Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Ammi Jaan kahti thi Railfanning se bada koi dharm nhi hota or koi Railfan chhota nhi hota - Shanzil Kabir

Search Forum
<<prev entry    next entry>>
Blog Entry# 1155086
Posted: Jul 04 2014 (20:49)

8 Responses
Last Response: Jul 05 2014 (08:31)
Rail Fanning
6871 views
16

★★
Jul 04 2014 (20:49)   06593/Yesvantpur - Chikkaballapur MEMU Express Special | YNK/Yelahanka Junction (5 PFs)
 
Harris Kiran~
Harris Kiran~   5578 blog posts
Entry# 1155086            Tags  
TRACK BALLASTING : Indian Railways STYLE
click here
.
Catch the Exclusive Video of the newly laid Track being Ballasted .
These new tracks are yet to undergo trial runs hence a Special Truck
...
more...
carrying the Ballast with customized Wheels to work on the Rail Roads help lay the Ballast.
.
Also catch the exclusive footage from where the Ballast is obtained.
The huge boulders are broken down with the help of special machinery from the hills and are carried in small trucks and thrown down to the ground. From there the large stones are further broken down into smaller pieces and are transported by trucks to a near by Rail Road. There on the ballast is transported through a Freight wagon to the desired Railway lines if already a Rail Connectivity Exists else the trucks will bring them to the required spot.
.
There is a special Freight Wagon known as BOBYN , a Open hopper car with side-bottom discharge, for carrying stone, track ballast, etc. These are air-braked and are operational only on tracks that are commissioned by the Rail Safety team.
.
Location : Yelahanka, South Western Railways.
Project : Yelahanka - Channasandra Doubling ( Presently Single line Operation)

Translate to English
Translate to Hindi

6 Public Posts - Fri Jul 04, 2014

2456 views
1

Jul 04 2014 (21:52)
Harris Kiran~   5578 blog posts
Re# 1155086-7              
No idea dude, so far not seen in SWR at least. Ballasting always done by trucks before commissioning.
Translate to English
Translate to Hindi

1 Public Posts - Sat Jul 05, 2014
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy