Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

कोशी की जीवन रेखा — मानसी सहरसा रेलखंड - Prabhat Sharan

Search Trains
Post PNR
no description available
Entry# 5716439-0
no description available
Entry# 5793238-0
Availability Calendar
Search MS to BZA
Return# 20896
PDF Download

18495⇒20895/Rameswaram - Bhubaneswar Weekly SF Express (PT)
रामेश्वरम - भुवनेश्वर साप्ताहिक सुपरफास्ट एक्सप्रेस

MS/Chennai Egmore --> BZA/Vijayawada Junction

Updated: Mar 11 (07:57) by sivaprakashofficial^~
Mar 11 (07:57)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
This is the Shortest Route between MS and BZA.
Travel Time: 6h 40m     2 halts
Distance: 436 km     Avg Speed: 65 km/hr
Max Permissible Speed: 130 km/hr
Departs @ 22:10
Chennai Egmore/MS 
Platform# 6
Sun
 
 
 
 
 
 
Arrives @ 04:50 +1 night
BZA/Vijayawada Jn 
Platform# 7
 
Mon
 
 
 
 
 
Type: SuperFast
Rake Zone: ECoR/East Coast
Latest News
(You need to double-check/verify this info yourself)
▪️ Departure from Rameswaram on 20.08.23 & 27.08.23 is cancelled
Sun Aug 13, 2023 (01:34PM)
News History
▪️ Departure from Rameswaram on 11.06.23 will be regulated for 45 mins between Palasa - Brahmapur.
Sat Jun 10, 2023 (01:46PM)
Due to Pamban Bridge Reconstruction, It will Short Originated from Ramanathapuram.
Tue May 09, 2023 (01:55PM)
One temporary third AC coach will be attached on 05.03.2023 to 02.04.2023
Tue Feb 28, 2023 (10:10AM)
·Train No. 20895 Rameswaram - Bhubaneswar Superfast Weekly Express will be temporarily augmented by One AC 3 Tier Coach with effect from 04th December, 2022 to 01st February, 2023 (Sundays)
Sun Dec 04, 2022 (08:45AM)
Permanent augmented with one addition AC 3 tier coach Wef 27/03/22
Mon Mar 21, 2022 (11:42PM)
. Augmented with one sleeper coaches from Rameswaram from 13/02/22
Fri Feb 11, 2022 (09:54AM)
▪️CC:- 2S—2, SL—11, 3AC—4, 2AC—1, PC—1, EOG—2▪️ 📢 For carrying out 5 hrs Traffic cum power Block for LHS work programme between Vizianagaram - Korukunda & Ponduru - Dusi sections of ECoR, train no 08495 will be regulated enroute for 2 hours (i.e 10.50 hrs) on journey commencing on 08.08.2021.
Fri Aug
...
more...
06, 2021 (11:38AM)
2 Follows
Rating: 4.0/5 (24 votes)
cleanliness - average (4)
punctuality - excellent (4)
food - good (4)
ticket avbl - good (4)
u/r coach - average (1)
railfanning - excellent (4)
safety - good (4)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Sun May 23, 2010
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 GS
  3
 S1
  4
 S2
  5
 S3
  6
 S4
  7
 S5
  8
 S6
  9
 PC
 18
 B7
 17
 B6
 16
 B5
 15
 B4
 14
 B3
 13
 B2
 12
 B1
 11
 A2
 10
 A1
 19
 GS
 20
EOG
VSKP
RSA - Rake Sharing
12898/12897; Single LHB Rake; PM @ BBS.


Loco/Rake Reversals
VSKP/Visakhapatnam Junction

Show ALL intermediate Stations

2 halts. 81 intermediate Stations between Chennai Egmore and Vijayawada Junction
#1
-648.2 km
%--%
Zone: SR
PF# 1
Speed: 95
Elev: 4m

09:15
Day: 1
36.4 km
4 intermediate stations
00:23
#2
-611.8 km
/--/
Zone: SR
PF# 1
Speed: 77
Elev: 7m
09:38
09:40
Day: 1
35.7 km
1 intermediate stations
00:28
#3
-576.1 km
/--/
Zone: SR
PF# 2
Speed: 51
Elev: 42m
10:08
10:10
Day: 1
23.9 km
1 intermediate stations
00:28
#4
-552.1 km
/--/
Zone: SR
PF# 1
Speed: 54
Elev: 67m
10:38
10:40
Day: 1
20.7 km
2 intermediate stations
00:23
#5
-531.4 km
/--/
Zone: SR
PF# 1
Speed: 77
Elev: 105m
11:03
11:05
Day: 1
35.7 km
3 intermediate stations
00:28
#6
-495.7 km
/--/
Zone: SR
PF#: 1
Speed: 49
Elev: 77m
11:33
11:34
Day: 1
4.9 km
0 intermediate stations
00:06
#7
-490.7 km
/--/
Zone: SR
PF# 1
Speed: 61
11:40
11:42
Day: 1
36.6 km
4 intermediate stations
00:36
#8
-454.1 km
/--/
Zone: SR
PF# 1
Speed: 35
12:18
12:20
Day: 1
53.0 km
6 intermediate stations
01:30
#9
-401.1 km
/--/
Zone: SR
PF# 4
Speed: 62
Elev: 86m
13:50
14:00
Day: 1
Loco change from Diesel to Electric
49.7 km
8 intermediate stations
00:48
#10
-351.4 km
/==/
Zone: SR
PF# 2
Speed: 79
Elev: 57m
14:48
14:50
Day: 1
39.3 km
8 intermediate stations
00:30
#11
-312.0 km
/--/
Zone: SR
PF# 1
Speed: 35
Elev: 32m
15:20
15:25
Day: 1
31.2 km
6 intermediate stations
00:53
#12
-280.8 km
/--/
Zone: SR
PF# 3,5
Speed: 46
Elev: 13m
16:18
16:20
Day: 1
20.0 km
3 intermediate stations
00:26
#13
-260.8 km
/--/
Zone: SR
PF# 1
Speed: 73
Elev: 6m
16:46
16:47
Day: 1
17.0 km
3 intermediate stations
00:14
#14
-243.8 km
/--/
Zone: SR
Speed: 82
Elev: 5m
17:01
17:03
Day: 1
42.5 km
6 intermediate stations
00:31
#15
-201.2 km
/--/
Zone: SR
PF# 1
Speed: 25
Elev: 5m
17:34
17:36
Day: 1
42.7 km
7 intermediate stations
01:44
#16
-158.5 km
/--/
Zone: SR
PF# 1
Speed: 66
Elev: 43m
19:20
19:25
Day: 1
158.5 km
42 intermediate stations
02:25
#17
0.0 km
%≡≡%
Zone: SR
PF# 6
Speed: 56
Elev: 10m
21:50
22:10
Day: 1
Remote Location Quota Starting and Charting Station
142.0 km
33 intermediate stations
02:33
#18
142.0 km
/==/
Zone: SCR
PF# 2
Speed: 70
Elev: 19m
00:43
00:45
Day: 2
38.4 km
5 intermediate stations
00:33
#19
180.4 km
/==/
Zone: SCR
PF# 2
Speed: 73
Elev: 18m
01:18
01:20
Day: 2
255.2 km
41 intermediate stations
03:30
#20
435.6 km
/==/
Zone: SCR
PF# 7
Speed: 62
Elev: 19m
04:50
05:00
Day: 2
Overtakes 11020/Konark Express | Mon
Xing with 11020/Konark Express | Mon
148.9 km
30 intermediate stations
02:23
#21
584.5 km
/--/
Zone: SCR
Speed: 61
Elev: 14m
07:23
07:25
Day: 2
Experimental basis halt w.e.f 18.03.24 to till further advice.
Xing with 12841/Coromandel Express | Mon
Xing with 18045/East Coast Express | Mon
183.4 km
30 intermediate stations
03:00
#22
768.0 km
/==/
Zone: ECoR
PF# 4
Speed: 37
Elev: 41m
10:25
10:27
Day: 2
17.2 km
4 intermediate stations
00:28
#23
785.2 km
/==/
Zone: ECoR
PF# 2
Speed: 69
Elev: 6m
10:55
11:15
Day: 2
Rake Reversal (the train reverses direction)
Remote Location Quota Starting and Charting Station
Xing with 18464/Prashanti Express | Mon
61.1 km
10 intermediate stations
00:53
#24
846.3 km
/==/
Zone: ECoR
Speed: 73
Elev: 58m
12:08
12:10
Day: 2
216.9 km
27 intermediate stations
02:58
#25
1063.2 km
/==/
Zone: ECoR
PF# 1
Speed: 74
Elev: 20m
15:08
15:10
Day: 2
147.1 km
23 intermediate stations
02:00
#26
1210.3 km
/==/
Zone: ECoR
PF# 4
Speed: 21
Elev: 16m
17:10
17:15
Day: 2
19.1 km
3 intermediate stations
00:55
#27
1229.4 km
/==/
Zone: ECoR
PF# 2

Elev: 33m
18:10

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy