Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Amritsar Jan Seva Express: हम मजदूर है साहब! - Piyush Singh

Search Trains
Post PNR




Large TB;
Entry# 5206746-0
Side View; Small TB; Outside of Train; Standing at Station;
Entry# 5206746-0


Availability Calendar
Search GTNR to KYQ
Return# 15077
PDF Download

15078/Gomti Nagar - Kamakhya Weekly Express
गोमती नगर - कामाख्या साप्ताहिक एक्सप्रेस

GTNR/Gomti Nagar (Lucknow) --> KYQ/Kamakhya Junction

Updated: May 21 (12:07) by AAM_INSAAN^~
May 21 (12:07)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips


Other Trains in the News
The Shortest Route between GTNR and KYQ is 26 km (2%) shorter.
Travel Time: 28h 0m     12 halts
Distance: 1379 km     Avg Speed: 49 km/hr
Max Permissible Speed: 110 km/hr
Departs @ 10:00
Gomti Nagar (Lucknow)/GTNR 
Platform# 6
 
Mon
 
 
 
 
 
Arrives @ 14:00 +1 night
KYQ/Kamakhya Jn 
Platform# 3,4
 
 
Tue
 
 
 
 
Type: Mail/Express
Rake Zone: NER/North Eastern
Latest News
(You need to double-check/verify this info yourself)
JCO 23.09.24 is diverted via Mathabhanga - New Coochbehar:
Tue Sep 24, 2024 (01:17PM)
News History
JCO 26.02.2024 is Diverted Via New Bongaigaon- Rangiya - Kamakhya.
Thu Feb 22, 2024 (08:33PM)
🔹JCO 18.12.2023 , 25.12.2023, 01.01.2024, 08.01.2024 & 15.01.2024 To be Short Originated from Gorakhpur.
Thu Dec 14, 2023 (06:55PM)
🔹Train no. 15078/Gomti Nagar - Kamakhya Weekly Express JCO 11/12/2023, 18/12/23, 25/12/23, 01/01/2024, 08/01/24 and 15/01/2024 (Mondays) will be fully cancelled.
Sat Dec 09, 2023 (05:09PM)
JCO 16.10.2023 is Diverted Via New Bongaigaon - Rangiya - Kamakhya.
Tue Oct 10, 2023 (10:10AM)
JCO 17/10/2023 will remain cancelled.
Sat Oct 07, 2023 (09:03PM)
JCO 11/09/2023 is cancelled.
Wed Sep 06, 2023 (05:35PM)
JCO 04/09/2023 is cancelled.
Thu Aug 31, 2023 (02:25PM)
🔹15078 Gomti Nagar -Kamakhya express JCO 28.0823 will remain cancelled.
Wed Aug 09, 2023 (01:16AM)
• Cancelled on 20.02.2023 & 27.02.2023 Ex. Gomtinagar.
Sat Feb 18, 2023 (08:37PM)
Will Arrive Depart NBQ at 10;00 & GLPT at 10;40 and will arrive at Kamakhya (KYQ) at 13;50 from 27/02/2023 Onwards.
Tue Feb 14, 2023 (07:51PM)
15078 will be diverted via New Bongaigaon-Rangiya-Kamakhya on 26th December 2022.
Sun Dec 25, 2022 (12:03PM)
JCO 29.08.2022 will remain cancelled.
Tue Aug 23, 2022 (08:31PM)
CC:- 2A - 2, 3A - 6, SL - 6, 2S - 4, EOG - 1, SLR/D - 1
Wed Jan 05, 2022 (02:20PM)
2 Follows
Rating: 4.2/5 (6 votes)
cleanliness - good (1)
punctuality - good (1)
food - average (1)
ticket avbl - excellent (1)
u/r coach - n/a (0)
railfanning - excellent (1)
safety - excellent (1)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Thu Jan 06, 2022
Pantry/Catering
✕ Pantry Car
✕ On-board Catering
✓ E-Catering
E-Catering Is Available at GKP, CPR, NBQ & KYQ.
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 B8
  3
 B7
  4
 B6
  5
 B5
  6
 B4
  7
 B3
  8
 B2
  9
 B1
 18
 GN
 17
 S1
 16
 S2
 15
 S3
 14
 S4
 13
 S5
 12
 S6
 11
 A1
 10
 A2
 19
 GN
 20
 GN
 21
 GN
 22
SLR
RSA - Rake Sharing
15089 - 15090 II PM @ GTNR with RBPC




Show ALL intermediate Stations

12 halts. 225 intermediate Stations between Gomti Nagar (Lucknow) and Kamakhya Junction
#1
0.0 km
%≡≡%
Zone: NER
PF# 6
Speed: 58
Elev: 117m

10:00
Day: 1
109.3 km
17 intermediate stations
01:53
#2
109.3 km
%≡≡%
Zone: NER
PF# 2
Speed: 76
Elev: 105m
11:53
11:58
Day: 1
88.4 km
13 intermediate stations
01:10
#3
197.8 km
/==/
Zone: NER
PF# 4
Speed: 38
Elev: 99m
13:08
13:11
Day: 1
Xing with 15707/Amrapali Express | Mon
63.5 km
9 intermediate stations
01:39
#4
261.2 km
%≡≡%
Zone: NER
Speed: 49
Elev: 84m
14:50
15:00
Day: 1
Remote Location Quota Starting and Charting Station
49.1 km
6 intermediate stations
01:00
#5
310.3 km
/==/
Zone: NER
PF# 3
Speed: 83
Elev: 78m
16:00
16:05
Day: 1
69.5 km
9 intermediate stations
00:50
#6
379.8 km
/==/
Zone: NER
PF# 1
Speed: 43
Elev: 69m
16:55
17:00
Day: 1
61.2 km
9 intermediate stations
01:25
#7
441.0 km
/==/
Zone: NER
PF# 4,5
Speed: 42
Elev: 58m
18:25
18:35
Day: 1
59.5 km
13 intermediate stations
01:25
#8
500.5 km
/==/
Zone: ECR
PF# 2
Speed: 40
Elev: 55m
20:00
20:05
Day: 1
87.5 km
21 intermediate stations
02:10
#9
588.0 km
%≡≡%
Zone: ECR
PF# 2
Speed: 53
Elev: 48m
22:15
22:25
Day: 1
Remote Location Quota Starting and Charting Station
181.0 km
32 intermediate stations
03:25
#10
769.0 km
/==/
Zone: NFR
Speed: 61
Elev: 32m
01:50
02:00
Day: 2
183.8 km
34 intermediate stations
03:00
#11
952.8 km
/==/
Zone: NFR
PF# 1,1A
Speed: 55
Elev: 114m
05:00
05:10
Day: 2
250.8 km
34 intermediate stations
04:35
#12
1203.6 km
/==/
Zone: NFR
PF# 1A,1B
Speed: 53
Elev: 60m
09:45
09:50
Day: 2
Loco change from Electric to Diesel
51.4 km
5 intermediate stations
00:58
#13
1255.0 km
/==/
Zone: NFR
PF# 1
Speed: 39
Elev: 49m
10:48
10:50
Day: 2
124.1 km
11 intermediate stations
03:10
#14
1379.1 km
%==%
Zone: NFR
PF# 3,4

Elev: 56m
14:00

Day: 2


Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy