Search Forum
Blog Entry# 1044030
Posted: Apr 02 2014 (17:49)
12 Responses
Last Response: Apr 09 2014 (18:43)
12 Responses
Last Response: Apr 09 2014 (18:43)
The gentalmen , when will the Katra train services start? What are the likely trains which will be extended. The please tell...
7 Posts
Then we should hail the railway authorities who withstood possible pressure from the political log and put passenger safety in the front.
Ya..the reason is 94m tall bridge over Chenab river....is having bearing problem
Take is as exceptional case.
Recently i traveled on newly opened section where everything was out of gear and train were introduced defying all norms.
Recently i traveled on newly opened section where everything was out of gear and train were introduced defying all norms.