Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

Sapt Kranti Express: Ruling the tracks with EMD Power - Keshav Singh

Search Trains
Post PNR
Medium; Side View; Small TB; Sleeper; Outside of Train; Standing at Station;
Entry# 4311507-0
Close-up; Night Pic; Side View; Large TB; EOG/SLR; Outside of Train; Standing;
Entry# 5157029-0


Availability Calendar
Search HWH to BBS
Return# 12838
PDF Download

12837/Howrah - Puri Superfast Express (PT)
हावड़ा - पुरी सुपरफास्ट एक्सप्रेस

HWH/Howrah Junction --> BBS/Bhubaneswar

Updated: Nov 20 2023 (20:14) by Snehashish.Arailfan^~
Nov 20 2023 (20:14)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
This is the Shortest Route between HWH and BBS.
Travel Time: 6h 20m     5 halts
Distance: 437 km     Avg Speed: 69 km/hr
Max Permissible Speed: 130 km/hr between ADL/Andul and KUR/Khurda Road Junction
Departs @ 22:40
Howrah Junction/HWH 
Platform# 23
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Arrives @ 05:00 +1 night
BBS/Bhubaneswar 
Platform# 4
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Type: SuperFast
Rake Zone: SER/South Eastern
Latest News
(You need to double-check/verify this info yourself)
JCO 4/10/23 IS CANCELLED
Wed Oct 04, 2023 (07:17PM)
News History
▪️ Departure from Howrah from 11.08.23 - 13.08.23 will be diverted via Naraj Marthapur bypassing Cuttack, with stoppage at Naraj & Kapilas Road.
Fri Aug 11, 2023 (01:15AM)
▪️ Rescheduled to leave Howrah at 00.50 hrs on 06.07.23 instead of 22.40 hrs on 05.07.23
Wed Jul 05, 2023 (06:13PM)
JCO 07-06-23 has been cancelled
Tue Jun 06, 2023 (11:04PM)
JCO 04-06-23 has been rescheduled to leave HWH at 23:40 hrs (instead of 22:40 hrs)
Sun Jun 04, 2023 (07:42PM)
▪️ Cancelled on 03.06.23
Sat Jun 03, 2023 (05:13PM)
JCO 02.06.2023 has been cancelled due to derailment of Coromandel Express.
Fri Jun 02, 2023 (09:40PM)
Running with BE1
Fri Mar 10, 2023 (10:19PM)
..
Sun Dec 04, 2022 (08:18PM)
▪️ Permanent augmentation of 1 Sleeper from 01.07.22. ▪️Only 1 Rake has SE1
Mon Jun 27, 2022 (08:52PM)
Only 1 out of 2 rakes have SE1.
Sun Jun 19, 2022 (06:09PM)
Running with SE1.
Mon May 30, 2022 (07:09PM)
▪️Augmented with 3 3E coaches from 18.04.22
Mon Apr 18, 2022 (07:04PM)
Running with extra coaches - BE1 & SE1. 3E Class Avl WEF 18/04/2022.
Fri Apr 01, 2022 (06:28PM)
Running with extra coaches on need basis - BE1 or SE1. Pl. Check at Stn.
Tue Mar 15, 2022 (07:03PM)
📢⚟ JCO 03.12.2021 and 04.12.2021 cancelled in view of cyclone Jawad
Sat Dec 04, 2021 (09:38AM)
📢⚟ JCO 03.12.2021 cancelled in view of cyclone Jawad
Thu Dec 02, 2021 (09:41AM)
11 Follows
Rating: 3.2/5 (120 votes)
cleanliness - good (22)
punctuality - good (22)
food - poor (15)
ticket avbl - good (21)
u/r coach - average (14)
railfanning - average (19)
safety - good (21)
Bedroll/Linen: AVAILABLE change
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
E-Catering Is Only Available at Howrah.
LHB Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
GEN
  3
GEN
  4
SE1
  5
 S1
  6
 S2
  7
 S3
  8
 S4
  9
 S5
 18
 B4
 17
 B3
 16
 B2
 15
 B1
 14
 M2
 13
 M1
 12
 S8
 11
 S7
 10
 S6
 19
 B5
 20
 A1
 21
 A2
 22
 H1
 23
EOG
2nd rake running with exact opposite CC
RSA - Rake Sharing
No RSA. 2 Dedicated Rakes of SER with PM @ PDPK.

Show ALL intermediate Stations

5 halts. 95 intermediate Stations between Howrah Junction and Bhubaneswar
#1
0.0 km
/==/
Zone: ER
PF# 23
Speed: 74
Elev: 12m

22:40
Day: 1
115.0 km
36 intermediate stations
01:33
#2
115.0 km
/==/
Zone: SER
PF# 4
Speed: 90
Elev: 39m
00:13
00:18
Day: 2
116.1 km
18 intermediate stations
01:17
#3
231.1 km
/==/
Zone: SER
PF# 2
Speed: 65
Elev: 17m
01:35
01:40
Day: 2
62.5 km
9 intermediate stations
00:58
#4
293.5 km
%≡≡%
Zone: ECoR
PF# 2
Speed: 79
Elev: 17m
02:38
02:40
Day: 2
43.6 km
7 intermediate stations
00:33
#5
337.1 km
%≡≡%
Zone: ECoR
PF# 3
Speed: 72
Elev: 32m
03:13
03:15
Day: 2
72.1 km
13 intermediate stations
01:00
#6
409.2 km
/==/
Zone: ECoR
PF# 3
Speed: 42
Elev: 28m
04:15
04:20
Day: 2
27.7 km
7 intermediate stations
00:40
#7
436.9 km
/==/
Zone: ECoR
PF# 4
Speed: 77
Elev: 33m
05:00
05:05
Day: 2
Xing with 18046/East Coast Express | Daily
19.1 km
3 intermediate stations
00:15
#8
456.1 km
/==/
Zone: ECoR
PF# 5
Speed: 29
Elev: 16m
05:20
05:25
Day: 2
11.5 km
2 intermediate stations
00:24
#9
467.6 km
/==/
Zone: ECoR
PF# 1
Speed: 108
Elev: 8m
05:49
05:50
Day: 2
3.6 km
0 intermediate stations
00:02
#10
471.2 km
/==/
Zone: ECoR
PF# 2
Speed: 22
Elev: 9m
05:52
05:53
Day: 2
28.6 km
5 intermediate stations
01:17
#11
499.9 km
/==/
Zone: ECoR
PF# 6

Elev: 5m
07:10

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy