Full Site Search  
Sun Jul 23, 2017 18:13:07 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Large Station Board;
Large Station Board;

SUNR/Surendranagar Junction (6 PFs)
સુરેન્દ્રનગર જંક્શન     सुरेंद्रनगर जंक्शन

Track: Double Diesel-Line

Type of Station: Junction
Number of Platforms: 6
Number of Halting Trains: 91
Number of Originating Trains: 6
Number of Terminating Trains: 6
80 Feet Road, Kalyan Nagar, Surendra Nagar, Gujarat - 363001
State: Gujarat
Elevation: 72 m above sea level
Zone: WR/Western
Division: Rajkot
3 Travel Tips
No Recent News for SUNR/Surendranagar Junction
Nearby Stations in the News

Rating: 3.6/5 (38 votes)
cleanliness - good (5)
porters/escalators - average (5)
food - good (5)
transportation - good (5)
lodging - good (4)
railfanning - good (5)
sightseeing - good (4)
safety - good (5)

Nearby Stations

SUNN/Surendranagar R.R.I 1 km     SRGT/Surendranagar Gate 1 km     JVN/Jorawarnagar Junction 3 km     WC/Wadhwan City 7 km     CJR/Chamaraj 7 km     KTDA/Katuda 10 km     BLRD/Bala Road 10 km     DXR/Digsar 13 km     BRGP/Bajrangpura 16 km     RJC/Rajsitapur 18 km    

Station News

Page#    Showing 1 to 12 of 12 News Items  
Jul 02 2017 (17:40)  हनुमानगढ़ सादुलपुर गंगानगर व सूरतगढ़ से चलने वाली ट्रेनों के फेरे बढ़ाए (m.bhaskar.com)
back to top
New/Special TrainsNWR/North Western  -  

News Entry# 307208     
   Tags   Past Edits
Jul 02 2017 (17:40)
Station Tag: Surendranagar Junction/SUNR added by vikaspoonia3/898867

Jul 02 2017 (17:40)
Station Tag: Shri Ganganagar Junction/SGNR added by vikaspoonia3/898867

Jul 02 2017 (17:40)
Station Tag: Hanumangarh Junction/HMH added by vikaspoonia3/898867

Jul 02 2017 (17:40)
Station Tag: Gogameri/GAMI added by vikaspoonia3/898867

Jul 02 2017 (17:40)
Station Tag: Gogameri/GAMI added by vikaspoonia3/898867

Jul 02 2017 (17:40)
Station Tag: Sadulpur Junction/SDLP added by vikaspoonia3/898867

Jul 02 2017 (17:40)
Station Tag: Sadulpur Junction/SDLP added by vikaspoonia3/898867

Jul 02 2017 (17:40)
Train Tag: Sadulpur - Shri Ganganagar Passenger Special/04771 added by vikaspoonia3/898867

Posted by: vikaspoonia3  7 news posts
हनुमानगढ़ से सादुलपुर के बीच चलने वाली स्पेशल ट्रेन के फेरे बढ़ाए गए तथा हनुमानगढ़ वेद गंगा नगर तथा गंगानगर व सूरतगढ़ के बीच चलने वाली ट्रेन के फेरे भी बनाए गए हैं
May 27 2016 (01:55)  Cabinet nod for Indian Railways infra projects worth Rs 10,736 cr (www.financialexpress.com)
back to top
IR Affairs

News Entry# 269155     
   Tags   Past Edits
May 27 2016 (1:55AM)
Station Tag: Katni Junction/KTE added by Baaz SGUJ WDP4~/1476622

May 27 2016 (1:55AM)
Station Tag: Bina Junction/BINA added by Baaz SGUJ WDP4~/1476622

May 27 2016 (1:55AM)
Station Tag: Jharsuguda Junction/JSG added by Baaz SGUJ WDP4~/1476622

May 27 2016 (1:55AM)
Station Tag: Kharagpur Junction/KGP added by Baaz SGUJ WDP4~/1476622

May 27 2016 (1:55AM)
Station Tag: Miraj Junction/MRJ added by Baaz SGUJ WDP4~/1476622

May 27 2016 (1:55AM)
Station Tag: Titlagarh Junction/TIG added by Baaz SGUJ WDP4~/1476622

May 27 2016 (1:55AM)
Station Tag: Vizianagaram Junction/VZM added by Baaz SGUJ WDP4~/1476622

May 27 2016 (1:55AM)
Station Tag: Londa Junction/LD added by Baaz SGUJ WDP4~/1476622

May 27 2016 (1:55AM)
Station Tag: Pune Junction/PUNE added by Baaz SGUJ WDP4~/1476622

May 27 2016 (1:55AM)
Station Tag: Burhwal Junction/BUW added by Baaz SGUJ WDP4~/1476622

May 27 2016 (1:55AM)
Station Tag: Roza Junction/ROZA added by Baaz SGUJ WDP4~/1476622

May 27 2016 (1:55AM)
Station Tag: Rajkot Junction/RJT added by Baaz SGUJ WDP4~/1476622

May 27 2016 (1:55AM)
Station Tag: Surendranagar Junction/SUNR added by Baaz SGUJ WDP4~/1476622

May 27 2016 (1:55AM)
Train Tag: Gitanjali Express/12860 added by Baaz SGUJ WDP4~/1476622

May 27 2016 (1:55AM)
Train Tag: Howrah - Mumbai CST AC Duronto Express/12262 added by Baaz SGUJ WDP4~/1476622

May 27 2016 (1:55AM)
Train Tag: Shipra Express/22911 added by Baaz SGUJ WDP4~/1476622

May 27 2016 (1:55AM)
Train Tag: Chennai Central - Asansol (Ratna) SF Express/12375 added by Baaz SGUJ WDP4~/1476622

May 27 2016 (1:55AM)
Train Tag: Satyagraha Express/15274 added by Baaz SGUJ WDP4~/1476622

May 27 2016 (1:55AM)
Train Tag: Sarvodaya Express/12476 added by Baaz SGUJ WDP4~/1476622

May 27 2016 (1:55AM)
Train Tag: Goa Express/12780 added by Baaz SGUJ WDP4~/1476622

Posted by: Baaz SGUJ WDP4~  118 news posts
Railway projects worth Rs 10,736 crore were cleared by the government today for improving infrastructure in various states, including Uttar Pradesh and Gujarat that go to polls next year.
The projects, including three for doubling of existing rail lines and two for laying a third rail line on busy routes, were cleared by the Cabinet Committee on Economic Affairs (CCEA) at its meeting chaired by Prime Minister Narendra Modi.
“I am happy to say that the CCEA has approved projects worth Rs 10,736 crore for doubling and tripling (of railway lines). There are
...
more...
a total of five new projects, three doubling projects for 763 kms and two third line projects for 514 kms.
“The benefit of these projects obviously will go to several states but two important states will benefit immensely, one is Gujarat and the other is Uttar Pradesh,” Railway Minister Suresh Prabhu said at a press conference after the meeting.
Providing details of the projects, he said, in Gujarat the CCEA has given approval for doubling of Surendranagar-Rajkot project at an estimated cost of Rs 1,002.39 crore with expected completion cost of Rs 1,137.17 crore with 5 per cent escalation per annum.
The length of the railway line will be 116.17 kms. The completion period of the project will be four years.
“It is a major push to Gujarat’s industrialisation ability,” he said.
He said the doubling of this line will greatly ease the ever increasing freight traffic between Okha-Rajkot, Porbandar-Kanalus, Veraval-Rajkot and Maliya Maiyana – Navalakhi-Dahinsara-Wankaner sections.
In UP, he said the doubling of Roza-Sitapur Cantt-Burhwal broad gauge single line project has been approved at an estimated cost of Rs 1,295.42 crore with expected completion cost of Rs 1,486.46 crore with 5 per cent escalation per annum.
The length of the railway line will be 180.77 kms. The completion period of the project will be five years.
The doubling of this line between Burhwal junction and Roza junction will fulfill the demand of the increasing traffic leading to socio-economic development of the area. Besides, there will be continuous double line track available from Gorakhpur to Delhi via Sitapur Cantonment and Moradabad. Barabanki and Sitapur districts of UP would also be benefited through this project.
Prabhu said the CCEA also gave its nod for doubling of Pune-Miraj-Londa railway line in Maharashtra at an estimated cost of Rs 3,627.47 crore and expected completion cost of Rs 4,246.84 crore in five years keeping in view the 5 per cent escalation per annum.
The length of the railway line will be 467 kms.
Besides the travelling people, industries in and around Miraj-Londa section will have additional transport capacity to meet their requirements.
Doubling of this line will greatly ease the ever increasing freight traffic on the Pune-Miraj-Londa section thereby increasing the revenue of the Railways, a railway ministry statement said.
The Pune-Miraj section is non-electrified single line on diesel traction and it is oversaturated.
“The additional traffic running over and above 100 per cent of utilisation is proposed to be diverted on the proposed doubling. The doubling of the section would come as an advantage as it would strengthen the rail network necessary to operate more passenger trains with increased speed and better efficiency,” it said.
Prabhu said the CCEA also granted approval for the Vizianagaram and Titlagarh third line project at an estimated cost of Rs 2,335.68 crore. The length of the railway line will be 264.6 kms. The completion period of the project will be five years.
The third line is an alternative route to the over-burdened existing line and this link will also open an alternative route to oversaturated Kharagpur–Jharsuguda section Howrah-Mumbai Grand Trunk Route and Howrah-Chennai section main line of East Coast Railways.
Rayagada and Kalahandi districts of Odisha and Vizianagaram and Babbili districts of Andhra Pradesh will benefit from this project.
The section is oversaturated with present capacity utilisation of 106 per cent and there is a huge detention to rolling stock.
The Bina-Katni third line project under West Central Railway (WCR) was also approved at an estimated cost of Rs 2,478.23 crore and expected completion cost of Rs 2,917.06 crore in five years. The line will be 278.7 kms long.
Besides facilitating passenger travel, the thermal power plants in the area will get a third line for transportation.
It will also greatly ease the ever-increasing freight traffic between Bina-Katni section increasing the railways’ earnings. Sagar, Damoh and Katni districts of Madhya Pradesh will benefit from this project, the ministry said.
The Bina-Katni is critical and busy section of WCR serving coal rakes for thermal power plants at Chhabra Gugur and Jhalawar in Rajasthan and paints, oils and lubricants (POL) traffic for Mahadevkhedi in Madhya Pradesh. At present, the capacity utilisation of the section is 136 per cent, the statement said.
Asked if the approved projects had been accounted for in the Rail Budget, Prabhu said, “Most of them are a mix, but some projects mentioned are with trans-budgetary support and some with extra-budgetary support.”
The completion of these projects, he said, will be between three to five years but the time limits given are outer limits and the government will be able to complete the projects earlier.
May 25 2016 (20:00)  Govt clears railway projects worth Rs 10,736 crore (ncairways.com)
back to top
Rail BudgetNER/North Eastern  -  

News Entry# 269012     
   Tags   Past Edits
May 25 2016 (8:00PM)
Station Tag: Burhwal Junction/BUW added by NC Airways/1444164

May 25 2016 (8:00PM)
Station Tag: Roza Junction/ROZA added by NC Airways/1444164

May 25 2016 (8:00PM)
Station Tag: Rajkot Junction/RJT added by NC Airways/1444164

May 25 2016 (8:00PM)
Station Tag: Surendranagar Junction/SUNR added by NC Airways/1444164

May 25 2016 (8:00PM)
Station Tag: Sitapur Cantt./SCC added by NC Airways/1444164

May 25 2016 (8:00PM)
Station Tag: Barabanki Junction/BBK added by NC Airways/1444164

May 25 2016 (8:00PM)
Station Tag: Gorakhpur Junction/GKP added by NC Airways/1444164

Posted by: NC Airways  28 news posts
Govt clears railway projects worth Rs 10,736 crore to improve infrastucture - Gujarat and Uttar Pradesh will be immensely benefited by these projects.
Gujarat and U.P. are poll bound.
These two states being major beneficiaries as per Railway Minister Suresh Prabhu.
May 11 2016 (18:15)  ADDITIONAL STOPPAGE TO 09205/09206 BHAVNAGAR-JAMMU TAWI WEEKLY SUMMER SPECIAL TRAIN AT SURENDRA NAGAR GATE STATION WITH IMMEDIADE EFFECT (www.nr.indianrailways.gov.in)
back to top
Temporary StopsNR/Northern  -  IR Press Release  

News Entry# 267536     
   Tags   Past Edits
May 11 2016 (6:15PM)
Station Tag: Surendranagar Junction/SUNR added by ameyambre/16020

May 11 2016 (6:15PM)
Train Tag: Jammu Tawi - Bhavnagar Terminus SpecialFare Special/09206 added by ameyambre/16020

May 11 2016 (6:15PM)
Train Tag: Bhavnagar Terminus - Jammu Tawi SpecialFare Special/09205 added by ameyambre/16020

Posted by: Amey Ambre~  1942 news posts
For the convenience of rail passengers, Railways have decided to provide additional stoppage to the train no. 09205/09206 Bhavnagar-Jammu Tawi Summer Special Train at Surendra Nagar Gate station with immediade effect as under:
The 09205 Bhavnagar-Jammu Tawi Summer Special Train will reach Surendra Nagar Gate station at 04.30 p.m. and depart from there at 04.31 p.m. ( o­ne minute stoppage ) ,while its return service, the 09206 Jammu Tawi – Bhavnagar Summer Special Train will reach Surendra Nagar Gate station at 01.46 p.m, and depart from there at 01.48 p.m. .( two minute stoppage ) with immediade effect.
Jun 29 2015 (10:23)  Restoration of rly track to Pipavav port begins (epaperbeta.timesofindia.com)
back to top
Other NewsWR/Western  -  

News Entry# 231390     
   Tags   Past Edits
Jun 29 2015 (10:23AM)
Station Tag: Surendranagar Junction/SUNR added by karthikiyer27/248735

Posted by: karthik iyer^~  610 news posts
Restoration of badlydamaged railway track that connects Pipavav Port with Surendranagar began on Sunday . However, work was halted temporarily by people of Borala and Juna Savar villages of Savarkundla. They were demanding construction of a bridge there as the elevated tracks were obstructing the natural flow of rain water.
The 4km long track between Liliya and Savarkundla, which was washed away during flash floods last week, is key to resuming rail traffic from Pipavav Port to Surendranagar and north Indian states. The tracks have been laid on an elevated land about 10 feet higher than ground level of these villages.
On
...
more...
Sunday , as soon as rail way authorities began restora tion work people from Borala and Juna Savar villages rushed to the spot and said they would not allow them to work unless they build an overbridge there.
“Because of the tracks, natural flow of flood water was obstructed causing flooding in Borala and Juna Savar. We demand that the authority construct a bridge so that flood water can flow,“ Kamlesh Kanani, a resident of Juna Savar village told TOI. Following the protest, rail way authorities assured villagers that they will find out a solution and work resumed. “We have assured villagers of a solution. We will put up pipes under the track to drain rain water as an alternate arrangement for now,“ Jyoti Prakash Pandey , di visional railway manager at Bhavnagar, told media persons.