Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Karnataka express - 1977 ರಿಂದ ಸಿಲಿಕಾನ್ ಕಣಿವೆಯ ಭೂಮಿಯನ್ನು ತಾಂತ್ರಿಕ ಮನಸ್ಸುಗಳೊಂದಿಗೆ ಪ್ರಜಾಸತ್ತಾತ್ಮಕ ಪ್ರಧಾನ ಕಛೇರಿಯೊಂದಿಗೆ ದೇಶಭಕ್ತಿಯ ಮನಸ್ಸುಗಳೊಂದಿಗೆ ಸಂಪರ್ಕಿಸುತ್ತಿದೆ - Sakthivel Srinivasan

Search Trains
Post PNR




Medium; Side View; Small TB; 3 AC; Outside of Train; Standing at Station;
Entry# 5627346-0
Medium; Side View; Small TB; EOG/SLR; Outside of Train; Standing at Station;
Entry# 5627346-0


Availability Calendar
Search KCVL to SMVB
Return# 16320
PDF Download

16319/Thiruvananthapuram North (Kochuveli) - SMVT Bengaluru Humsafar Express
Other Names: Banaswadi Humsafar
तिरुवनंतपुरम उत्तर (कोच्चुवेली) - सर एम. विश्वेश्वरय्या टर्मिनल बेंगलूरु हमसफर एक्सप्रेस

KCVL/Thiruvananthapuram North (Kochuveli) --> SMVB/SMVT Bengaluru

Updated: Dec 13 2023 (00:50) by Siddharth98^~
Dec 13 2023 (00:50)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips


Other Trains in the News
The Shortest Route between KCVL and SMVB is 89 km (11%) shorter.
Travel Time: 15h 40m     11 halts
Distance: 826 km     Avg Speed: 53 km/hr
Max Permissible Speed: 110 km/hr
Departs @ 18:05
Thiruvananthapuram North (Kochuveli)/KCVL 
Platform# --
 
 
 
 
Thu
 
Sat
Arrives @ 09:45 +1 night
SMVB/SMVT Bengaluru 
Platform# --
Sun
 
 
 
 
Fri
 
Type: Humsafar
Rake Zone: SR/Southern
Latest News
(You need to double-check/verify this info yourself)
ØTrain No. 16319 Kochuveli – SMVT Bengaluru Humsafar Express leaving Kochuveli at 18.05 hrs from 13th June to 02nd July, 2024 on Thursdays and Saturdays will be augmented with One Sleeper Class Coach
Wed Jun 12, 2024 (08:58AM)
News History
Train No. 16319 Kochuveli – SMVT Bengaluru Humsafar Express scheduled to leave Kochuveli at 18.05 hrs on 16.05.2024 is rescheduled to leave Kochuveli at 19.45 hrs due to late arrival of pairing rake.
Thu May 16, 2024 (05:08PM)
Railway board and the Competent authority has decided to operate the 16319 from Sir Mokhsagundam Visveswaraya Terminal Bengaluru (SMVB) WEF 11.06.2022.
Sat May 21, 2022 (08:46PM)
Train No. 16319 Kochuveli - Banaswadi Humsafar Bi-Weekly Express commencing journey from Kochuveli o­n 14.05.2022, 21.05.2022, 28.05.2022 and 04.06.2022 will be regulated for 15 minutes en-route.
Thu May 12, 2022 (01:44PM)
Composition : 16 LWACCNH & 2 LWLRRM = 18 » Services restored w.e.f 08.07.21
Thu Jul 01, 2021 (09:42PM)
1 Follows
Rating: 3.6/5 (37 votes)
cleanliness - good (7)
punctuality - average (7)
food - poor (2)
ticket avbl - excellent (7)
railfanning - good (7)
safety - good (7)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Sat Oct 20, 2018
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 S1
  3
 PC
  4
 S2
  5
 B1
  6
 B2
  7
 B3
  8
 B4
  9
 B5
 18
B14
 17
B13
 16
B12
 15
B11
 14
B10
 13
 B9
 12
 B8
 11
 B7
 10
 B6
 19
B15
 20
B16
 21
EOG


Show ALL intermediate Stations

11 halts. 146 intermediate Stations between Thiruvananthapuram North (Kochuveli) and SMVT Bengaluru
#1
0.0 km
/==/
Zone: SR
Speed: 55
Elev: 5m

18:05
Day: 1
57.5 km
14 intermediate stations
01:03
#2
57.5 km
/==/
Zone: SR
Speed: 72
Elev: 11m
19:08
19:10
Day: 1
61.0 km
8 intermediate stations
00:51
#3
118.4 km
/==/
Zone: SR
Speed: 57
Elev: 9m
20:01
20:03
Day: 1
35.0 km
3 intermediate stations
00:37
#4
153.5 km
/==/
Zone: SR
Speed: 40
Elev: 4m
20:40
20:43
Day: 1
60.0 km
12 intermediate stations
01:29
#5
213.4 km
/==/
Zone: SR
PF# 1
Speed: 52
Elev: 2m
22:12
22:15
Day: 1
71.5 km
13 intermediate stations
01:23
#6
284.9 km
/==/
Zone: SR
Speed: 59
Elev: 3m
23:38
23:40
Day: 1
75.4 km
14 intermediate stations
01:17
#7
360.3 km
/==/
Zone: SR
Speed: 38
Elev: 78m
00:57
01:00
Day: 2
55.7 km
7 intermediate stations
01:27
#8
416.0 km
/==/
Zone: SR
Speed: 57
Elev: 411m
02:27
02:30
Day: 2
100.8 km
15 intermediate stations
01:47
#9
516.8 km
/==/
Zone: SR
Speed: 76
Elev: 171m
04:17
04:20
Day: 2
59.7 km
8 intermediate stations
00:47
#10
576.5 km
/==/
Zone: SR
Speed: 64
Elev: 280m
05:07
05:10
Day: 2
188.9 km
28 intermediate stations
02:57
#11
765.4 km
/==/
Zone: SWR
PF# 3
Speed: 63
Elev: 810m
08:07
08:08
Day: 2
56.4 km
10 intermediate stations
00:54
#12
821.8 km
%≡≡%
Zone: SWR
PF# 4
Speed: 7
Elev: 904m
09:02
09:04
Day: 2
4.5 km
3 intermediate stations
00:41
#13
826.2 km
/==/
Zone: SWR

Elev: 910m
09:45

Day: 2


Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy