Search Forum
Blog Entry# 1213299
Posted: Sep 12 2014 (18:39)
28 Responses
Last Response: Sep 14 2014 (11:27)
28 Responses
Last Response: Sep 14 2014 (11:27)
#Proposal #DoubleDecker
Transfer the Rake Of Karmali-Mumbai Double Decker to NR...and Let they Run A DD b/w Amritsar and Katra..
It will be Super HIT for sure...will be connecting two HOLY PLACES......
My Proposed TT for the DD is
ASR-SVDK...
more...
Transfer the Rake Of Karmali-Mumbai Double Decker to NR...and Let they Run A DD b/w Amritsar and Katra..
It will be Super HIT for sure...will be connecting two HOLY PLACES......
My Proposed TT for the DD is
ASR-SVDK...
more...
23 Posts
my TT without loco reversal ------
ASR 06.50 64;80 JUC 08.05/10 64;192 PTKC 09.50/55 60;297 JAT 11.40/50 60;
352 UHP 12.45/50 50;377 SVDK 13.20|SVDK 15.00;ASR 21.30|
377 kms| 6 hrs 30 mins|58 kph|DD|NR|Div:- FZR|
no...
more...
ASR 06.50 64;80 JUC 08.05/10 64;192 PTKC 09.50/55 60;297 JAT 11.40/50 60;
352 UHP 12.45/50 50;377 SVDK 13.20|SVDK 15.00;ASR 21.30|
377 kms| 6 hrs 30 mins|58 kph|DD|NR|Div:- FZR|
no...
more...
aap Wala Route Lamba Hai.....
Fir toh pka Flop jyegi. :(
Jab asr se ptk ke liye sidhi Line hai toh why to take long route...wastage of fuel + Time ...
Fir toh pka Flop jyegi. :(
Jab asr se ptk ke liye sidhi Line hai toh why to take long route...wastage of fuel + Time ...
reversal T ptk & following your route ASR 2 SVDK is (107+102+80)=289 kms & time taking is 6 h 50 mins --- whereas my route is bit long by 88 kms but time taking is 20 mins faster than yours -- my one is ASR-SVDK DD SF whereas yours is DD SS(super slow) for my route ASR-JAT TKD WAP7, JAT-SVDK TKD WDP4B.
diesel fuel loss in minimum
diesel fuel loss in minimum
Yaar Tumara Route Flop hai wahan koi aise travel nhi karega.. -_-
Vaise b Railways aisa karne wale nhi jab unhone ne spl lone banayi hai Ptk ke liye toh why they will run on juc route..
Vaise b Railways aisa karne wale nhi jab unhone ne spl lone banayi hai Ptk ke liye toh why they will run on juc route..
ASR-PTK line --- first of all -- is a slow speed line, 2ndly requires reversal at PTK.
DD trains run only in speedy tracks (xcept HBJ-INDB). ASR-SVDK 289 kms as per your route is taking 6 h 50 mins by trains.-- People will take buses 2 travell as Bus journey will cover the distance in 5-6 hrs
DD trains run only in speedy tracks (xcept HBJ-INDB). ASR-SVDK 289 kms as per your route is taking 6 h 50 mins by trains.-- People will take buses 2 travell as Bus journey will cover the distance in 5-6 hrs