Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

Uttarbanga Exp: āĻ‰āĻ¤ā§āĻ¤āĻ°ā§‡āĻ° āĻ†āĻ¤ā§āĻŽāĻžāĻ° āĻ†āĻ¤ā§āĻŽā§€ā§Ÿ - Avinaba Bose

Search Trains
Post PNR
Availability Calendar
Search CNB to ANVT
Return# 12428
PDF Download

12427/Rewa - Anand Vihar Terminal SF Express (PT)
Other Names: Rewa Express
ā¤°āĨ€ā¤ĩā¤ž - ā¤†ā¤¨ā¤¨āĨā¤Ļ ā¤ĩā¤ŋā¤šā¤žā¤° ā¤Ÿā¤°āĨā¤Žā¤ŋā¤¨ā¤˛ ā¤¸āĨā¤Ēā¤°ā¤Ģā¤žā¤¸āĨā¤Ÿ ā¤ā¤•āĨā¤¸ā¤ĒāĨā¤°āĨ‡ā¤¸

CNB/Kanpur Central --> ANVT/Anand Vihar Terminal

Updated: Apr 14 (20:59) by Siddharth98^~
Apr 14 (20:59)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
This is the Shortest Route between CNB and ANVT.
Travel Time: 6h 43m     2 halts
Distance: 428 km     Avg Speed: 64 km/hr
Max Permissible Speed: 130 km/hr between SFG/Subedarganj (Prayagraj) and CPYZ/Chipyana Buzurg
Departs @ 23:57
Kanpur Central/CNB 
Platform# 3
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Arrives @ 06:40 +1 night
ANVT/Anand Vihar Terminal 
Platform# 1,2
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Type: SuperFast
Rake Zone: NR/Northern
Latest News
(You need to double-check/verify this info yourself)
🔹Train no. 12427 REWA Exp scheduled to leave from REWA at 16;40 Hrs on 20/12/2022 is Re-Scheduled to leave at 21;40 Hrs on 20/12/2022.
Tue Dec 20, 2022 (05:44PM)
News History
JCO 22.08.2021 , HA1 Will get replaced by H1 ex.REWA Running with revised coach composition of 1 HA(First AC + Second AC), 2 AC2 tier, 6 AC3 tier, 7 Sleeper and 4 2S coach
Fri Aug 20, 2021 (01:22PM)
4 Follows
Rating: 3.8/5 (91 votes)
cleanliness - good (16)
punctuality - good (17)
food - good (12)
ticket avbl - good (16)
u/r coach - good (9)
railfanning - good (15)
safety - good (15)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Sat Sep 27, 2003
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
E-Catering is available at STA, MKP, PRYJ & CNB.
LHB Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 GS
  3
 GS
  4
 S1
  5
 S2
  6
 M1
  7
 M2
  8
 M3
  9
 M4
 18
 A3
 17
 A2
 16
 A1
 15
 B6
 14
 B5
 13
 B4
 12
 B3
 11
 B2
 10
 B1
 19
 A4
 20
 H1
 21
 GS
 22
EOG
 STA
RSA - Rake Sharing
Two Dedicated LHB Rakes with PM at ANVT/NR
Loco/Rake Reversals
STA/Satna Junction

Show ALL intermediate Stations

2 halts. 62 intermediate Stations between Kanpur Central and Anand Vihar Terminal
#1
-421.0 km
%==%
Zone: WCR
PF# 1
Speed: 59
Elev: 306m

16:30
Day: 1
49.2 km
5 intermediate stations
00:50
#2
-371.9 km
/==/
Zone: WCR
PF# 1
Speed: 67
Elev: 315m
17:20
17:30
Day: 1
20.1 km
2 intermediate stations
00:18
#3
-351.8 km
/==/
Zone: WCR
PF# 2
Speed: 49
Elev: 302m
17:48
17:50
Day: 1
57.5 km
8 intermediate stations
01:10
#4
-294.3 km
/==/
Zone: NCR
PF# 3
Speed: 68
Elev: 243m
19:00
19:02
Day: 1
22.5 km
1 intermediate stations
00:20
#5
-271.7 km
/==/
Zone: NCR
PF# 2
Speed: 75
Elev: 199m
19:22
19:23
Day: 1
32.5 km
3 intermediate stations
00:26
#6
-239.3 km
/==/
Zone: NCR
PF# 2
Speed: 36
Elev: 132m
19:49
19:50
Day: 1
44.8 km
7 intermediate stations
01:15
#7
-194.5 km
/==/
Zone: NCR
PF# 2
Speed: 88
Elev: 97m
21:05
21:10
Day: 1
Remote Location Quota Starting & Charting Station
56.9 km
8 intermediate stations
00:39
#8
-137.5 km
/==/
Zone: NCR
PF# 2
Speed: 83
Elev: 104m
21:49
21:50
Day: 1
59.8 km
8 intermediate stations
00:43
#9
-77.7 km
/==/
Zone: NCR
PF# 3
Speed: 61
22:33
22:35
Day: 1
77.7 km
11 intermediate stations
01:17
#10
0.0 km
/==/
Zone: NCR
PF# 3
Speed: 75
Elev: 127m
23:52
23:57
Day: 1
Remote Location Quota Starting and Charting Station.
309.4 km
42 intermediate stations
04:06
#11
309.4 km
%≡≡%
Zone: NCR
PF# 4
Speed: 54
Elev: 186m
04:03
04:05
Day: 2
106.0 km
17 intermediate stations
01:58
#12
415.4 km
/==/
Zone: NR
PF# 4,5
Speed: 22
Elev: 217m
06:03
06:05
Day: 2
12.6 km
1 intermediate stations
00:35
#13
428.0 km
/==/
Zone: NR
PF# 1,2

Elev: 207m
06:40

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy