Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

हमसे सीखे कोई जीने का सलीका। सफर कैसा भी हो, मौज़ उडाये जाते हैं।। - Amir

Search Forum
Filters:
Page#    420665 Blog Entries  <<prev  next>>
General Travel
1186 views
2

Today (21:45)   12741/Vasco-da-Gama - Patna SF Express (PT) | KNW/Khandwa Junction (6 PFs)
LHB_for_18047~
LHB_for_18047~   10701 blog posts
Entry# 6073103            Tags  
Train timings will be revised at Khandwa for journey from 29/05/2024 at VSG end.
New arrival time KNW at 15.27
New departure time at 15.30.

Source click here
...
more...

Kindly update #admin.

Translate to English
Translate to Hindi
General Travel
1365 views
0

Today (21:28)   JP/Jaipur Junction (8 PFs)
vijaymjrp
vijaymjrp   1635 blog posts
Entry# 6073098            Tags  
wdg4g locomotive accelerate from jaipur like walking on water
Translate to English
Translate to Hindi
General Travel
7477 views
3

Today (09:33)   17659/Kakatiya Express | SC/Secunderabad Junction (10 PFs)
abdulrazzak123
abdulrazzak123   100 blog posts
Entry# 6072366            Tags   Past Edits
How would it be Running Kakatiya exp with 2 Rakes with extension till MUGR and re-introduction of MUGR KZJ Passenger it would be a great thing right..?
17659
SC-18:50
KZJ-21:50
DKJ-23:30
BDCR-
...
more...
01:10/1:30
MUGR-3:05
17660
MUGR-10:50
BDCR- 12:00/12:20
DKJ- 02:00
KZJ- 04:00
SC- 07:05

5-SL, 1-3A, 10-UR, 2-SLR
Lay-over rake as MUGR KZJ Passenger

Translate to English
Translate to Hindi

2 Posts

4945 views
0

Today (10:24)
KKRAlwaysDestroyTeamIndia~
KKRAlwaysDestroyTeamIndia~   1525 blog posts
Re# 6072366-3              
Okay. 2 hrs 45 mins in SC-KZJ is very long time given.
Translate to English
Translate to Hindi

4854 views
2

Today (10:35)
deepak.yerr~
deepak.yerr~   6179 blog posts
Re# 6072366-4               Past Edits
1 compliments
Useful
This train is a intercity passemger train between SC and Warangal to cater to local travellers it was extended to Bhradrachalam Road as it remains idle during night to provide connection upto Doranakal after Satavahana exp dep not to crowd Godavari Express and demand for stoppages. As distance exceeded 200km they recently converted to express. As it is the traffic after Dorankal wil be less and extending further upto Manguluru is waste as Night SC Manguluru runs with very less occupancy after Bhradrachalam. In return kakatiya passenger used to reach SC at 930 for office goers but after extention they delayed it by 2hrs.As kakatiya alone is not able to coup with rush of travellers MEMU is also introduced. Hope u all understand the history of this for the last 30 yrs for Warangal
Translate to English
Translate to Hindi

3887 views
0

Today (11:45)
abdulrazzak123
abdulrazzak123   100 blog posts
Re# 6072366-5               Past Edits
till Lockdown the train served till MUGR as a fast passenger and RSA with a passenger service to KZJ after lockdown the train got short terminated and RSA KZJ passenger is cancelled and this single Manuguru SF is full fledged Occupancy with complete over crowding of GS classes .
Translate to English
Translate to Hindi

2895 views
1

Today (13:35)
deepak.yerr~
deepak.yerr~   6179 blog posts
Re# 6072366-6               Past Edits
All express trains have 2 GS and are fully occupied and Manuguru SF is no exception and has good number of sleepers. Is there any need to run another train upto Manuguru? If you feel so proove that SC manuguru express runs with good occupancy upto end.
Translate to English
Translate to Hindi

1177 views
0

Today (21:25)
abdulrazzak123
abdulrazzak123   100 blog posts
Re# 6072366-7              
Cutting down its general coaches will hit it so badly as its just a 330km train and the only shortest Dist covering ONT train in the complete zone which barely takes 6 to 7 hours which is supposed to be an ICE train, even though it is managing with 100% occupancy on an average . After the short termination of Kakatiya this MUGR SF started overcrowding. its not something new request the train which was earlier short terminated need to be sent back, thats it "AS KAKATIYA IS UNDER SUSPENSION" from Aug 16th, its just a small hope that it might go back and provide better connectivity just because of kakatiya short termination MUGR KZJ passenger is not re-introduced
Translate to English
Translate to Hindi
General Travel
1222 views
0

Today (21:18)   JP/Jaipur Junction (8 PFs)
vijaymjrp
vijaymjrp   1635 blog posts
Entry# 6073093            Tags  
electric loco run of phulera rewari passenger arriving at jaipur with wap 5
Translate to English
Translate to Hindi
General Travel
1237 views
0

Today (21:11)   12409/Raigarh - Hazrat Nizamuddin Gondwana Express (PT)
DreamTrip22503^~
DreamTrip22503^~   40349 blog posts
Entry# 6073090            Tags   Past Edits
हैलो दोस्तों..
On return trip to pavilion today
Going to onboard Late Running 12409 Raigarh - Hazrat Nizamuddin Gondwana Express
(From Bhopal Jn to Agra cantt )
Train is expected
...
more...
to arrive भोपाल around 10:10 pm
2hrs 45 minutes delayed running today

Translate to English
Translate to Hindi
Page#    420665 Blog Entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy