Search Forum
Filters:
Jun 05 (18:30) 22663/Chennai Egmore - Jodhpur Weekly SF Express (PT) | MS/Chennai Egmore (11 PFs)
PrakharYadav^~
PrakharYadav^~ 12955 blog postsचैन्नई एग्मोर-जोधपुर-चैन्नई एग्मोर रेलसेवा होगी एलएचबी रैक से संचालित
गाड़ी संख्या 22663/22664, चैन्नई एग्मोर-जोधपुर-चैन्नई एग्मोर रेलसेवा चैन्नई एग्मोर से दिनांक से 08.06.24 से एवं जोधपुर से दिनांक 11.06.24 से एलएचबी कोच से संचालित होगी।
इस...
more...
गाड़ी संख्या 22663/22664, चैन्नई एग्मोर-जोधपुर-चैन्नई एग्मोर रेलसेवा चैन्नई एग्मोर से दिनांक से 08.06.24 से एवं जोधपुर से दिनांक 11.06.24 से एलएचबी कोच से संचालित होगी।
इस...
more...
8 berth are increased per coach so number of berths won't effect in 3AC. 12 3AC × 64 = 768, 11 3AC × 72 792 berths.
Revised composition & ms ju ms 22663 / 22664 weekly will be lhb with compostion 1 second ac, 11 third ac, 6 sleeper, 2 general, one lslrd & eog
3ACE in Slichar TVM, Coimbatore, SC is worst decision I'm place of SL as of IR is providing comfort to travellers that too with fare equal to 3AC. If 3ACE fare is equal to that of Garib rath express then makes some sense.
Jun 05 (09:56) 04006/Bandra Terminus - Delhi Special Fare Garib Rath Special
Exynos9611~
Exynos9611~ 14760 blog postsFinally one special and First Special train passing through Gandhinagar Capital
Suldhal Ghataprabha electrification completed. Both Up and Down lines are energized.
It is noteworthy that with this electrification, the stretch from Belagavi to Kudachi has been fully electrified, constituting a crucial segment of the Miraj Belagavi Londa Line. The only remaining non-electrified portion lies between Kudachi and Miraj. Once electrification is completed on this segment, the entire Pune-Miraj-Belagavi-Londa stretch will be electrified, further facilitating seamless connectivity and efficient transportation services.
...
more...
It is noteworthy that with this electrification, the stretch from Belagavi to Kudachi has been fully electrified, constituting a crucial segment of the Miraj Belagavi Londa Line. The only remaining non-electrified portion lies between Kudachi and Miraj. Once electrification is completed on this segment, the entire Pune-Miraj-Belagavi-Londa stretch will be electrified, further facilitating seamless connectivity and efficient transportation services.
...
more...
1 Posts
By when Miraj-Kudachi Electrification Expected to be completed ?
Travelling on this route from Mumbai towards Alnawar by Dadar Hubballi express on 13th April. I doubt it will be given piggy back.
Introduction of 25 KV AC Electric Traction will commence on 15 June 2024 for the Kudachi-Miraj section of the Indian Railway.
SCR is ready for a Massive LHB-fication of Trains.
From Apr-24, it is receiving a good number of LHB coaches including Sleeper, General and AC coaches from ICF, RCF & MCF.
From Apr-24, it is receiving a good number of LHB coaches including Sleeper, General and AC coaches from ICF, RCF & MCF.