Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

Tamil Nadu Express - தங்களை அன்புடன் வரவேற்கிறது - Swaroop Kutti

Search Trains
Post PNR
Close-up; Side View; Large TB; EOG/SLR; Outside of Train; Standing;
Credit: pks43 Updated on owner's request.
Entry# 5384257-0
no description available
Entry# 5504388-0


Availability Calendar
Search LKO to SRE
Return# 12326
PDF Download

12325/Gurumukhi SF Express (PT)
गुरुमुखी सुपरफास्ट एक्सप्रेस

LKO/Lucknow Charbagh NR --> SRE/Saharanpur Junction

Updated: Mar 13 (16:26) by TGT.UPSC^~
Mar 13 (16:26)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
This is the Shortest Route between LKO and SRE.
Travel Time: 8h 40m     2 halts
Distance: 518 km     Avg Speed: 60 km/hr
Max Permissible Speed: 130 km/hr
Departs @ 02:40
Lucknow Charbagh NR/LKO 
Platform# 4,5
 
 
 
 
 
Fri
 
Arrives @ 11:20
SRE/Saharanpur Jn 
Platform# 5,6
 
 
 
 
 
Fri
 
Type: SuperFast
Rake Zone: ER/Eastern
Latest News
(You need to double-check/verify this info yourself)
Will run with LHB Rake w.e.f. 13.04.2023. New Coach Composition of LHB Rake: SLR-1, GS-2, SL-6, 3AC Economy-2, 3AC-2, 2AC-1, EOG-1=15 Coaches New Coach Composition w.e.f. 17.08.2023: SLR-1, GS-2, SL-2, 3AC Economy-5, 3AC-3, 2AC-1, EOG-1=15 Coaches
Thu Apr 06, 2023 (09:12PM)
News History
• JCO 02.02.2023 & 09.02.2023 will remain cancelled due to Traffic & Power Block for dismantling of existing ROB no. 213 at Barddhaman over ER.
Tue Jan 31, 2023 (07:07AM)
श्री गुरू गोविन्द सिंह जी महाराज की 356वीं जयंती के अवसर पर पूर्व मध्य रेलवे के पटना साहिब स्टेशन पर 21 दिसम्बर, 2022 से 04 जनवरी, 2023 तक अस्थायी तौर पर 02 मिनट का ठहराव प्रदान किया जाएगा।
Wed Dec 21, 2022 (11:06PM)
JCO 01.12.2022 will be diverted via Naihati, Bandel, Khana with stoppage at Bandel Jn due to Non - Interlocking work at Baruipara, Kamarkundu, and Chandanpur in Howrah - Barddhaman Chord section for commissioning of 4th line between Baruipara and Chandanpur.
Sat Nov 26, 2022 (08:42PM)
As per NTES, train is cancelled till 25.02.22.
Sun Jan 02, 2022 (07:09PM)
श्री गुरू गोविंद सिंह जी महाराज के 355वें प्रकाश पर्व के अवसर पर श्रद्धालुओं की सुविधा के लिए दिनांक 01.01.2022 से 15.01.2022 तक पटना साहिब स्टेशन पर 02 मिनट का अस्थायी ठहराव प्रदान किया जा रहा है। (15:18/15:20)
Tue Dec 28, 2021 (02:55PM)
Cancelled till 24.02.2022 due to foggy weather.
Mon Dec 13, 2021 (05:21PM)
Due to Non Interlocking work in Moradabad Division, 02325 Kolkata - Nangal Dam special (journey commencing on 28.10.2021) will be diverted via Moradabad - Hapur - Meerut City - Saharanpur.
Sun Oct 24, 2021 (08:49AM)
1 Follows
Rating: 4.4/5 (54 votes)
cleanliness - excellent (9)
punctuality - excellent (10)
food - good (7)
ticket avbl - good (10)
u/r coach - excellent (6)
railfanning - excellent (9)
safety - good (9)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Mon Oct 11, 2010
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
GEN
  3
GEN
  4
 S1
  5
 S2
  6
 M1
  7
 M2
  8
 M3
  9
 M4
 16
HCP
 15
EOG
 14
 A1
 13
 B3
 12
 B2
 11
 B1
 10
 M5
RSA - Rake Sharing
13137/13138 Single Rake ; PM @ KOAA


Show ALL intermediate Stations

2 halts. 87 intermediate Stations between Lucknow Charbagh NR and Saharanpur Junction
#1
-1048.3 km
/==/
Zone: ER
PF# 3
Speed: 68
Elev: 6m

07:40
Day: 1
204.7 km
62 intermediate stations
02:52
#2
-843.6 km
/==/
Zone: ER
PF# 4
Speed: 69
Elev: 106m
10:32
10:37
Day: 1
110.6 km
20 intermediate stations
01:36
#3
-733.1 km
/==/
Zone: ER
PF# 2
Speed: 46
Elev: 260m
12:13
12:15
Day: 1
Remote Location Quota Starting and Charting Station
44.0 km
7 intermediate stations
00:57
#4
-689.1 km
/==/
Zone: ECR
PF# 3
Speed: 78
Elev: 138m
13:12
13:17
Day: 1
53.5 km
15 intermediate stations
00:41
#5
-635.6 km
/==/
Zone: ECR
PF# 3
Speed: 62
Elev: 153m
13:58
14:00
Day: 1
123.3 km
42 intermediate stations
02:00
#6
-512.3 km
/==/
Zone: ECR
PF# 4
Speed: 63
Elev: 57m
16:00
16:10
Day: 1
Remote Location Quota Starting and Charting Station
211.4 km
51 intermediate stations
03:20
#7
-300.9 km
/==/
Zone: ECR
PF# 4
Speed: 22
Elev: 79m
19:30
19:40
Day: 1
18.1 km
5 intermediate stations
00:50
#8
-282.8 km
/==/
Zone: NR
PF# 4
Speed: 48
Elev: 77m
20:30
20:40
Day: 1
282.8 km
43 intermediate stations
05:50
#9
0.0 km
%≡≡%
Zone: NR
PF# 4,5
Speed: 66
Elev: 124m
02:30
02:40
Day: 2
234.8 km
35 intermediate stations
03:34
#10
234.8 km
/==/
Zone: NR
PF# 2
Speed: 58
Elev: 169m
06:14
06:16
Day: 2
Remote Location Quota Starting & Charting Station
90.3 km
15 intermediate stations
01:34
#11
325.1 km
/==/
Zone: NR
PF# 3,4
Speed: 57
Elev: 193m
07:50
07:58
Day: 2
193.1 km
35 intermediate stations
03:22
#12
518.2 km
/==/
Zone: NR
PF# 5,6
Speed: 65
Elev: 275m
11:20
11:30
Day: 2
Xing with 12318/Akal Takht Express | Fri
81.0 km
12 intermediate stations
01:15
#13
599.3 km
/==/
Zone: NR
PF# 2
Speed: 66
Elev: 273m
12:45
12:50
Day: 2
101.8 km
15 intermediate stations
01:33
#14
701.1 km
/--/
Zone: NR
PF# 1
Speed: 35
Elev: 282m
14:23
14:25
Day: 2
35.3 km
3 intermediate stations
01:01
#15
736.4 km
/--/
Zone: NR
PF#: 1
Speed: 33
Elev: 285m
15:26
15:28
Day: 2
20.3 km
1 intermediate stations
00:37
#16
756.6 km
/--/
Zone: NR
PF# 1

Elev: 354m
16:05

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy