Jun 01 2014 (13:10) 13050/Amritsar - Howrah Express (PT) | SLN/Sultanpur Junction (4 PFs)
Arifwap
Arifwap 17601 blog posts2hr late Amirtsar howrah express with LDH WDM3a going towrds BSB
3 Posts
I can see in Pic-5 that the track which looks new is broken... By the way is the Track Doubling between Sultanpur and Lucknow complete ? The rest of the route from Howrah to Amritsar for trains like Akal Takht and Durgiana Exps is doubled and electrified too :-D
not at all complete :(
From SKN to SLN doubling is in progress and from BDKN to CDRL tracks are being doubled in parts so this will take time in doubling and providing electricity :)
From SKN to SLN doubling is in progress and from BDKN to CDRL tracks are being doubled in parts so this will take time in doubling and providing electricity :)
Harsh... is this a possible reason of delay for the track doubling of this route ?
.
PS: What about track doubling on Varanasi - Rae Bareli - Lucknow Route ? :-)
.
PS: What about track doubling on Varanasi - Rae Bareli - Lucknow Route ? :-)
Smoking alco...
But y this is still running with alco on a epectrified route?
But y this is still running with alco on a epectrified route?
Since it needs to cover the Unelectrified Stretch of Chandausi Jn - Moradabad bypassing the electrified Bareilly Jn electrified track :-(