Search Forum
Blog Entry# 1173156
Posted: Jul 29 2014 (07:23)
7 Responses
Last Response: Jul 29 2014 (13:52)
7 Responses
Last Response: Jul 29 2014 (13:52)
Commentary/Human Interest
Rang De Basanti^ 138872 news posts
New Delhi: After conducting successful trials between the New Delhi-Agra segment, the Indian Railways is now eying to utilize the existing infrastructure to run semi-high-speed trains...
6 Public Posts - Tue Jul 29, 2014
Bharathapuzha cant be increased until the bridge is strengthened.. TVC-Qln can be upgraded to 100kmph for sure if the track strengthening is done properly. Infact some parts were 100+ enabled also. Stoppages are for sure going to go off in september.