत्री ने राज्यसभा में सांसद परिमल नथवाणी द्वारा पूछे गये प्रश्न के उत्तर में दी जानकारी
12 नयी लाइनें बिछाने, आमान परिवर्तन और 17 लाइनों के दोहरीकरण की परियोजनाएं हैं शामिल

रांची : झारखंड में कुल 26,025 करोड़ रुपये की अनुमानित लागत की रेलवे परियोजनाएं चल रही हैं. इनमें 13,379 करोड़ की लागत से 12 नयी लाइनें
...
more...
बिछाने, 48.73 करोड़ रुपये की लागत से आमान परिवर्तन और 12,598 करोड़ रुपये की लागत से 17 लाइनों के दोहरीकरण की परियोजनाएं शामिल हैं. केंद्रीय रेल राज्यमंत्री राजेन गोहांई ने राज्यसभा में शुक्रवार को सांसद परिमल नथवाणी द्वारा पूछे गये प्रश्न के उत्तर में यह जानकारी दी.

मंत्री ने बताया कि झारखंड में कुल 12 नयी लाइनें बिछाने की परियोजनाएं हैं. इनमें चतरा-बासुकीनाथ 37 किमी, गोड्डा-पाकुड़ 80 किमी, बरवाडीह-चिरमारी 182 किमी, गया- बोधगया-चतरा, गया-नातेसर (नालंदा) गिरिडीह-कोडरमा 102.5 किमी, हसदीह-गोड्डा 30 किमी, कोडरमा- रांची 189 किमी, कोडरमा-तिलैया 68 किमी, पीरपैंती-जसीडीह 97 किमी, और रामपुरहाट-मंदारहिल बरास्ता दुमका 130 किमी, लाइन शामिल है. सदन के पटल पर रखे गए विवरण के अनुसार, टोरी तक विस्तार सहित रांची- लोहारदगा 113 किमी का आमान परिवर्तन किया जा रहा है. राज्य में रेल लाइनों के दोहरीकरण की परियोजनाओं में गढ़वा रोड-रेल ओवर रेल 10 किमी, गोमी डाउन गाड़ियों के लिए फ्लाई ओवर 15 किमी, बंडामुंडा-रांची 166 किमी, चक्रधरपुर-गोइलकेरा तीसरी लाइन 34 किमी, रांची रोड 25 किमी, धनबाद-सोननगर-पतरातु तीसरी लाइन 291 किमी, डोंगापोसी- खरसावां तीसरी लाइन 65 किमी, गढ़वा रोड-रमना 32.32 किमी, गोयलकेरा-मनोहरपुर तीसरी लाइन 40 किमी, जरंगडीह-दानी 29.2 किमी, खड़गपुर-आदित्यपुर तीसरी लाइन 30 किमी, खरसावां-चक्रधरपुर तीसरी लाइन 20 किमी, रमना-सिंगरौली 160 किमी, रांची रोड-पतरातु 31 किमी और सिनी-आदित्यपुर तीसरी लाइन 22.5 शामिल हैं.

13288 views
Jul 30 2016 (11:35)
hiprasoon   338 blog posts   59 correct pred (77% accurate)
Re# 1945743-1            Tags   Past Edits
Bahut Kaam ho raha hai Jharkhand mein..logo unhi bol rahe hai Purvachal ko fayda ho raha hai due to Manoj Sinha.
Purvachal koi pucha nahi except Pt Kamla pati tripathi. Purvanchal ke naam par sirf BSB mein kuch hota tha ya fir GKP mein.
Page#    Showing 1 to 20 of 28 News Items  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.