Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Everyone knows if a train is running late, ONLY RailFans know WHY it is late

Search Trains
Post PNR
IMAGINARY Train. NOT an ACTUAL running Train.
(Imaginary Trains are created by RailFans to explore various alternative Train Routes and TTs. Such trains are NOT ACTUALLY RUNNING on the tracks.)
Availability Calendar
Search CSTM to MAS
PDF Download

IMG21116-315324/♥♥Mumbai CST-Chennai Central Duronto♥♥

CSTM/Mumbai CSM Terminus --> MAS/MGR Chennai Central

IMAGINARY Train.
ankit0507~
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
The Shortest Route between CSTM and MAS is 21 km (2%) shorter.
Travel Time: 19h 55m     6 halts
Distance: 1278 km     Avg Speed: 64 km/hr
Max Permissible Speed: n/a
Departs @ 17:25
Mumbai CSM Terminus/CSTM 
Platform# --
 
 
 
Wed
 
 
Sat
Arrives @ 13:20 +1 night
MAS/MGR Chennai Ctrl 
Platform# --
Sun
 
 
 
Thu
 
 
Type: Duronto
Rake Zone: CR/Central
Practical - Can Easily be Introduced by IR
A must needed link. There is no Duronto service. There is only one Superfast train on such an important route including Pune. This will benefit and will reduce rush from Mail/Express & Superfast trains. RSA with Mumbai-Bangalore weekly Duronto(Monday). RSA with IMG21120/??Mumbai CST-Bangalore Duronto??
0 Follows
7
Bedroll/Linen: Don't know change
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 S1
  3
 S2
  4
 S3
  5
 S4
  6
 S5
  7
 S6
  8
 B1
  9
 B2
 18
 A3
 17
 A2
 16
 A1
 15
 H1
 14
 PC
 13
 B6
 12
 B5
 11
 B4
 10
 B3
 19
EOG
RSA - Rake Sharing
21120 Mumbai CST-Bangalore Duronto

Show ALL intermediate Stations

6 halts. 243 intermediate Stations between Mumbai CSM Terminus and MGR Chennai Central
#1
0.0 km
/==/
Zone: CR
Speed: 68
Elev: 14m

17:25
Day: 1
98.0 km
43 intermediate stations
01:32
#2
98.0 km
/==/
Zone: CR
Speed: 60
Elev: 52m
18:57
18:57
Day: 1
Technical Halt Bankers attachment
27.8 km
5 intermediate stations
00:28
#3
125.8 km
/==/
Zone: CR
Speed: 59
Elev: 623m
19:25
19:25
Day: 1
Technical Halt Bankers detachment
63.7 km
17 intermediate stations
01:05
#4
189.5 km
/==/
Zone: CR
Speed: 78
Elev: 560m
20:30
20:35
Day: 1
262.4 km
38 intermediate stations
03:23
#5
451.9 km
/==/
Zone: CR
Speed: 66
Elev: 455m
23:58
00:03
Day: 1
379.2 km
49 intermediate stations
05:47
#6
831.1 km
/==/
Zone: SCR
Speed: 62
Elev: 451m
05:50
05:55
Day: 2
Loco change from Diesel to Electric
310.1 km
42 intermediate stations
04:58
#7
1141.2 km
/==/
Zone: SCR
Speed: 57
Elev: 115m
10:53
10:55
Day: 2
136.8 km
43 intermediate stations
02:25
#8
1277.9 km
/==/
Zone: SR

Elev: 3m
13:20

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy