Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

FmT LIVE - Follow my Trip with me... LIVE

Gujarat Mail - as good as Undhiyu

Search Trains
Post PNR
Medium; Side View; Small TB; 2 AC; Outside of Train; Standing at Station;
Entry# 3678978-0
Small TB;
Entry# 3906965-0


Availability Calendar
Search ANVT to NHLN
Return# 22411
PDF Download

22412/Arunachal AC SF Express
ਅਰੁਣਾਚਲ ਐ.ਸੀ. ਸੁਪਰਫਾਸਟ ਐਕਸਪ੍ਰੈਸ/اروناچل (اے- سی) سوپرفاسٹ ایکسپریس     अरुणाचल वातानुकूलित सुपरफास्ट एक्सप्रेस

ANVT/Anand Vihar Terminal --> NHLN/Naharlagun

Updated: Nov 18 2021 (16:59) by Vinay Kumar^~
Nov 18 2021 (16:59)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
The Shortest Route between ANVT and NHLN is 73 km (3%) shorter.
Travel Time: 37h 55m     15 halts
Distance: 2124 km     Avg Speed: 56 km/hr
Max Permissible Speed: 130 km/hr between CPYZ/Chipyana Buzurg and PNKD/Panki Dham
Departs @ 16:45
Anand Vihar Terminal/ANVT 
Platform# 4
Sun
 
 
 
Thu
 
 
Arrives @ 06:40 +2 nights
NHLN/Naharlagun 
Platform# 1
 
 
Tue
 
 
 
Sat
Type: AC SuperFast
Rake Zone: NR/Northern
Latest News
(You need to double-check/verify this info yourself)
JCO 13.01.2022 diverted via NJP - SGUJ - NMZ - APDJ - SMTA; ILP (Inner Line Permit, a permission required for mainland Indian citizen to be able to travel into a some restricted/protected state of North-East India) is needed in ticket booking time to/from Naharlagun.
Fri Jan 14, 2022 (09:14AM)
News History
JCO 12.01.2022 diverted via NJP - SGUJ - NMZ - APDJ - SMTA; ILP (Inner Line Permit, a permission required for mainland Indian citizen to be able to travel into a some restricted/protected state of North-East India) is needed in ticket booking time to/from Naharlagun.
Fri Jan 14, 2022 (09:12AM)
ट्रेन संख्या 22412 नई दिल्ली-नाहरलागुन अरुणाचल एसी एक्सप्रेस 06.01.2022 को शुरू होने वाली यात्रा के लिए हाजीपुर-मुजफ्फरपुर-समस्तीपुर-बरौनी रूट पर चलेगी।; ILP (Inner Line Permit, a permission required for mainland Indian citizen to be able to travel into a some restricted/protected state of North-East India) is needed in ticket booking time to/from...
more...
Naharlagun.
Wed Jan 05, 2022 (07:38PM)
ILP (Inner Line Permit, a permission required for mainland Indian citizen to be able to travel into a some restricted/protected state of North-East India) is needed in ticket booking time to/from Naharlagun.
Thu Dec 23, 2021 (10:22AM)
◉ One rake has reverse rake composition.
Thu Oct 28, 2021 (05:18PM)
1 Follows
Rating: 3.7/5 (241 votes)
cleanliness - good (42)
punctuality - average (45)
food - good (37)
ticket avbl - good (39)
railfanning - excellent (39)
safety - good (39)
Inaugural Run
Sun Feb 22, 2015
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 B1
  3
 B2
  4
 B3
  5
 B4
  6
 B5
  7
 B6
  8
 B7
  9
 B8
 18
 A5
 17
 A4
 16
 A3
 15
 A2
 14
 A1
 13
 PC
 12
B11
 11
B10
 10
 B9
 19
 H1
 20
EOG
RSA - Rake Sharing
No RSA, 2 rakes, PM @ ANVT

Show ALL intermediate Stations

Time-Table has Changed. Show Changes
Source Station Changed.
15 halts. 338 intermediate Stations between Anand Vihar Terminal and Naharlagun
#1
0.0 km
/==/
Zone: NR
PF# 4
Speed: 87

16:45
Day: 1
428.0 km
62 intermediate stations
04:55
#2
428.0 km
/==/
Zone: NCR
PF# 9
Speed: 51
Elev: 129m
21:40
21:45
Day: 1
Remote Location Quota Starting and Charting Station.
72.0 km
12 intermediate stations
01:25
#3
499.9 km
/==/
Zone: NR
PF# 3
Speed: 57
23:10
23:20
Day: 1
269.5 km
42 intermediate stations
04:45
#4
769.4 km
/==/
Zone: NER
PF# 6
Speed: 68
Elev: 84m
04:05
04:15
Day: 2
118.6 km
16 intermediate stations
01:45
#5
888.0 km
/==/
Zone: NER
PF# 2
Speed: 52
Elev: 69m
06:00
06:05
Day: 2
61.2 km
9 intermediate stations
01:10
#6
949.2 km
/==/
Zone: NER
PF# 4
Speed: 48
07:15
07:20
Day: 2
59.5 km
13 intermediate stations
01:15
#7
1008.7 km
/==/
Zone: ECR
PF# 2
Speed: 62
Elev: 55m
08:35
08:40
Day: 2
87.5 km
21 intermediate stations
01:25
#8
1096.2 km
/==/
Zone: ECR
PF# 4
Speed: 45
10:05
10:15
Day: 2
181.0 km
31 intermediate stations
04:00
#9
1277.2 km
/==/
Zone: NFR
PF# 3
Speed: 85
14:15
14:25
Day: 2
Remote Location Quota Starting and Charting Station.
202.3 km
40 intermediate stations
03:15
#10
1479.5 km
/==/
Zone: NFR
PF# 1A
Speed: 77
Elev: 114m
17:40
17:50
Day: 2
Remote Location Quota Starting and Charting Station.
Xing with 13148/Uttar Banga Express | Mon,Fri
125.5 km
17 intermediate stations
01:38
#11
1605.0 km
/==/
Zone: NFR
Speed: 56
19:28
19:30
Day: 2
Xing with 15658/Brahmaputra Mail | Mon,Fri
125.2 km
16 intermediate stations
02:15
#12
1730.3 km
/==/
Zone: NFR
Speed: 47
21:45
21:50
Day: 2
Remote Location Quota Starting and Charting Station.
109.1 km
14 intermediate stations
02:20
#13
1839.3 km
%==%
Zone: NFR
Speed: 80
00:10
00:15
Day: 3
Loco changes from electric to diesel.
61.2 km
5 intermediate stations
00:46
#14
1900.6 km
|--|
Zone: NFR
Speed: 42
Elev: 111m
01:01
01:03
Day: 3
61.6 km
7 intermediate stations
01:27
#15
1962.2 km
|--|
Zone: NFR
PF# 3
Speed: 58
02:30
02:45
Day: 3
142.6 km
17 intermediate stations
02:28
#16
2104.7 km
|--|
Zone: NFR
PF# 1
Speed: 14
05:13
05:15
Day: 3
19.4 km
1 intermediate stations
01:25
#17
2124.1 km
|--|
Zone: NFR
PF# 1

Elev: 132m
06:40

Day: 3
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy