Search Forum
Blog Entry# 1118319
Posted: May 31 2014 (14:19)
17 Responses
Last Response: Jun 07 2014 (16:11)
17 Responses
Last Response: Jun 07 2014 (16:11)
May 31 2014 (14:19) 12327/Upasana Express (PT) | NHH/Nihalgarh (2 PFs)
STANDALONE~
STANDALONE~ 3076 blog poststhat much space is enough for a railfan after a thriling performance in AF-LKO section my 14864 marudhar led by a old GZB p4 was brought to ground on the single line section of lko-bsb we where standing from 25 mins at nihalgarh jst for upasana to arrive
12 Posts
well its a single line section so one stop should not ba much issue
Single or Double Line... this stoppage menace on SF Trains just gets bigger with ek aur, ek aur, bas ek aur........... you can see the condition of Himgiri Exp, Kalka Mail and many other ER SFs :-(
After all every train is for passenger service if petronage is good then a halt can be added but yes that should be done till the prestage of train is not hampered
Many Rail Fans including Mani Vijay Sir felt that addition of PNME already damaged the reputation of Durgiana Express... lobbyists will never remain a good SF Train run in one piece that too in peace on the Bengal - Bihar - UP Indo Gangetic Plain Region :-p