Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

TATA Steel Express - Second Sitting sasta bhi, sabse achha bhi - Ravi Raj

Search Trains
Post PNR
Night Pic; Large TB;
Entry# 3792920-0
Medium; Side View; Large TB; EOG/SLR; Outside of Train; Standing at Station;
Entry# 4270106-0


Availability Calendar
Search DDR to MBNL
Return# 12489
PDF Download

12490/Dadar Western - Bikaner SF Express (PT)
рджрд╛рджрд░ рдкрд╢реНрдЪрд┐рдо - рдмреАрдХрд╛рдиреЗрд░ рд╕реБрдкрд░рдлрд╛рд╕реНрдЯ рдПрдХреНрд╕рдкреНрд░реЗрд╕

DDR/Dadar Western --> MBNL/Marwar Bhinmal

Updated: Feb 15 (00:49) by KarnavatiExpress^~
Feb 15 (00:49)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
This is the Shortest Route between DDR and MBNL.
Travel Time: 12h 53m     12 halts
Distance: 748 km     Avg Speed: 58 km/hr
Max Permissible Speed: 110 km/hr between BVI/Borivali and VTA/Vatva
Departs @ 15:00
Dadar Western/DDR 
Platform# 6
Sun
 
 
Wed
 
 
 
Arrives @ 03:53 +1 night
MBNL/Marwar Bhinmal 
Platform# 1
 
Mon
 
 
Thu
 
 
Type: SuperFast
Rake Zone: NWR/North Western
Latest News
(You need to double-check/verify this info yourself)
рдЧрд╛реЬреА рд╕рдВрдЦреНрдпрд╛ 12489/12490, рдмреАрдХрд╛рдиреЗрд░-рджрд╛рджрд░-рдмреАрдХрд╛рдиреЗрд░ рдПрдХреНрд╕рдкреНрд░реЗрд╕ рдореЗрдВ рдмреАрдХрд╛рдиреЗрд░ рд╕реЗ рджрд┐рдирд╛рдВрдХ 04.06.22 рд╕реЗ рдПрд╡рдВ рджрд╛рджрд░ рд╕реЗ рджрд┐рдирд╛рдВрдХ 05.06.22 рд╕реЗ 01рдерд░реНрдб рдПрд╕реА рд╢реНрд░реЗрдгреА рдбрд┐рдмреНрдмреЗ рдХреА рд╕реНрдерд╛рдИ рдмрдврд╝реЛрддрд░реА рдХреА рдЧрдИ рд╣реИред
Tue May 24, 2022 (09:15PM)
News History
ЁЯУв рджрд┐рдирд╛рдВрдХ 03.04.2022 рд╕реЗ 01.05.2022 рддрдХ рджрд╛рджрд░ рд╕реЗ 1 рддреГрддреАрдп рд╡рд╛рддрд╛рдиреБрдХреВрд▓рд┐рдд рд╢реНрд░реЗрдгреА рдХреЗ рдбрд┐рдмреНрдмреЗ рдХреА рдЕрд╕реНрдерд╛рдпреА рд░реВрдк рд╕реЗ рдмреЭреЛрддрд░реА рдХреА рдЬрд╛ рд░рд╣реА рд╣реИредред
Mon Apr 04, 2022 (03:40AM)
ЁЯУв рджрд┐рдирд╛рдВрдХ 02.03.2022 рд╕реЗ 30.03.2022 рддрдХ рджрд╛рджрд░ рд╕реЗ 1 рджреНрд╡рд┐рддреАрдп рд╕рд╛рдзрд╛рд░рдг рд╢реНрд░реЗрдгреА рдХреЗ рдбрд┐рдмреНрдмреЗ рдХреА рдЕрд╕реНрдерд╛рдпреА рд░реВрдк рд╕реЗ рдмреЭреЛрддрд░реА рдХреА рдЬрд╛ рд░рд╣реА рд╣реИредред
Thu Mar 03, 2022 (03:42AM)
ЁЯУв рджрд┐рдирд╛рдВрдХ 02.02.2022 рд╕реЗ 27.02.2022 рддрдХ рджрд╛рджрд░ рд╕реЗ 1 рджреНрд╡рд┐рддреАрдп рд╕рд╛рдзрд╛рд░рдг рд╢реНрд░реЗрдгреА рдХреЗ рдбрд┐рдмреНрдмреЗ рдХреА рдЕрд╕реНрдерд╛рдпреА рд░реВрдк рд╕реЗ рдмреЭреЛрддрд░реА рдХреА рдЬрд╛ рд░рд╣реА рд╣реИредредред
Thu Feb 03, 2022 (03:32AM)
Train No. 12490/12489 Dadar тАУ Bikaner augmented with an additional Second Class Seating coach. Ex Dadar from 5th December 2021 to 29th December 2021 and Ex Bikaner from 4th December 2021 to 28th December, 2021.
Mon Dec 06, 2021 (06:00AM)
тЦкя╕ПCC;- 2ACтАФ1, 3ACтАФ6, SLтАФ7, 2SтАФ4, SLR/DтАФ2тЦкя╕П Train Number 02490/02489 Dadar-Bikaner Special to run with an additional Second Class Seating coach. The train will run from Dadar from 10 October 2021 to 1 December 2021 (on nominated days) and from Bikaner from 9 October 2021 to 30 November 2021.
Mon Oct 11,
...
more...
2021 (08:47AM)
3 Follows
Rating: 3.4/5 (51 votes)
cleanliness - good (9)
punctuality - good (9)
food - average (6)
ticket avbl - average (9)
u/r coach - good (4)
railfanning - good (9)
safety - good (9)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Thu Oct 14, 2010
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
GEN
  3
GEN
  4
 S1
  5
 S2
  6
 S3
  7
 S4
  8
 S5
  9
 M1
 18
 A1
 17
 B7
 16
 B6
 15
 B5
 14
 B4
 13
 B3
 12
 B2
 11
 B1
 10
 M2
 19
 A2
 20
GEN
 21
GEN
 22
EOG
RSA - Rake Sharing
14719 - 14720ЁЯФ╣1 RakeЁЯФ╣PM at BKN with RBPC.


Show ALL intermediate Stations

12 halts. 156 intermediate Stations between Dadar Western and Marwar Bhinmal
#1
0.0 km
/==/
Zone: WR
PF# 6
Speed: 64
Elev: 7m

15:00
Day: 1
23.6 km
13 intermediate stations
00:22
#2
23.6 km
/==/
Zone: WR
PF# 6
Speed: 80
Elev: 18m
15:22
15:25
Day: 1
138.5 km
22 intermediate stations
01:44
#3
162.1 km
/==/
Zone: WR
PF# 1
Speed: 59
Elev: 27m
17:09
17:11
Day: 1
Remote Location Quota Starting and Charting Station
95.0 km
19 intermediate stations
01:36
#4
257.1 km
/==/
Zone: WR
PF# 1
Speed: 59
Elev: 59m
18:47
18:52
Day: 1
Remote Location Quota Starting & Charting Station
129.7 km
25 intermediate stations
02:11
#5
386.8 km
/==/
Zone: WR
PF# 6
Speed: 51
Elev: 36m
21:03
21:08
Day: 1
Remote Location Quota Starting and Charting Station. Loco change From Electric to Diesel
35.5 km
9 intermediate stations
00:42
#6
422.3 km
/==/
Zone: WR
PF# 3
Speed: 75
Elev: 40m
21:50
21:52
Day: 1
Xing with 22928/Lokshakti Express | Sun,Wed
18.8 km
3 intermediate stations
00:15
#7
441.1 km
/==/
Zone: WR
PF# 2
Speed: 67
Elev: 37m
22:07
22:09
Day: 1
45.8 km
11 intermediate stations
00:41
#8
486.8 km
/==/
Zone: WR
PF# 1
Speed: 62
Elev: 52m
22:50
23:00
Day: 1
Remote Location Quota Starting and Charting Station
68.5 km
23 intermediate stations
01:06
#9
555.3 km
/==/
Zone: WR
Speed: 70
Elev: 93m
00:06
00:08
Day: 2
39.8 km
6 intermediate stations
00:34
#10
595.1 km
/--/
Zone: WR
Speed: 34
00:42
00:44
Day: 2
50.9 km
5 intermediate stations
01:31
#11
646.0 km
/--/
Zone: WR
PF# 1
Speed: 82
02:15
02:20
Day: 2
35.4 km
3 intermediate stations
00:26
#12
681.4 km
/--/
Zone: NWR
Speed: 78
Elev: 135m
02:46
02:48
Day: 2
35.0 km
3 intermediate stations
00:27
#13
716.3 km
/--/
Zone: NWR
Speed: 54
03:15
03:18
Day: 2
31.7 km
2 intermediate stations
00:35
#14
748.0 km
%--%
Zone: NWR
PF# 1
Speed: 73
Elev: 153m
03:53
03:56
Day: 2
28.0 km
2 intermediate stations
00:23
#15
776.1 km
/--/
Zone: NWR
PF#: 1
Speed: 77
Elev: 137m
04:19
04:22
Day: 2
34.7 km
3 intermediate stations
00:27
#16
810.8 km
/--/
Zone: NWR
PF# 1
Speed: 82
Elev: 160m
04:49
04:52
Day: 2
32.9 km
2 intermediate stations
00:24
#17
843.7 km
/--/
Zone: NWR
PF# 1
Speed: 75
Elev: 174m
05:16
05:19
Day: 2
26.1 km
2 intermediate stations
00:21
#18
869.8 km
/--/
Zone: NWR
PF# 2
Speed: 46
05:40
05:45
Day: 2
79.7 km
11 intermediate stations
01:45
#19
949.5 km
/==/
Zone: NWR
PF# 2
Speed: 65
Elev: 241m
07:30
07:40
Day: 2
103.0 km
12 intermediate stations
01:35
#20
1052.5 km
/==/
Zone: NWR
Speed: 66
Elev: 322m
09:15
09:20
Day: 2
Experimental Halt for the period of six months w.e.f. 23.04.23
Xing with 12467/Leelan SF Express | Mon,Thu
57.0 km
5 intermediate stations
00:52
#21
1109.5 km
/--/
Zone: NWR
PF# 2
Speed: 59
Elev: 296m
10:12
10:17
Day: 2
115.8 km
9 intermediate stations
01:58
#22
1225.3 km
/--/
Zone: NWR
PF# 3

Elev: 235m
12:15

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy