Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

Ranikhet Express - रेगिस्तान में हरियाली

Search Forum
Post PNR
TRAIN IS CANCELLED
Availability Calendar
Search BPD to SDAH
Return# 31873
PDF Download

53182⇒31882/Lalgola - Sealdah EMU Passenger
लालगोला - सियालदह ईएमयू पैसेंजर

BPD/Bahadurpur --> SDAH/Sealdah

Updated: by JoydeepRoy
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    22 blog entries  next>>
General Travel
34813 views
0

May 29 2017 (23:17)   31882/Lalgola - Sealdah EMU Passenger | KNJ/Krishnanagar City Junction (5 PFs)
FraudsterConman
FraudsterConman   7672 blog posts
Entry# 2299195            Tags  
NDF/Nabadwip Ghat - KNJ/Krishnanagar City Junction
Broad Gauge Completed. wiring going on
5 Stations
Track Length: 12 km
Translate to English
Translate to Hindi
Show AI Response
General Travel
35306 views
0

May 29 2017 (20:53)   31873/Sealdah-Lalgola EMU Passenger | KNJ/Krishnanagar City Junction (5 PFs)
FraudsterConman
FraudsterConman   7672 blog posts
Entry# 2299037            Tags  
Some information in SDAH-RHA-KNJ section of ER:-
1. Y link at Naihati/NH is going on in full pace.
2. An [16 coaches] Empty rake of Humsafar having ER marking is standing idle at Kalyani Station.
3. New Bridge over River Churni at Ranaghat Jn. is under construction. Currently up & dn trains are using the down line bridge only for operations.
4.
...
more...
Doubling of KNJ-STB line. Wonder what will happen to NH 34 as from STB to KNJ the line runs parallel with the highway.
5. Electrical wiring works going on in Nabadwip Ghat - Krisnanagar City Jn. section.

Translate to English
Translate to Hindi
Show AI Response
Info Update
73269 views
2

Mar 17 2017 (07:09)   31873/Sealdah-Lalgola EMU Passenger | LGL/Lalgola (2 PFs)
Anupam Enosh Sarkar^~
Anupam Enosh Sarkar^~   32882 blog posts
Entry# 2200164            Tags   Past Edits
Conversion of following trains to EMUs w.e.f. 17.03.2017 on trial basis.
Translate to English
Translate to Hindi
Show AI Response

47108 views
0

Mar 17 2017 (07:30)
Dj.Railfan1982~
Dj.Railfan1982~   4047 blog posts
Re# 2200164-1              
Why 30 Mins Stop At Krishnanagar ?
Translate to English
Translate to Hindi
Show AI Response

49026 views
0

Mar 17 2017 (07:48)
Brahman^~
Brahman^~   10903 blog posts
Re# 2200164-2              
2 eloco is rote se Chutti ho gaya ab kahi or use honge
Translate to English
Translate to Hindi
Show AI Response

45596 views
0

May 01 2017 (14:55)
Nirmal   13 blog posts
Re# 2200164-3              
People of Lalgola are not getting benefit of double line. Time from Sealdah is same. Conversion of eloco to EMU may be beneficial to rail and good for short distance passenger, but for those who will be travelling from Sealdah to Lalgola sees no benefit. Saved 30 minutes go to stoppage at Krishnanagar.
Translate to English
Translate to Hindi
Show AI Response

45887 views
0

May 01 2017 (15:22)
May_I_have_your_atte~
May_I_have_your_atte~   2841 blog posts
Re# 2200164-4              
Speed in a section depend upon the conditions of the railway tracks not on whether electrification is done or not although electric loco can accelerate much faster and give a better speed but only up to a limit
Translate to English
Translate to Hindi
Show AI Response

45579 views
1

May 01 2017 (15:32)
Nirmal   13 blog posts
Re# 2200164-5              
I am talking about 30 min stoppage at Krishnagar. Had it been just 5 min, the train could reach Lalgola 25 mins earlier. After double line each train in Krishnagar Lalgola section is saving around 30 mins from zero crossing time; but it is not reflecting since 1. Timetable is not revised 2. Some train is running slow 3. Some train has been made EMU with 30 minute stoppage at Krishnagar.
Translate to English
Translate to Hindi
Show AI Response
Info Update
238554 views
0

Mar 24 2017 (06:59)   31873/Sealdah-Lalgola EMU Passenger | REJ/Rejinagar (3 PFs)
Anupam Enosh Sarkar^~
Anupam Enosh Sarkar^~   32882 blog posts
Entry# 2208609            Tags   Past Edits
Traffic block on UP & DN Line between Rejinagar & Beldanga stations.
Translate to English
Translate to Hindi
Show AI Response
Info Update
60123 views
0

Mar 16 2017 (20:17)   63107/Sealdah - Lalgola MEMU
Pran22^~   54713 blog posts
Entry# 2199898            Tags   Past Edits
click here
Translate to English
Translate to Hindi
Show AI Response
Page#    22 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy