Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

For a RailFan, watching MPS skips are far more interesting than watching F1 race - Prince Maan

Search Trains
Post PNR




no description available
Entry# 5954329-0
no description available
Entry# 6282568-0
Availability Calendar
Search KRNT to JP
Return# 19713
PDF Download

09735⇒19714/Kurnool City - Jaipur Express (PT)
कर्नूलु सिटि - जयपुर एक्सप्रेस

KRNT/Kurnool City --> JP/Jaipur Junction

Updated: Aug 21 (13:29) by RF_SCR^
Aug 21 (13:29)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips


Other Trains in the News
The Shortest Route between KRNT and JP is 104 km (5%) shorter.
Travel Time: 38h 30m     33 halts
Distance: 1977 km     Avg Speed: 51 km/hr
Max Permissible Speed: 130 km/hr
Departs @ 16:15
Kurnool City/KRNT 
Platform# --
 
Mon
 
 
 
 
 
Arrives @ 06:45 +2 nights
JP/Jaipur Jn 
Platform# 4
 
 
 
Wed
 
 
 
Type: Mail/Express
Rake Zone: NWR/North Western
Latest News
(You need to double-check/verify this info yourself)
One 3 AC will be replaced by one GS wef 04.11.24
Sun Aug 25, 2024 (07:54AM)
News History
Train is Partially Cancelled from DURGAPURA(DPA) to JAIPUR JN.(JP). Now it will terminate at its new Destination: DURGAPURA(DPA).
Sun Jan 28, 2024 (10:23AM)
From 01st May 2023, 19713 Secunderabad - Jaipur Junction Express will originate from Kacheguda
Thu Apr 20, 2023 (06:39PM)
ICF Rake Ex SC 18/01/2021 ▪️CC:- 1AC+2AC—1, 2AC—2, 3AC—5, SL—11, PC—1, 2S—2, SLR—2▪️ LHB Rake Ex SC 25/01/2021 ▪️CC:- 1AC+2AC—1, 2AC—2, 3AC—6, SL—6, PC—1, 2S—4, EOG—2▪️
Sat Dec 19, 2020 (12:51AM)
3 Follows
Rating: 4.8/5 (48 votes)
cleanliness - excellent (8)
punctuality - excellent (8)
food - excellent (8)
ticket avbl - good (8)
u/r coach - excellent (8)
railfanning - excellent (8)
safety - excellent (8)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Mon May 27, 2013
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
E-Catering Is Available at KRNT, MBNR, KCG, AK, BD, NAVI (New...
more...
Amravati), BZU, ET, RKMP (Bhopal Habibganj), BPL, UJN & JP.
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 GS
  3
 GS
  4
HA1
  5
 A2
  6
 A1
  7
 B6
  8
 B5
  9
 B4
 18
 S2
 17
 S3
 16
 S4
 15
 S5
 14
 PC
 13
 M1
 12
 B1
 11
 B2
 10
 B3
 19
 S1
 20
 GS
 21
 GS
 22
EOG
  AK
RSA - Rake Sharing
RSA pattern 19713 - 19714 - 12976 - 12975. Total 2 Rakes. PM @ JP CDO/NWR




Loco
KRNT -> KCGKCG -> AKAK -> JP
Loco/Rake Reversals
AK/Akola Junction
SWM/Sawai Madhopur Junction
NAD/Nagda Junction
PAU/Purna Junction


Show ALL intermediate Stations

33 halts. 301 intermediate Stations between Kurnool City and Jaipur Junction
#1
0.0 km
%==%
Zone: SCR
Speed: 76
Elev: 294m

16:15
Day: 1
55.4 km
8 intermediate stations
00:44
#2
55.4 km
%==%
Zone: SCR
Speed: 58
Elev: 323m
16:59
17:00
Day: 1
75.2 km
13 intermediate stations
01:18
#3
130.6 km
%==%
Zone: SCR
Speed: 51
Elev: 509m
18:18
18:20
Day: 1
54.1 km
8 intermediate stations
01:04
#4
184.6 km
/==/
Zone: SCR
Speed: 33
Elev: 650m
19:24
19:25
Day: 1
51.8 km
12 intermediate stations
01:35
#5
236.4 km
/==/
Zone: SCR
Speed: 40
Elev: 489m
21:00
21:20
Day: 1
Loco Change from Electric to Diesel
32.8 km
19 intermediate stations
00:49
#6
269.2 km
/--/
Zone: SCR
PF# 2
Speed: 62
Elev: 599m
22:09
22:10
Day: 1
81.1 km
14 intermediate stations
01:19
#7
350.4 km
/--/
Zone: SCR
PF# 1
Speed: 65
23:29
23:30
Day: 1
52.1 km
4 intermediate stations
00:48
#8
402.5 km
/--/
Zone: SCR
PF# 1
Speed: 39
Elev: 383m
00:18
00:20
Day: 2
110.7 km
16 intermediate stations
02:50
#9
513.2 km
/==/
Zone: SCR
PF# 1
Speed: 46
Elev: 362m
03:10
03:15
Day: 2
30.4 km
3 intermediate stations
00:40
#10
543.6 km
/==/
Zone: SCR
PF# 4
Speed: 75
Elev: 382m
03:55
04:15
Day: 2
Rake Reversal (the train reverses direction)
80.5 km
11 intermediate stations
01:04
#11
624.1 km
/--/
Zone: SCR
PF# 1
Speed: 74
Elev: 466m
05:19
05:20
Day: 2
48.0 km
5 intermediate stations
00:39
#12
672.1 km
/--/
Zone: SCR
PF# 1,2
Speed: 40
Elev: 554m
05:59
06:00
Day: 2
Pooled Quota Location
79.1 km
6 intermediate stations
02:00
#13
751.2 km
/--/
Zone: CR
PF# 3
Speed: 80
Elev: 279m
08:00
08:10
Day: 2
Rake Reversal (the train reverses direction)
Loco change from diesel to electric. Remote Location Quota Starting and Charting Station
37.2 km
4 intermediate stations
00:28
#14
788.4 km
/==/
Zone: CR
PF# 2
Speed: 68
Elev: 303m
08:38
08:40
Day: 2
41.8 km
6 intermediate stations
00:37
#15
830.2 km
/==/
Zone: CR
PF# 2
Speed: 25
Elev: 301m
09:17
09:20
Day: 2
6.3 km
3 intermediate stations
00:15
#16
836.5 km
/--/
Zone: CR
PF#: 1
Speed: 43
Elev: 334m
09:35
09:38
Day: 2
36.7 km
4 intermediate stations
00:51
#17
873.2 km
/--/
Zone: CR
PF#: 1
Speed: 64
Elev: 367m
10:29
10:30
Day: 2
30.0 km
3 intermediate stations
00:28
#18
903.2 km
/--/
Zone: CR
PF#: 1
Speed: 58
Elev: 353m
10:58
11:00
Day: 2
124.3 km
14 intermediate stations
02:09
#19
1027.5 km
%≡≡%
Zone: CR
Speed: 82
Elev: 759m
13:09
13:11
Day: 2
23.2 km
1 intermediate stations
00:17
#20
1050.6 km
%≡≡%
Zone: CR
PF# 3,4
Speed: 82
Elev: 733m
13:28
13:30
Day: 2
23.1 km
3 intermediate stations
00:17
#21
1073.8 km
%≡≡%
Zone: CR
PF# 2
Speed: 51
Elev: 639m
13:47
13:49
Day: 2
Xing with 12722/Dakshin SF Express | Tue
107.1 km
15 intermediate stations
02:06
#22
1180.8 km
%≡≡%
Zone: WCR
PF# 3
Speed: 58
Elev: 329m
15:55
16:00
Day: 2
85.6 km
12 intermediate stations
01:28
#23
1266.4 km
/==/
Zone: WCR
PF# 3
Speed: 19
Elev: 496m
17:28
17:30
Day: 2
6.2 km
0 intermediate stations
00:20
#24
1272.7 km
/==/
Zone: WCR
PF# 4
Speed: 49
Elev: 405m
17:50
18:00
Day: 2
Remote Location Quota Starting & Charting Station.
38.6 km
6 intermediate stations
00:47
#25
1311.3 km
/==/
Zone: WR
PF# 1
Speed: 69
Elev: 499m
18:47
18:49
Day: 2
41.7 km
5 intermediate stations
00:36
#26
1352.9 km
/==/
Zone: WR
PF# 1
Speed: 72
Elev: 455m
19:25
19:27
Day: 2
43.1 km
5 intermediate stations
00:36
#27
1396.1 km
/==/
Zone: WR
PF# 2
Speed: 52
Elev: 490m
20:03
20:05
Day: 2
60.1 km
7 intermediate stations
01:10
#28
1456.2 km
/==/
Zone: WR
PF# 3,4
Speed: 35
Elev: 492m
21:15
21:25
Day: 2
Remote Location Quota Starting and Charting Station
55.5 km
8 intermediate stations
01:35
#29
1511.6 km
/==/
Zone: WR
PF# 2
Speed: 78
Elev: 469m
23:00
23:15
Day: 2
Rake Reversal (the train reverses direction)
153.2 km
17 intermediate stations
01:58
#30
1664.8 km
/==/
Zone: WCR
PF# 2
Speed: 67
Elev: 357m
01:13
01:15
Day: 3
72.2 km
11 intermediate stations
01:05
#31
1737.1 km
/==/
Zone: WCR
PF# 1
Speed: 68
Elev: 253m
02:20
02:30
Day: 3
107.9 km
15 intermediate stations
01:35
#32
1845.0 km
/==/
Zone: WCR
PF# 2
Speed: 88
Elev: 266m
04:05
04:20
Day: 3
Rake Reversal (the train reverses direction)
65.8 km
5 intermediate stations
00:45
#33
1910.8 km
/--/
Zone: NWR
PF# 1
Speed: 64
05:05
05:07
Day: 3
58.6 km
4 intermediate stations
00:55
#34
1969.3 km
/--/
Zone: NWR
PF# 2
Speed: 11
Elev: 403m
06:02
06:05
Day: 3
7.4 km
1 intermediate stations
00:40
#35
1976.8 km
/--/
Zone: NWR
PF# 4

Elev: 428m
06:45

Day: 3


Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy