Search Forum
Blog Entry# 1048992
Posted: Apr 07 2014 (15:31)
10 Responses
Last Response: Apr 15 2014 (22:36)
10 Responses
Last Response: Apr 15 2014 (22:36)
Pandharpur station now advanced. All LED aspect signals are placed. Now no shunting without signal permission. Automatic points changing. Two new siding work under process. Station master cabin changed.
2 Public Posts - Mon Apr 07, 2014
These siding is located on towards Kurduwadi and Miraj. Goods shed roofing is done. No lots of express train on PVR no need of coach number system first increase train then coach number system.
3 Public Posts - Mon Apr 07, 2014
3 Public Posts - Tue Apr 08, 2014
1 Public Posts - Tue Apr 15, 2014