Condition of washing apron line / Platform 3 at Islampur (IPR).
To cover it up, DNR division parks all the trains on this PF for almost 20 hours on this line.
I feel...
more...
To cover it up, DNR division parks all the trains on this PF for almost 20 hours on this line.
I feel...
more...
Trip Started: Mon May 20 by Sameer2905^~
0 | updating ... |
Another small vacation to my Southern hometown on-board this demanding train... the Double Decker Express train 👍👍
199 Posts
@MAS: MGR Chennai Ctrl 18km/h 20m late
@MAS: MGR Chennai Ctrl &9 km/h Overall very comfortable journey and ontime arrival.... thanks for joining and I'll CYA later in IRI 👍👍🙏🙏👋👋
@MAS: MGR Chennai Ctrl &9 km/h Overall very comfortable journey and ontime arrival.... thanks for joining and I'll CYA later in IRI 👍👍🙏🙏👋👋
Mostly yes... and I spotted that rake standing on PF#1... and after 5mins of arrival of DD, this VB departed towards the shed.... 👍👍
Yesterday (21:51) JJKR/Jajpur Keonjhar Road (5 PFs)
RAJKISHOREBARIK^~
RAJKISHOREBARIK^~ 6305 blog postsMore Posts
విజయవాడ రైల్వే డివిజన్ మరింత విస్తరించనుంది. రానున్న రోజుల్లో గోల్డెన్ క్వాడ్రలైన్ కాబోతోంది. విజయవాడ డివిజన్లో అతిముఖ్యమైన విజయవాడ-గూడూరు, విజయవాడ-దువ్వాడ సెక్షన్ల మధ్య నాలుగు లైన్ల (క్వాడ్రలైన్) ట్రాక్ను అభివృద్ధి చేయాలని రైల్వే నిర్ణయించింది. యుద్ధప్రాతిపదికన...
read more... నాలుగు లైన్లుగా..
విజయవాడ రైల్వే డివిజన్ మరింత విస్తరించనుంది. రానున్న రోజుల్లో గోల్డెన్ క్వాడ్రలైన్ కాబోతోంది. విజయవాడ డివిజన్లో అతిముఖ్యమైన విజయవాడ-గూడూరు, విజయవాడ-దువ్వాడ సెక్షన్ల మధ్య నాలుగు లైన్ల (క్వాడ్రలైన్) ట్రాక్ను అభివృద్ధి చేయాలని రైల్వే నిర్ణయించింది. యుద్ధప్రాతిపదికన రైల్వే ఫైనల్ లొకేషన్ సర్వే (ఎఫ్ఎల్ఎస్)ను చేపట్టింది.
...
more...
...
more...
Since 4 new ports are being constructed, Railways should consider constructing the new railway line.
1.machilipatnam -repalle-bapatla
2.Ongole-kanigiri-giddaluru(something like)
3. Rajahmundry to Raipur (which was proposed in the 2010 budget, if I'm not wrong)...
more...
1.machilipatnam -repalle-bapatla
2.Ongole-kanigiri-giddaluru(something like)
3. Rajahmundry to Raipur (which was proposed in the 2010 budget, if I'm not wrong)...
more...
Nadikudi - Srikalahasti line ippativaraku aithe Darsi varaku complete ayyindhi.
Inka cheyyalsindhi chaala undhi work.
Inka cheyyalsindhi chaala undhi work.
1.They should first connect ongole with Darsi so that Ongole Secunderabad distance reduces by 80km bypassing Guntur then Ongole Giddalur. They should lay new lines strategically that they reduce distances to metro cities. Ongole Hyd distance is 330km by road and are being covered in 5.5-6 hrs by buses coming from Chennai.
2. They should construct VJA Bypass from Diggirala to Gudivada line and further to Veeravalli in Duvvada section and should be double line.
2. They should construct VJA Bypass from Diggirala to Gudivada line and further to Veeravalli in Duvvada section and should be double line.
Yes , In andhra pradesh most of the railway projects are delayed due to various reasons. I think this project will complete as expected since project funding by central, here state government only responsible for acquire the land.