Full Site Search  
Sat Jul 22, 2017 00:24:30 IST
PostPostPost Trn TipPost Trn TipUpload Train PicUpload Train Pic
Details Edit
Large TB;
Entry# 1930742-0
Details Edit
Large TB;
Entry# 2146097-0
Details Edit
Large TB;
Entry# 1656142-0
Details Edit
no description available
Entry# 2312141-0
Refresh Live Status (3h 45m ago)

12187/Jabalpur - Mumbai CST Garib Rath Express
जबलपूर - मुंबई छत्रपति शिवाजी महाराज टर्मिनस गरीब रथ एक्सप्रेस     जबलपुर - मुंबई छत्रपति शिवाजी महाराज टर्मिनस गरीब रथ एक्सप्रेस

JBP/Jabalpur Junction --> CSTM/Mumbai CSM Terminus

Updated: Feb 18 2017 (14:29) by Finally WCR getting first LHB~
Feb 18 2017 (14:29)
This is the Shortest Route between JBP and CSTM.
Travel Time: 16h 45m     13 halts
Distance: 986 km     Avg Speed: 59 km/hr
Max Permissible Speed: 110 km/hr between JBP/Jabalpur Junction and ET/Itarsi Junction
Departs @ 19:30
(Avg 2m late)
Jabalpur Junction/JBP 
Platform# 1
 M W F 
Arrives @ 12:15 +1 night
(Avg 18m late)
Mumbai CSM Terminus/CSTM 
Platform# 17,18
  T T S
Type: Garib Rath
Zone: WCR/West Central
Latest News
(You need to double-check/verify this info yourself)
1] Augmentation of one 3A coach on 12-07-2017. 2]Running with two extra coaches. Coach position is as follow; ...G2-G1-GEX1-GEX2-GD1
Wed Jul 12, 2017 (02:43PM)
Rating: 4.8/5 (24 votes)
cleanliness - good (4)
punctuality - excellent (4)
food - excellent (3)
ticket avbl - excellent (5)
railfanning - excellent (4)
safety - excellent (4)
Inaugural Run
Fri Feb 20, 2009
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
ICF Rake

Rake/Coach Position

  0
  L
  1
GD1
  2
 G1
  3
 G2
  4
 G3
  5
 G4
  6
 G5
  7
 G6
  8
 G7
  9
 G8
 17
GD2
 16
G15
 15
G14
 14
G13
 13
G12
 12
G11
 11
G10
 10
 G9
RSA - Rake Sharing
No RSA.

Show ALL intermediate Stations

Time-Table has Changed. Show Changes
No Speed Change.
#1
%==%

0.0 km
JBP» Jabalpur Junction»   Zone: WCR
PF# 1   Day: 1   Spd: 74   Elev: 417m

19:30 +2
84.1 km9 intermediate stations01:08
#2
%==%

84.1 km
X
NU Narsinghpur   Zone: WCR
PF# 2   Day: 1   Spd: 70   Elev: 364m
20:38 +4
20:40 +8
44.4 km3 intermediate stations00:38
#3
%==%

128.5 km
X
GAR Gadarwara   Zone: WCR
PF# 2   Day: 1   Spd: 69   Elev: 353m
21:18 +5
21:20 +7
49.4 km3 intermediate stations00:43
#4
%==%

177.9 km
XO
PPI Pipariya   Zone: WCR
PF# 2   Day: 1   Spd: 45   Elev: 339m
22:03 +5
22:05 +11
67.3 km6 intermediate stations01:30
#5
/==/

245.2 km
ET Itarsi Junction   Zone: WCR
PF# 5   Day: 1   Spd: 91   Elev: 328m

Loco Changes from Diesel to Electric
23:35 +0
23:45 +23
75.7 km12 intermediate stations00:50
#6
/==/

320.9 km
HD Harda   Zone: WCR
PF# 3   Day: 2   Spd: 57   Elev: 289m
00:35 +32
00:37 +32
107.5 km12 intermediate stations01:53
#7
/==/

428.4 km
XO
KNW Khandwa Junction   Zone: CR
PF# 1   Day: 2   Spd: 78   Elev: 309m
02:30 +8
02:35 +10
123.6 km19 intermediate stations01:35
#8
/==/

552.0 km
X
04:10 +20
04:20 +23
24.1 km2 intermediate stations00:22
#9
/==/

576.1 km
X
JL Jalgaon Junction   Zone: CR
PF# 2   Day: 2   Spd: 85   Elev: 212m
04:42 +26
04:44 +27
160.0 km19 intermediate stations01:53
#10
/==/

736.2 km
MMR Manmad Junction   Zone: CR
PF# 3   Day: 2   Spd: 67   Elev: 582m
06:37 +44
06:40 +45
73.0 km7 intermediate stations01:05
#11
/==/

809.1 km
NK Nasik Road   Zone: CR
PF# 3   Day: 2   Spd: 41   Elev: 564m
07:45 +36
07:50 +38
50.7 km6 intermediate stations01:15
#12
/==/

859.8 km
X
IGP Igatpuri   Zone: CR
PF# 3   Day: 2   Spd: 46   Elev: 589m
Xing with 15017/Kashi Express | Tue,Thu,Sat
09:05 +15
09:10 +21
81.6 km14 intermediate stations01:47
#13
/==/

941.4 km
KYN Kalyan Junction   Zone: CR
PF# 6   Day: 2   Spd: 46   Elev: 10m
10:57 +23
11:00 +21
35.8 km1 intermediate stations00:47
#14

977.2 km
DR Dadar Central   Zone: CR
PF# 5   Day: 2   Spd: 22   Elev: 7m
11:47 +14
11:50 +14
9.0 km8 intermediate stations00:25
#15
/==/

986.3 km
CSTM• Mumbai CSM Terminus•   Zone: CR
PF# 17,18   Day: 2     Elev: 14m
12:15 +18
Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.