Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Howrah Rajdhani - At 50, the Handsome King 👑 is still ruling the tracks superbly. - Somanko

Search Forum
<<prev entry    next entry>>
Blog Entry# 1205258
Posted: Sep 03 2014 (09:48)

7 Responses
Last Response: Sep 03 2014 (12:58)
General Travel
2479 views
0

Sep 03 2014 (09:48)   11447/Shaktipunj Express (PT)
 
bishnujaiswal~   3501 blog posts
Entry# 1205258            Tags  
Entry# 1178126.
How this can be stamped as " Confirmed" DOJ is in Oct
Translate to English
Translate to Hindi

2 Posts

1751 views
0

Sep 03 2014 (09:57)
Rakesh   73 blog posts
Re# 1205258-3              
the moment the ticket is confirmed,it can be stamped as confirmed.and it is the particular process.
Translate to English
Translate to Hindi

1639 views
0

Sep 03 2014 (10:01)
bishnujaiswal~   3501 blog posts
Re# 1205258-4              
and the moment it is cancelled by the ticket holder, what is the process?
Translate to English
Translate to Hindi

1494 views
0

Sep 03 2014 (10:10)
DJRF2012^~
DJRF2012^~   21365 blog posts
Re# 1205258-5              
If the ticket was firstly confirm and later cancelled then no need to change the stamp
Translate to English
Translate to Hindi

1513 views
0

Sep 03 2014 (10:12)
railanweshi~
railanweshi~   2616 blog posts
Re# 1205258-6              
stamping indicates final status of the ticket.. the moment its status becomes final (for example, a waitlisted or RAC ticket becomes confirmed), it can be stamped. If a ticket doesnt confirm before charting, then its status after charting becomes final status. It has nothing to do with travel date because the stamping is for the ticket reservation status, not the journey completion.
Translate to English
Translate to Hindi

1408 views
0

Sep 03 2014 (12:58)
bishnujaiswal~   3501 blog posts
Re# 1205258-7              
Ok. I was under impression that final means "final status" after chart preparation.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy