Full Site Search  
Sun Jul 23, 2017 10:29:07 IST
PostPostPost Trn TipPost Trn TipUpload Train PicUpload Train Pic
Refresh Live Status (not updated)

22002/Bhopal Shatabdi Express
     भोपाल शताब्दी एक्सप्रेस

NDLS/New Delhi --> BPL/Bhopal Junction

TRAIN IS CANCELLED
This is the Shortest Route between NDLS and BPL.
Travel Time: 8h 5m     5 halts
Distance: 703 km     Avg Speed: 87 km/hr
Max Permissible Speed: n/a
Departs @ 06:15
New Delhi/NDLS 
Platform# 1
     F 
Arrives @ 14:20
Bhopal Junction/BPL 
Platform# 1
     F 
Type: Shatabdi
Zone: ???/???
Latest News
(You need to double-check/verify this info yourself)
The train has done its last run.22002 doesnt exists now.
Mon May 23, 2011 (12:41PM)
Rating: /5 (0 votes)
cleanliness - n/a (0)
punctuality - n/a (0)
food - n/a (0)
ticket avbl - n/a (0)
railfanning - n/a (0)
safety - n/a (0)
Pantry/Catering
???
ICF Rake

Rake/Coach Position

RSA - Rake Sharing
Loco

Show ALL intermediate Stations

WARNING: Time-Tables are Changing. Pl. double-check through OTHER sources
#1
/==/

0.0 km
NDLS» New Delhi»   Zone: NR
PF# 1   Day: 1   Spd: 95   Elev: 216m

06:15
141.2 km24 intermediate stations01:29
#2
/==/

141.2 km
MTJ Mathura Junction   Zone: NCR
  Day: 1   Spd: 77   Elev: 182m
07:44
07:45
53.9 km8 intermediate stations00:42
#3
/==/

195.2 km
AGC Agra Cantt.   Zone: NCR
  Day: 1   Spd: 106   Elev: 172m
08:27
08:32
79.5 km7 intermediate stations00:45
#4
/==/

274.7 km
MRA Morena   Zone: NCR
  Day: 1   Spd: 70   Elev: 176m
09:17
09:18
38.5 km5 intermediate stations00:33
#5
/==/

313.2 km
GWL Gwalior Junction   Zone: NCR
PF# 1   Day: 1   Spd: 85   Elev: 213m
09:51
09:54
97.5 km10 intermediate stations01:09
#6
/==/

410.8 km
JHS Jhansi Junction   Zone: NCR
  Day: 1   Spd: 93   Elev: 259m
11:03
11:11
291.9 km40 intermediate stations03:09
#7
/==/

702.6 km
BPL• Bhopal Junction•   Zone: WCR
PF# 1   Day: 1     Elev: 498m
14:20
Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.