Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Bhopal Shatabdi: chalti hai ek dum hawa ke mafik, speed aisi ke ruka de traffic - Varun

Search Forum
<<prev entry    next entry>>
Blog Entry# 1012466
Posted: Mar 03 2014 (12:09)

No Responses Yet
Info Update
1278 views
1

Mar 03 2014 (12:09)  
 
AmiR~
AmiR~   514 blog posts
Entry# 1012466              
. . . Rs 38,000 crore rail bonanza for Mumbai's commuters . . .
→ For those not blessed with fat salaries, living in Mumbai increasingly means living on the periphery of the city. One of the world’s 10 most costliest cities to live in, residents of the city desperately need better transportaion systems and connectivity to travel from far flung places into town.
→ Always a little late to wake up, the Mumbai Rail Vikas Corporation (MRVC) has however, finally come up with a cracker of a proposal to develop rail connectivity
...
more...
between the city’s far flung areas such as Panvel, Kalwa, Vasai and Karjat by constructing new rail lines.
→ The first of these projects would be the elevated Airoli-Kalwa line that will enhance connectivity between those staying in Kalyan and Panvel in Navi Mumbai. This R336 crore project comes under the Mumbai Urban Transport Project (MUTP) phase-3 that will develop new routes to strengthen the existing rail corridor.
- An elevated line
“The Airoli-Kalwa line is slated to be eight km-long and would be a completely elevated line,” said a senior railway official. This will be in addition to the existing Trans-Harbour Thane-Vashi link. Other new plans in the pipeline include extending the Panvel-Karjat route and construction of a new line connecting Virar-Vasai-Panvel.
“All the new corridors will boost rail connectivity across the Central, Harbour and Western lines. We will have to plan from now, as it will take time to get the go ahead from different agencies,” said an official from MRVC. The corporation is doubling lines, (addition of two more tracks on a route) on the Borivali-Virar, Virar-Dahanu, Kalyan-Kasara and Kalyan-Karjat lines. The projects will be carried out in a phased manner
# New rail lines to be constructed in the far suburbs
# Total rail lines to be augmented to the tune of Rs 37,977 crore
# First phase work pegged at Rs 5403 crore
- Rs 5,403 cr amount budgeted for the first phase
- Rs 5,573 cr allotted for the Virar- Vasai-Panvel corridor
- Rs 5,424 cr extension of Harbour Line from Goregaon to Borivali
- Rs 4,644 cr for new tracks between Kalyan and Kasara

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy