Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

For RailFans, Platform Announcements are more musical than Bollywood songs. - Prince Maan

Search Forum
Post PNR
Medium; Outside of Train;
Entry# 3164463-0
Side View; Small TB; Outside of Train; Standing at Station;
Entry# 4038081-4


Availability Calendar
Search MTM to YPR
Return# 17212
PDF Download

17211/Kondaveedu Express (PT)
कोन्डवीडु एक्सप्रेस

MTM/Machilipatnam --> YPR/Yesvantpur Junction

Updated: Oct 07 2023 (12:06) by IndianRailwaysSCoR^~
Oct 07 2023 (12:06)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    619 blog entries  next>>
Rail Fanning
39660 views
15

★★
Mar 16 (17:58)   22231/Kalaburagi - SMVT Bengaluru Vande Bharat Express | YNK/Yelahanka Junction (5 PFs) | LGD/WAP-7/30314
Sameer2905^~
Sameer2905^~   14518 blog posts
Entry# 6000596            Tags   Past Edits
8 compliments
Great Great Great Great Great Great _/\_ Great
Today was a special RFanning session meeting few SWR RFans (Jainam and Harsh_12627) at Yelahanka Jn and got a chance to witness the newly launched KLBG SMVT VB (both saffron-grey and blue-white**) along with few express trains like Kondaveedu Express, Prashanthi Express and few more trains... do have a look....👍👍👍

(** Rake transfer to SWR from Wadi and now being used for KLBG VB as a spare rake since saffron-grey will be used for maintenance at Bengaluru... for reference link 👇👇👇
...
more...
/blog/post/5998058 and post reference from Vamshi RFan)

Translate to English
Translate to Hindi
Show AI Response

More Posts
General Travel
15615 views
2

Dec 27 2023 (15:08)   17211/Kondaveedu Express (PT)
svravibhargav
svravibhargav   491 blog posts
Entry# 5924263            Tags  
Dhone-Malkapuram double line has been commissioned.
Jaggambotla Krishnapuram to Giddalur will also be commissioned in 1st week of January 2024.
This means only around 150 kms of single line in the total of 778 kms.
The train can be made daily and speeded up by at least 90 minutes in both directions.
Translate to English
Translate to Hindi
Show AI Response
1 Followers
Rail Fanning
32301 views
0

Dec 02 2023 (14:06)   17212/Kondaveedu Express (PT) | YPR/Yesvantpur Junction (6 PFs)
Kvenkat
Kvenkat   167 blog posts
Entry# 5899149            Tags   Past Edits
Standing on PF # 2 at YPR
Translate to English
Translate to Hindi
Show AI Response
General Travel
34901 views
2

Nov 14 2023 (15:39)   17211/Kondaveedu Express (PT) | BZA/Vijayawada Junction (10 PFs)
TrainsAreLub
TrainsAreLub   67 blog posts
Entry# 5881563            Tags  
Trip from BZA to YPR during diverted run via RU-KPD on 3-11-2023:

Had to travel BLR, planned on weekend to go to MAS in GT and then VB/Shatabdi to SBC. I'm from Guntur and this is the general route I prefer. I avoid going via Guntakal/DMM.

This
...
more...
time while I was checking tickets on Friday I observed Kondaveedu got diverted as it's showing booking from BZA only and Tatkal tickets are available. I booked the ticket for Kondaveedu from BZA - YPR and reached BZA in GNT-SC intercity on Friday.


17211 Kondaveedu Express arrived BZA around 17:25 and departed around 17:45 ahead of delayed 12511 and BZA- GDR intercity. After crossing KCC I checked whether it got 130 clearance for that run or not, but No. It's traveling at 110 kmph. Then I realised there will be overtakes of 12511 and GDR intercity.

Skipped Tenali And as expected got looped at Appikatla to get overtaken by 12511. Skipped Bapatla, Chirala.By this time GDR intercity trailing us very closely. Someone pulled chain just after crossing Chirala station so 17211 halted for good 10-15 min. Got looped at Vetapalem for GDR intercity overtake. Then I was expecting for OGL skip but we got looped on to PF2 in Ongole. Then I wondered what train is behind us that will be overtaking us. (Pls note On this day hwh-ypr is delayed for good 2hrs). Now I heard Sabari express announcement. Got overtaken in Ongole and later we started after good 30min halt trailing Sabari. Skipped OGL and halted in Gudur for 5-10min. Now the time is around 23:30 and I slept off.


I was expecting similar treatment from all zones so that it will be arriving at YPR around its scheduled time. But when I woke up randomly at 2.30am we were already in Jolarpettai. I got shocked. I heard announcement in JTJ of Kondaveedu 😂 some strange name they pronounced instead of Machilipatnam.



Finally train halted at KJM around 4.45am. At this point HWH YPR is 70km behind Kondaveedu. Lot of people were confused as everyone is expecting to get down at YPR. Finally when most of them realised half of the train easily got down at KJM.
Most of them are still sleeping at that time. Literally we reached BLR nearly 5hrs before time that too just 110kmph and with the overtakes.

I felt this train should be terminating in KJM or some station ahead of KJM.

Please share your thoughts.

Translate to English
Translate to Hindi
Show AI Response

28676 views
1

Nov 14 2023 (15:51)
saikarthik148~
saikarthik148~   3261 blog posts
Re# 5881563-1               Past Edits
on the same day I am in 07153 NS-SMVB I had expected OT of kondaveedu because of schedule arrival time of kondaveedu is 9:45 AM where this NS-SMVB is 9:30 AM at SMVB but after RU NTES didn't shown any update and this NS-SMVB is 2:45 min ahead and by the way KJM don't have any terminating PF only PF 1 is free for stoping trains and stopless trains will pass through PF 2 they are developing BNC with 3 to 5 terminal PF's and some 1 or 2 pitlines too and on that day there is no stop in that whole section BZA-YPR except technical stops at GDR/RU & JTJ due to loco pilot change
Translate to English
Translate to Hindi
Show AI Response

27877 views
0

Nov 14 2023 (19:46)
deepak.yerr~
deepak.yerr~   5880 blog posts
Re# 5881563-2              
I lived I'm Benguluru from 2009 to 2014 and used to travel by bus from Bengaluru to Vja and journey time from Tin factory KJM to Vja is 10 to 11hrs and VJa to KJM 12hrs. In mainline the travel can travel in 11.5 hrs to KJM and 12hrs to Bengaluru central. and dep from VJA should be 1800 to 1900. Now that SMVT is opened to traffic they can introduce a train. Return from SMVT at 2000. I have quoted this many times.

Apart from Vja to SBC one more 4
...
more...
days week train should be run from Vskp.

Translate to English
Translate to Hindi
Show AI Response

26689 views
0

Nov 14 2023 (19:55)
saikarthik148~
saikarthik148~   3261 blog posts
Re# 5881563-3              
Now SWR reply is BNC need to complete
Translate to English
Translate to Hindi
Show AI Response
Info Update
58522 views
6

Nov 11 2023 (08:12)   17211/Kondaveedu Express (PT) | DHNE/Dhone Junction (5 PFs)
SaiCharan^~
SaiCharan^~   3292 blog posts
Entry# 5878230            Tags  
Dhone Malkapuram NI works. Mtm malm mtm not running and has been cancelled long ago but still they have mentioned here. Seems they are very much interested in cancelling trains which are also not running.
Translate to English
Translate to Hindi
Show AI Response

30262 views
1

Nov 11 2023 (10:00)
deepak.yerr~
deepak.yerr~   5880 blog posts
Re# 5878230-1              
SCR is more interested in cancelling then running trains within their zone or originating trains from past 5 months post June 15th.
Translate to English
Translate to Hindi
Show AI Response

31279 views
0

Nov 11 2023 (10:16)
SRG^~
SRG^~   44862 blog posts
Re# 5878230-2              
Keeps repeating..
Translate to English
Translate to Hindi
Show AI Response

29681 views
0

Nov 11 2023 (10:23)
Boxerbhai_432~
Boxerbhai_432~   11949 blog posts
Re# 5878230-3              
Yesterday news article came reaplle-mrkr cancel as restored again
Translate to English
Translate to Hindi
Show AI Response

26592 views
1

Nov 11 2023 (12:16)
SaiCharan^~
SaiCharan^~   3292 blog posts
Re# 5878230-4              
1 compliments
Great
In short on a lighter note scr - South cancellation railway
Translate to English
Translate to Hindi
Show AI Response
Page#    619 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy