Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Be a RailFan; learn how to enjoy your trip; enjoy your life.

Search Forum
<<prev entry    next entry>>
Blog Entry# 1324603
Posted: Dec 30 2014 (11:04)

3 Responses
Last Response: Dec 30 2014 (11:53)
1 Followers
General Travel
2618 views
0

Dec 30 2014 (11:04)   17643/Circar Express (PT)
 
svravibhargav
svravibhargav   491 blog posts
Entry# 1324603            Tags  
Travelled from MS-GVN few days back and from BVRT-MS yesterday. Loco links for MS-BZA-MS were LGD WAP 4. BZA-COA was WDP 1 twins and COA-BZA was WDM 3A.
MS-BZA:
Departed at 17.20 and reached GDR at 20.05, departed at 20.27.
Reached BZA at 02.35. I slept again and train was at KKLR at 05.00 waiting for 18519.
Train
...
more...
reached KVR at 07.35. 18520 and 12664 had overtaken at that time. Finally left at 08.00 and crossing with RJY-NS Pass at GVN.
BVRT-MS:
Reached BVRT at 18.35, GDV at 19.50. I had slept again. This morning it reached MS at 06.40.
Observations:
17643 can depart from MS at 19.00.
MS 19.00 (12642, 12652 have reached at 18.00 || 12663/12665 will arrive at 19.55)
GDR 21.45/21.47 (12669/12967/12969 | 12759 | 12709 | 12615 | 17401 have already left) (Also with loco as LGD WAP 4/ WAP 7, acceleration shouldn't be a problem)
TEL 02.09/02.10 (GDR-TEL 262 kms can be covered at 60 kmph with WAP 4/7)
NGNT 02.38/02.40
BZA 03.55/04.15 (18520 has already left)
BVRT 06.40
NDD 07.50
KVR 08.05/08.15 (12718 OT)
RJY 08.35/08.40 (Utilising the 30 minute gap between 12718 and 12840)
SLO 09.40
CCT 10.00
COA 10.15
17644:
COA 15.15
SLO 15.45
RJY 16.40/16.45 (18463 | 18047/12867/12254 | 12717 have already left before 17644 reaches SLO)
BVRT 18.25
KKLR 19.00
GDV 20.00
BZA 21.00/21.20 (17488 can depart at 21.10) (Also, 17644 waits at KCC for 12704 which is now avoided)
NGNT 22.00
TEL 22.45
MS 06.30
I had noticed earthwork going on for doubling works on BZA-GDV-BVRT section. The maximum progress is between KKLR-AKVD where levelling is also done. The whole process may take 24 months from now. Consolidation work near KKLR towards GDV.
I haven't seen any earthworks in BVRT-NDD section. Has anyone seen it there?

Translate to English
Translate to Hindi

1908 views
0

Dec 30 2014 (11:33)
Pk12717~
Pk12717~   6779 blog posts
Re# 1324603-1              
Good report..circar needs tt change frm both sides...
Translate to English
Translate to Hindi

1814 views
0

Dec 30 2014 (11:51)
svravibhargav
svravibhargav   491 blog posts
Re# 1324603-2              
Thank you sir. Is there an online IR portal to which this suggestion can be mailed?
Translate to English
Translate to Hindi

1909 views
0

Dec 30 2014 (11:53)
guest   1777 blog posts
Re# 1324603-3              
you can file in www.rtionline.gov.in
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy