Search Forum
Filters:
Yesterday (23:53) 18006/Samaleswari Express | SBP/Sambalpur Junction (4 PFs) | SRC/WAP-7/37070
AdityaSharma077~
AdityaSharma077~ 597 blog postsIn PeaceFull Evening 18006 Jagdalpur Howrah Samaleswari Express Makes Entry At Sambalpur Jn with Inlead 37070 SRC WAP-7
Yesterday (23:18) 13433/SMVT Bengaluru - Malda Town Amrit Bharat Express | BPL/Bhopal Junction (6 PFs)
Saurashtra
Saurashtra 9 blog postsMar 29 (19:43) 22232/SMVT Bengaluru - Kalaburagi Vande Bharat Express | GTL/Guntakal Junction (7 PFs)
TanmayRishith
TanmayRishith 11 blog postsRecently launched 22232 SMVB-KLBG Vande Bharat waiting at platform 1 of GTL, which arrived 10 minutes before its scheduled time (19:00-19:05). Seems like no one deboarded the train, while 3-4 people boarded it.
2 Posts
1. ATP GTL train(ATP-18:30 hrs start) &
2. GTL SC overnight train &
3. GTL BZA overnight & morning train -- These three trains are Very urgently require trains are:
Below...
more...
2. GTL SC overnight train &
3. GTL BZA overnight & morning train -- These three trains are Very urgently require trains are:
Below...
more...
Oh, I see. These trains woud be very much helpful, but including the long distance trains that pass through GTL, it would increase the traffic by a lot too.. But most of them are actually required.
That many long distance trains no need dude...If they introduced these trains.
Then how will those long distance trains be routed away from GTL? Rajdhani, Duronto, GR, KK, KSK, all Mumbai-Chennai trains, and so many more from the north side. MYS-JP, TPTY-JAT, ADI-MAS, SBC-BBS, LTT-CBE, HAS-SUR, MYS-UBL, etc..
With halt or without halt...Dude...If halt also no problem. Because there are 7 platforms...nearly 400trains can handle - Dude.
Bro - these things will not happen.
Bro - these things will not happen.
42 Posts
No in future Saurashtra Janta Kutch SF jesi train bypass karegi, goods ke lie bypass already ban chuka he
Barejadi ko develop ki jayega as a can't station
Rajkot to ahmedabad 2h 15...
more...
Barejadi ko develop ki jayega as a can't station
Rajkot to ahmedabad 2h 15...
more...
Asarva - Himmatnagar Electrification complete. Please update the map.
#electrification #atlas #monitor
#electrification #atlas #monitor
рдкреБрд░рд╛рдиреА рджрд┐рд▓реНрд▓реА-рдмрд╛рдВрджреНрд░рд╛ рдЯрд░реНрдорд┐рдирд▓-рдкреБрд░рд╛рдиреА рджрд┐рд▓реНрд▓реА рдЯреНрд░реЗрди рдХрд╛ 4 рдЯреНрд░рд┐рдк рдХреЗ рд▓рд┐рдП рд╕рдВрдЪрд╛рд▓рди ред рдпрд╣ рддреЛ рдкрд╣рд▓реА рдЯреНрд░рд┐рдк рдореЗрдВ рд╣реА рдмрд┐рд▓реНрдХреБрд▓ рдлреБрд▓ рд╣реЛ рдЧрдИ