There is no sign of electrification on CAN-CLT line. The CLT-CAN line is better. But still lot of places breaks are there. A view near Cannanore South
The entire SRR-MAQ was focused only single line, leaving the other side blank. Now CLT-SRR side fully completed (both line).
As of now looks like almost no activity at all. Just postponing the completion date to three to six months.