Full Site Search  
Mon Jun 26, 2017 16:10:08 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

<<prev entry    next entry>>
Blog Entry# 1405557  
Posted: Mar 24 2015 (07:02)

5 Responses
Last Response: Mar 25 2015 (15:40)
  
★  Rail Fanning
0 Followers
3148 views
Mar 24 2015 (07:02)   54558/Patiala Ambala Passenger (UnReserved) | PTA/Patiala (4 PFs) | TKD/WDP-1/15053
 

Naveen~   2970 blog posts   33 correct pred (58% accurate)
Entry# 1405557            Tags   Past Edits
Some RF moments at Patiala and DMW Halt.

  
Mar 24 2015 (13:40)
Naveen~   2970 blog posts   33 correct pred (58% accurate)
Re# 1405557-1            Tags   Past Edits
The Shut signal no 33.

  
1005 views
Mar 24 2015 (13:41)
सजन रेडियो बजाईयो जरा*^~   31747 blog posts   70120 correct pred (81% accurate)
Re# 1405557-2            Tags   Past Edits
what use of this signals ?

  
1081 views
Mar 24 2015 (13:41)
कर्नाटक संपर्क क्रांति^~   4300 blog posts   3559 correct pred (68% accurate)
Re# 1405557-3            Tags   Past Edits
For shunting

  
1036 views
Mar 24 2015 (13:44)
Naveen~   2970 blog posts   33 correct pred (58% accurate)
Re# 1405557-4            Tags   Past Edits
They are called Shunt Signals, used to guide the loco pilots who are doing shunting in the station yard. Like in this pic, the Shunt signal is at ON position, if the right and upper light is glowing , it is set to OFF, means no shunting unless its ON.

  
Mar 25 2015 (15:40)
Poll on Fares in Indian Railways entry 2332591^~   82781 blog posts   5299 correct pred (78% accurate)
Re# 1405557-5            Tags   Past Edits
Very useful
Can be added to #faq
Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.