Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Gujarat Mail - as good as Undhiyu

Search Trains
Post PNR
IMAGINARY Train. NOT an ACTUAL running Train.
(Imaginary Trains are created by RailFans to explore various alternative Train Routes and TTs. Such trains are NOT ACTUALLY RUNNING on the tracks.)
Availability Calendar
Search CSTM to MAS
PDF Download

IMG12261-923594/♥♥Duronto Express♥♥
एक्सप्रेस

CSTM/Mumbai CSM Terminus --> MAS/MGR Chennai Central

IMAGINARY Train.
guest
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
The Shortest Route between CSTM and MAS is 21 km (2%) shorter.
Travel Time: 20h 0m     4 halts
Distance: 1278 km     Avg Speed: 64 km/hr
Max Permissible Speed: n/a
Departs @ 09:00
Mumbai CSM Terminus/CSTM 
Platform# --
 
Mon
 
Wed
 
Fri
 
Arrives @ 05:00 +1 night
MAS/MGR Chennai Ctrl 
Platform# --
 
 
Tue
 
Thu
 
Sat
Type: Duronto
Rake Zone: ???/???
Non-Specific
0 Follows
8
Bedroll/Linen: Don't know change
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✕ E-Catering
ICF Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 A1
  3
HA1
  4
 PC
  5
 B3
  6
 B2
  7
 B1
  8
 S7
  9
 S6
 15
SLR
 14
 S1
 13
 S2
 12
 S3
 11
 S4
 10
 S5
RSA - Rake Sharing
NA
Loco

Show ALL intermediate Stations

4 halts. 243 intermediate Stations between Mumbai CSM Terminus and MGR Chennai Central
#1
0.0 km
/==/
Zone: CR
Speed: 54
Elev: 14m

09:00
Day: 1
189.5 km
67 intermediate stations
02:50
#2
189.5 km
/==/
Zone: CR
Speed: 75
Elev: 560m
11:50
12:00
Day: 1
Technical Halt Loco Change from KYN WCAM3 to Twin GTY WDM3D
262.4 km
38 intermediate stations
03:30
#3
451.9 km
/==/
Zone: CR
Speed: 60
Elev: 455m
15:30
15:35
Day: 1
Technical Halt Crew Change
379.2 km
49 intermediate stations
05:35
#4
831.1 km
/==/
Zone: SCR
Speed: 88
Elev: 451m
21:10
21:30
Day: 1
Technical Halt Loco Change from Twin GTY WDM 3D to RPM WAP7
310.1 km
42 intermediate stations
04:55
#5
1141.2 km
/==/
Zone: SCR
Speed: 55
Elev: 115m
02:25
02:30
Day: 2
Technical Halt Crew Change
136.8 km
43 intermediate stations
02:30
#6
1277.9 km
/==/
Zone: SR

Elev: 3m
05:00

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy