Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

RailFans - the future of journalism

Search Trains
Post PNR
Availability Calendar
Search LTT to THVM
Return# 01130
PDF Download

01129/Mumbai LTT - Thivim Special Fare Summer Special
मुम्बई लोकमान्य तिलक टर्मिनस - थिविम विशेष किराया ग्रीष्मकालीन विशेष

LTT/Mumbai LTT --> THVM/Thivim

Updated: Apr 12 (19:56) by GujratMail^~
Apr 12 (19:56)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
The Shortest Route between LTT and THVM is 12 km (2%) shorter.
Travel Time: 11h 35m     18 halts
Distance: 518 km     Avg Speed: 45 km/hr
Max Permissible Speed: n/a
Departs @ 22:15
Mumbai LTT/LTT 
Platform# --
 
 
 
 
 
 
Sat
Arrives @ 09:50 +1 night
THVM/Thivim 
Platform# --
Sun
 
 
 
 
 
 
Type: Mail/Express
Rake Zone: CR/Central
First Departure: Sat Apr 20, 2024fromLTT/Mumbai LTT
Last Arrival: Sun Jun 09, 2024atTHVM/Thivim
Latest News
(You need to double-check/verify this info yourself)
.
Thu Mar 07, 2024 (07:31PM)
News History
🔹Composition: Total 20 Coaches Two Tier AC - 01 Coach, Three Tier AC - 02 Coaches, Sleeper 11 Coaches, General - 04 Coaches, SLR - 02.
Fri Apr 14, 2023 (03:58PM)
Train no 01045 Mumbai LTT - Thivim Special Fare Summer Special earlier notified upto 24.05.2022 is extended for 26.05.2022 28.05.2022 30.05.2022 01.06.2022 03.06.2022
Fri May 20, 2022 (07:27PM)
Train no. 01045 Lokmanya Tilak (T) - Thivim Summer Special earlier notified upto 19/04/2022 is extended for 21/04/2022, 23/04/2022, 25/04/2022, 27/04/2022 & 29/04/2022.
Thu Apr 21, 2022 (05:41PM)
Coach Composition : 1A – 1, 2A – 3, 3A – 4, SL – 6 & Unreserved – 8. Train will Run only on 07.04.22, 09.04.22, 11.04.22, 13.04.22, 15.04.22, 17.04.22 & 19.04.22 Ex - Mumbai LTT.
Wed Apr 06, 2022 (10:26PM)
▣ Coach Composition ▸ 2S—20, EOG—2 ▣
Sun Oct 31, 2021 (02:34PM)
0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
punctuality - n/a (0)
food - n/a (0)
ticket avbl - n/a (0)
u/r coach - n/a (0)
railfanning - n/a (0)
safety - n/a (0)
Bedroll/Linen: NOT Available change
Pantry/Catering
???
ICF Rake

Rake/Coach Position

🔹 Composition : 1A cum 2A - 1, 1A - 1, 2A - 1, 3A - 5, General Second Class - 8, SLRD - 2.
RSA - Rake Sharing
Loco

Show ALL intermediate Stations

18 halts. 67 intermediate Stations between Mumbai LTT and Thivim
#1
0.0 km
/==/
Zone: CR
Speed: 45
Elev: 6m

22:15
Day: 1
16.5 km
8 intermediate stations
00:22
#2
16.5 km
/==/
Zone: CR
PF# 7
Speed: 28
Elev: 7m
22:37
22:40
Day: 1
32.9 km
9 intermediate stations
01:10
#3
49.3 km
/==/
Zone: CR
Speed: 60
Elev: 12m
23:50
23:55
Day: 1
74.8 km
9 intermediate stations
01:15
#4
124.1 km
/==/
Zone: CR
Speed: 87
Elev: 10m
01:10
01:15
Day: 2
30.5 km
2 intermediate stations
00:21
#5
154.6 km
/==/
Zone: KR
Speed: 99
Elev: 11m
01:36
01:38
Day: 2
16.5 km
1 intermediate stations
00:10
#6
171.2 km
/--/
Zone: KR
Speed: 64
Elev: 6m
01:48
01:50
Day: 2
51.4 km
5 intermediate stations
00:48
#7
222.6 km
/--/
Zone: KR
Speed: 81
Elev: 25m
02:38
02:40
Day: 2
29.6 km
1 intermediate stations
00:22
#8
252.2 km
/--/
Zone: KR
Speed: 69
Elev: 11m
03:02
03:04
Day: 2
18.5 km
1 intermediate stations
00:16
#9
270.7 km
/--/
Zone: KR
PF#: 1
Speed: 90
Elev: 102m
03:20
03:22
Day: 2
24.0 km
2 intermediate stations
00:16
#10
294.7 km
/--/
Zone: KR
Speed: 44
Elev: 24m
03:38
03:40
Day: 2
32.9 km
2 intermediate stations
00:45
#11
327.6 km
/--/
Zone: KR
Speed: 63
Elev: 125m
04:25
04:30
Day: 2
31.5 km
1 intermediate stations
00:30
#12
359.0 km
/--/
Zone: KR
Speed: 78
Elev: 64m
05:00
05:02
Day: 2
15.6 km
1 intermediate stations
00:12
#13
374.6 km
/--/
Zone: KR
PF#: 1
Speed: 84
Elev: 64m
05:14
05:16
Day: 2
16.7 km
1 intermediate stations
00:12
#14
391.3 km
/--/
Zone: KR
Speed: 62
Elev: 62m
05:28
05:30
Day: 2
16.6 km
1 intermediate stations
00:16
#15
407.9 km
/--/
Zone: KR
Speed: 78
Elev: 75m
05:46
05:48
Day: 2
31.1 km
2 intermediate stations
00:24
#16
439.0 km
/--/
Zone: KR
Speed: 66
Elev: 47m
06:12
06:14
Day: 2
17.7 km
0 intermediate stations
00:16
#17
456.7 km
/--/
Zone: KR
Speed: 49
Elev: 35m
06:30
06:32
Day: 2
10.6 km
0 intermediate stations
00:13
#18
467.3 km
/--/
Zone: KR
Speed: 45
Elev: 18m
06:45
06:47
Day: 2
Xing with 16346/Netravati Express | Sun
20.8 km
1 intermediate stations
00:28
#19
488.1 km
/--/
Zone: KR
Speed: 12
Elev: 40m
07:15
07:17
Day: 2
29.4 km
2 intermediate stations
02:33
#20
517.5 km
/--/
Zone: KR

Elev: 22m
09:50

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy