Search Forum
Blog Entry# 1238638
Posted: Oct 07 2014 (23:32)
17 Responses
Last Response: Oct 15 2014 (01:21)
17 Responses
Last Response: Oct 15 2014 (01:21)
Oct 07 2014 (23:32) IMG13162-85017/♥♥Chhota Nagpur Express♥♥ | CSTM/Mumbai CSM Terminus (18 PFs)
258 net green flags 8 green per TrainCustom Ratings
BengalNagpurRailway~
BengalNagpurRailway~ 34 img trains 23 popular258 net green flags 8 green per TrainCustom Ratings
Dear friends, please rate this train
This is first train connecting KTE-BRKA-DHN route & it avoids over saturated ALD-MGS section...
Coach composition 'll' be :
LOCO-SLR-GEN-GEN-S8-S7-S6-S5-S4-S3-S2-S1-PC-B1-AB1 -HA1-D2-D1-GEN-GEN-GEN-SLR
Loco links can be :
Mumbai...
more...
This is first train connecting KTE-BRKA-DHN route & it avoids over saturated ALD-MGS section...
Coach composition 'll' be :
LOCO-SLR-GEN-GEN-S8-S7-S6-S5-S4-S3-S2-S1-PC-B1-AB1 -HA1-D2-D1-GEN-GEN-GEN-SLR
Loco links can be :
Mumbai...
more...
12 Posts
Can we delete imaginary trains?
I've tried re-numbering trains but it duplicated into a new train with new number & same timings as against my wish of deleting old numbered train or re-numbering...
Can any one guide please...?
I've tried re-numbering trains but it duplicated into a new train with new number & same timings as against my wish of deleting old numbered train or re-numbering...
Can any one guide please...?
rename the train and update a new tt, at present can't be deleted, option not avbl.
Green from my end as no dedicated train on this segment.. Couple of suggestion from my end
1) Too many stoppages, can be easily speeded up specially between SGRL-HWH (Considering you already have Shaktipunj Express on daily basis from JBP-HWH and many train for CSTM-JBP connectivity)
2) You could also think of extending Shaktipunj itself
3) CC - First AC not really required... i...
more...
1) Too many stoppages, can be easily speeded up specially between SGRL-HWH (Considering you already have Shaktipunj Express on daily basis from JBP-HWH and many train for CSTM-JBP connectivity)
2) You could also think of extending Shaktipunj itself
3) CC - First AC not really required... i...
more...
Yes, it has too many stoppages, so I was planning to speed it up & CC was an experimental feature...
In the begin I was planning to ply this train over Imperial Mail's route but many advised me to used this route, so I've tried this one and kept low speed as it's single track & 1st AC is just a legacy of Imperial Mail... Surely your suggestions will be soon turned into it's TT...
Thanks...!
In the begin I was planning to ply this train over Imperial Mail's route but many advised me to used this route, so I've tried this one and kept low speed as it's single track & 1st AC is just a legacy of Imperial Mail... Surely your suggestions will be soon turned into it's TT...
Thanks...!