Search Forum
Blog Entry# 1206345
Posted: Sep 04 2014 (11:51)
5 Responses
Last Response: Sep 04 2014 (15:28)
5 Responses
Last Response: Sep 04 2014 (15:28)
Sep 04 2014 (11:51) NKG/Narkeldanga Coaching Yard
IndianTrainFanonTwitter~
IndianTrainFanonTwitter~ 10340 blog postsFlickr Snap by Mr. Mitra Chowdhury of Narkeldanga (Seadah) Trip Shed :-)
.
Original Image Source Link: click here
.
Original Image Source Link: click here
4 Public Posts - Thu Sep 04, 2014
Yes, its true.... The trains from KOAA runs very slow till crossing Dum Dum Jn at least.
Just after departing from KOAA... the trains go through a huge curve so runs very slow. After that in Dum Dum it has to change many tracks (disturbing many local trains)...
Just after departing from KOAA... the trains go through a huge curve so runs very slow. After that in Dum Dum it has to change many tracks (disturbing many local trains)...