Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Bhopal Shatabdi: chalti hai ek dum hawa ke mafik, speed aisi ke ruka de traffic - Varun

Search Trains
Post PNR
Availability Calendar
Search KCVL to BAND
Return# 12777
PDF Download

12778/Kochuveli - SSS Hubballi Weekly SF Express (PT)
कोच्चुवेली - श्री सिद्धारूढ़ा स्वामीजी हुब्बल्लि साप्ताहिक सुपरफ़ास्ट एक्सप्रेस

KCVL/Kochuveli --> BAND/Banaswadi

Updated: Oct 07 2023 (23:10) by Siddharth98^~
Oct 07 2023 (23:10)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
The Shortest Route between KCVL and BAND is 76 km (9%) shorter.
Travel Time: 14h 38m     12 halts
Distance: 815 km     Avg Speed: 56 km/hr
Max Permissible Speed: 110 km/hr
Departs @ 12:50
Kochuveli/KCVL 
Platform# --
 
 
 
 
Thu
 
 
Arrives @ 03:28 +1 night
BAND/Banaswadi 
Platform# --
 
 
 
 
 
Fri
 
Type: SuperFast
Rake Zone: SWR/South Western
Latest News
(You need to double-check/verify this info yourself)
🔹Train no. 12778/Kochuveli - SSS Hubballi Weekly SF Express (PT) JCO 14/09/2023 and 21/09/2023 will be diverted to run via Salem, Omalur, Hosur, Karmelaram, Baiyyappanahalli & Banaswadi skipping stoppages at Bangarapet Jn.
Tue Sep 12, 2023 (10:04AM)
News History
🔹 Train No. 12778 Kochuveli – SSS Hubballi Weekly Superfast Express leaving from Kochuveli o­n May 18, 2023 will be regulated for 25 minutes enroute.
Wed May 17, 2023 (05:54AM)
🔹 Train No.12778 Kochuveli –Huballi Weekly Express leaving Kochuveli at 12.50 hrs o­n 27th April, 2023 will be fully cancelled.
Sat Apr 22, 2023 (05:49AM)
rain No.12778 Kochuveli – Hubballi Superfast Express leaving Kochuveli at 12.50 hrs o­n 23rd March, 2023 will be diverted run via Davangere, Amaravathi Colony, Kotturu, Hosapete bypass, Gadag & Hubballi Skipping stoppages at Harihar, Ranibennur & Haveri
Tue Mar 21, 2023 (08:01PM)
🔹Train is Restored.🔹Train No. 12778 Kochuveli – SSS Hubballi Weekly Superfast Express, leaving from Kochuveli o­n March 16, 2023 will be partially cancelled between Ranibennur – SSS Hubballi and it will be short terminated at Ranibennur.
Wed Mar 15, 2023 (11:58AM)
🔹Train No. 12778 Kochuveli – SSS Hubballi Weekly Superfast Express, leaving from Kochuveli o­n March 16, 2023 will be partially cancelled between Ranibennur – SSS Hubballi and it will be short terminated at Ranibennur.
Fri Mar 10, 2023 (06:32PM)
• JCO 02.03.2023 will be short-terminated at Ranibennur due to engineering works related to doubling of Chikjajur - Hubballi section over SWR.
Thu Mar 02, 2023 (12:39PM)
ØTrain No. 12778 Kochuveli – SSS Hubballi Jn Weekly Superfast Express leaving Kochuveli at 12.50 hrs o­n 02nd February, 2023 will be partially cancelled between Haveri and SSS Hubballi Jn. The train will be not run between Haveri and SSS Hubballi Jn o­n the above mentioned date.
Tue Jan 31, 2023 (07:18PM)
• JCO 26.01.2023 will be regulated for 30 min enroute due to line block for engineering works between Kundgol and Hubballi South Stations over SWR. • JCO 02.02.2023 will be partially cancelled between SMM Haveri and SSS Hubballi & will be short-terminated at SMM Haveri due to engineering works for commissioning...
more...
of Kundgol phase I work as part of doubling of Chikjajur - Hubballi section over SWR.
Thu Jan 26, 2023 (09:10PM)
• JCO 26.01.2023 will be regulated for 30 min enroute due to line block for engineering works between Kundgol and Hubballi South Stations over SWR.
Thu Jan 26, 2023 (08:53PM)
Train No. 12778 Kochuveli - Hubballi Superfast Express leaving Kochuveli Jn at 12.50 hrs o­n 08th December 2022 will be partially cancelled between Kottayam and Kochuveli Jn. The train will commence service from Kottayam at its scheduled departure time of 15.20 hrs o­n the mentioned date.
Sun Dec 04, 2022 (08:54AM)
Train No. 12777/12778 SSS Hubballi – Kochuveli – SSS Hubballi Weekly Superfast Express will be augmented temporarily with o­ne Second Class Sleeper coach with effect from 25.05.2022 to 29.06.2022 from SSS Hubballi and with effect from 26.05.2022 to 30.06.2022 from Kochuveli.
Mon May 23, 2022 (07:16PM)
Coach Composition: ┃2A—1┃—┃3A—2┃—┃SL—7┃—┃2S—5┃—┃SLR/D—2┃ : 17 Coach
Wed Aug 11, 2021 (08:49PM)
1 Follows
Rating: 4.6/5 (12 votes)
cleanliness - excellent (2)
punctuality - excellent (2)
food - excellent (2)
ticket avbl - average (2)
u/r coach - excellent (1)
railfanning - excellent (2)
safety - excellent (2)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Sat Dec 05, 2009
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
ICF Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 UR
  3
 UR
  4
 UR
  5
 S9
  6
 S8
  7
 S7
  8
 S6
  9
 S5
 18
 UR
 17
 A1
 16
 B1
 15
 B2
 14
 B3
 13
 S1
 12
 S2
 11
 S3
 10
 S4
 19
 UR
 20
SLR
Loco
KCVL -> UBL

Show ALL intermediate Stations

12 halts. 143 intermediate Stations between Kochuveli and Banaswadi
#1
0.0 km
/==/
Zone: SR
Speed: 69
Elev: 5m

12:50
Day: 1
57.5 km
14 intermediate stations
00:50
#2
57.5 km
/==/
Zone: SR
PF# 2
Speed: 69
Elev: 11m
13:40
13:43
Day: 1
61.0 km
8 intermediate stations
00:53
#3
118.4 km
/==/
Zone: SR
PF# 3
Speed: 62
Elev: 9m
14:36
14:38
Day: 1
9.3 km
0 intermediate stations
00:09
#4
127.7 km
/==/
Zone: SR
PF# 2
Speed: 53
14:47
14:48
Day: 1
25.8 km
2 intermediate stations
00:29
#5
153.5 km
/==/
Zone: SR
PF# 1
Speed: 38
Elev: 4m
15:17
15:20
Day: 1
Xing with 16649/Parasuram Express | Thu
60.0 km
12 intermediate stations
01:35
#6
213.4 km
/==/
Zone: SR
PF# 1
Speed: 60
Elev: 2m
16:55
17:00
Day: 1
71.5 km
13 intermediate stations
01:11
#7
284.9 km
/==/
Zone: SR
PF# 2
Speed: 57
Elev: 3m
18:11
18:13
Day: 1
75.4 km
14 intermediate stations
01:19
#8
360.3 km
/==/
Zone: SR
PF# 4
Speed: 36
19:32
19:35
Day: 1
Remote Location Quota Starting & Charting Station.
49.8 km
6 intermediate stations
01:23
#9
410.1 km
/==/
Zone: SR
Speed: 69
Elev: 397m
20:58
21:00
Day: 1
43.6 km
4 intermediate stations
00:38
#10
453.7 km
/==/
Zone: SR
PF# 2
Speed: 75
Elev: 306m
21:38
21:40
Day: 1
50.2 km
7 intermediate stations
00:40
#11
503.9 km
/==/
Zone: SR
PF# 1
Speed: 63
Elev: 171m
22:20
22:25
Day: 1
59.7 km
8 intermediate stations
00:57
#12
563.6 km
/==/
Zone: SR
PF# 5
Speed: 68
Elev: 280m
23:22
23:25
Day: 1
188.9 km
28 intermediate stations
02:46
#13
752.5 km
/==/
Zone: SWR
PF# 3
Speed: 49
Elev: 810m
02:11
02:12
Day: 2
62.5 km
15 intermediate stations
01:16
#14
815.1 km
%==%
Zone: SWR
Speed: 41
Elev: 906m
03:28
03:30
Day: 2
18.8 km
4 intermediate stations
00:28
#15
833.9 km
/==/
Zone: SWR
Speed: 63
Elev: 877m
03:58
04:00
Day: 2
55.8 km
10 intermediate stations
00:53
#16
889.6 km
/==/
Zone: SWR
Speed: 46
Elev: 819m
04:53
04:55
Day: 2
96.3 km
14 intermediate stations
02:05
#17
985.9 km
/==/
Zone: SWR
Speed: 72
Elev: 803m
07:00
07:05
Day: 2
45.4 km
4 intermediate stations
00:38
#18
1031.3 km
/==/
Zone: SWR
Speed: 88
Elev: 794m
07:43
07:45
Day: 2
114.7 km
14 intermediate stations
01:18
#19
1146.1 km
/==/
Zone: SWR
Speed: 51
Elev: 584m
09:03
09:05
Day: 2
12.8 km
1 intermediate stations
00:15
#20
1158.9 km
/==/
Zone: SWR
Speed: 70
Elev: 545m
09:20
09:22
Day: 2
23.3 km
2 intermediate stations
00:20
#21
1182.2 km
/==/
Zone: SWR
Speed: 67
Elev: 527m
09:42
09:44
Day: 2
32.5 km
2 intermediate stations
00:29
#22
1214.7 km
/==/
Zone: SWR
Speed: 29
Elev: 553m
10:13
10:15
Day: 2
75.2 km
9 intermediate stations
02:35
#23
1289.9 km
/==/
Zone: SWR

Elev: 627m
12:50

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy