Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

22222/22221-->Aapli Rajdhani, Asli VIP number waali - Somanko

Search Trains
Post PNR




Availability Calendar
Search DAB to MMR
Return# 17687
PDF Download

17688/Marathwada Express
Other Names: High Court Express
मराठवाडा एक्सप्रेस

DAB/Dharmabad --> MMR/Manmad Junction

Updated: Jul 15 (09:05) by NamanL^~
Jul 15 (09:05)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips


Other Trains in the News
The Shortest Route between DAB and MMR is 2 km (0%) shorter.
Travel Time: 9h 20m     18 halts
Distance: 421 km     Avg Speed: 45 km/hr
Max Permissible Speed: 110 km/hr
Departs @ 04:00
Dharmabad/DAB 
Platform# --
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Arrives @ 13:20
MMR/Manmad Jn 
Platform# 5
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Type: Mail/Express
Rake Zone: SCR/South Central
Latest News
(You need to double-check/verify this info yourself)
Train No. 17688 Dharmabad - Manmad Marathwada express is partially cancelled between Dharmabad to Nanded on 8.3.2024
Thu Mar 07, 2024 (11:21PM)
News History
JCO 3rd, 7th, 10th, 14th, 17th, 21st, 24th, 28th January, 2024 is partially Cancelled between Dharmabad –Nanded.
Fri Dec 29, 2023 (09:06AM)
🔹 Train no. 17688/Marathwada Express JCO 23.03.2023 to 26.03.2023 will be partially cancelled between Manmad - Rotegaon due to non-interlocking work at Nagarsol station in Parbhani – Manmad section.
Mon Mar 20, 2023 (09:26PM)
🔹 Train no. 17688/Marathwada Express JCO 12.03.2023 & 15.03.2023 will be rescheduled by 60 minutes (1 hr) due to traffic block.
Mon Mar 20, 2023 (05:11PM)
To facilitate track renewal works, a traffic block has been imposed. Consequently, train num 17688 will remain partially cancelled between Aurangabad - Manmad on journey commencing on 31.01.2022, 02.02.2022, 05.02.2022 & 07.02.2022.
Mon Jan 31, 2022 (01:20AM)
▪️CC:- CC—2, 2S—14, SLR/D—2▪️
Tue Dec 22, 2020 (09:13PM)
0 Follows
Rating: 3.1/5 (12 votes)
cleanliness - average (2)
punctuality - good (2)
food - average (2)
ticket avbl - excellent (2)
u/r coach - excellent (1)
railfanning - average (2)
safety - average (2)
Bedroll/Linen: NOT Available change
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
ICF Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 D1
  3
 D2
  4
 C2
  5
 C1
  6
 D3
  7
 D4
  8
 D5
  9
 GS
 18
SLR
 17
 GS
 16
 GS
 15
 GS
 14
 GS
 13
 GS
 12
 GS
 11
 GS
 10
 GS
RSA - Rake Sharing
17617/17618/17687/17688. Total 3 Rakes with PM @ NED




Loco
DAB -> MMR


Show ALL intermediate Stations

18 halts. 50 intermediate Stations between Dharmabad and Manmad Junction
#1
0.0 km
%==%
Zone: SCR
Speed: 68
Elev: 355m

04:00
Day: 1
13.6 km
2 intermediate stations
00:12
#2
13.6 km
%==%
Zone: SCR
PF#: 1
Speed: 60
Elev: 357m
04:12
04:13
Day: 1
15.9 km
1 intermediate stations
00:16
#3
29.5 km
%==%
Zone: SCR
PF#: 1
Speed: 42
Elev: 384m
04:29
04:30
Day: 1
19.7 km
2 intermediate stations
00:28
#4
49.1 km
%==%
Zone: SCR
Speed: 54
Elev: 372m
04:58
05:00
Day: 1
22.4 km
3 intermediate stations
00:25
#5
71.5 km
/==/
Zone: SCR
Speed: 61
Elev: 362m
05:25
05:30
Day: 1
30.4 km
3 intermediate stations
00:30
#6
102.0 km
/==/
Zone: SCR
Speed: 52
Elev: 382m
06:00
06:05
Day: 1
28.4 km
2 intermediate stations
00:33
#7
130.4 km
/==/
Zone: SCR
Speed: 97
Elev: 412m
06:38
06:40
Day: 1
Remote Location Quota Starting and Charting Station.
27.6 km
2 intermediate stations
00:17
#8
157.9 km
/--/
Zone: SCR
Speed: 47
Elev: 422m
06:57
06:58
Day: 1
14.9 km
1 intermediate stations
00:19
#9
172.8 km
/--/
Zone: SCR
Speed: 63
Elev: 435m
07:17
07:18
Day: 1
27.3 km
2 intermediate stations
00:26
#10
200.1 km
/--/
Zone: SCR
Speed: 94
Elev: 464m
07:44
07:45
Day: 1
14.1 km
1 intermediate stations
00:09
#11
214.2 km
/--/
Zone: SCR
PF#: 1
Speed: 35
Elev: 467m
07:54
07:55
Day: 1
30.7 km
2 intermediate stations
00:53
#12
244.8 km
/--/
Zone: SCR
Speed: 60
Elev: 502m
08:48
08:50
Day: 1
19.1 km
1 intermediate stations
00:19
#13
263.9 km
/--/
Zone: SCR
Speed: 118
Elev: 523m
09:09
09:10
Day: 1
37.4 km
3 intermediate stations
00:19
#14
301.3 km
/--/
Zone: SCR
PF#: 1
Speed: 25
Elev: 594m
09:29
09:30
Day: 1
6.2 km
0 intermediate stations
00:15
#15
307.5 km
%==%
Zone: SCR
Speed: 51
Elev: 556m
09:45
09:50
Day: 1
Remote Location Quota Starting and Charting Station.
33.7 km
2 intermediate stations
00:40
#16
341.2 km
%==%
Zone: SCR
Speed: 27
Elev: 536m
10:30
10:31
Day: 1
27.0 km
2 intermediate stations
00:59
#17
368.3 km
%==%
Zone: SCR
Speed: 37
Elev: 546m
11:30
11:31
Day: 1
28.0 km
1 intermediate stations
00:45
#18
396.3 km
%==%
Zone: SCR
Speed: 20
12:16
12:21
Day: 1
9.5 km
0 intermediate stations
00:28
#19
405.9 km
%==%
Zone: CR
Speed: 39
Elev: 617m
12:49
12:50
Day: 1
15.1 km
2 intermediate stations
00:30
#20
420.9 km
/--/
Zone: CR
PF# 5

Elev: 558m
13:20

Day: 1


Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy