Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

TKD WDP-4B "प्रतीक" - रंग ऐसा कि हर किसी को प्यार हो जाए - Anubhav Kashyap

Search Forum
<<prev entry    next entry>>
Blog Entry# 1411476
Posted: Mar 30 2015 (09:39)

2 Responses
Last Response: Apr 05 2015 (22:22)
Info Update
3913 views
15

★★
Mar 30 2015 (09:39)   LLH/Liluah (5 PFs)
 
guest   2722 blog posts
Entry# 1411476            Tags   Past Edits
Details of the funtions of India's biggest Coach/Wagon Workshop at Liluah (Eastern Railways)
••••••••
Its An ISO-9001:2008 & ISO-14001-2004 Certified Organisation !!
••••••••
Coaches:
POH
...
more...
of coaches – AC and Non-AC including new generation coaches viz.LHB, Hybrid, Double Decker
Intermediate Overhaul (IOH) of LHB,Hybrid,Doubledeker, Shatabdi and other 18 M Mail/ Express coaches.
Supply of IOHed Coach Bogie to ECR.
Refurbishing of coaches both AC & Non AC.
Retrofitment of Environment friendly Bio-Toilet in Coaches.
Bogie Frame for LHB Coaches.
Renovation of NAC Pantry car in Coaches.
○○○○○○
Wagons:
POH & NPOH of air brake wagons (BOXN,BOXNHS,BCN,BCNA,BCNAHS,BVZI).
POH of BLC wagons.
○○○○○○
Manufacturing:
Manufacture and fabrication of Coach & Wagon components.
Overhauling & Repair of subassemblies like wheel sets, Springs, Buffers,Cartridge Taper Roller Bearings etc. to coaching shops & divisions.
Reclamation, Heat-treatment and testing of critical safety items like screw coupling, bolster suspension hangers, draw gear equipment & brake block hangers etc.
Manufacture of FRP / SMC items through hand and machine moulding process.
Maintenance:
The workshop undertakes in-house maintenance of nearly 1000 Machinery Plant like EOTs, Wheel Lathe, Wheel Press, Shearing M/c. Traversers etc for both Mechanical & Electrical breakdowns.
○○○○○○
Electrical:
Overhaul and repair of electrical equipments including Roof mounted AC Package unit, Alternators, Motors, Compressors, Power Car, Transformers, Fans etc.
Provision of Tube Light fittings in Non-AC Coaches including lavatories, Laptop / mobile charging points in AC and GSCN coaches.
Distribution of Power Supply in workshop, colony, hospital and service buildings.
Maintenance of Pumps for Drinking water & pumping out of water from drains.
Metallurgical & Chemical Laboratory:
Non-destructive testing including Ultrasonic testing of axles & wheels. Chemical analysis and physical testing of ferrous & non-ferrous materials and oils, lubricants, paints, varnishes, rubber, felt items etc.
Failure Investigation of rolling stock components.
Supervision and Quality Control of Effluent Treatment Plant (ETP).
○○○○○○
IT Centre:
The EDP Centre, now IT Centre was set up in Liluah in the year 1988 as per Railway Board's directive to computerize fourteen workshops.
The objective of obtaining information on Rolling Stock maintenance, Production Planning & Control, Payroll of both GPR & APR, Income Tax of both GPR & APR staff, PF, Financial Management, Personnel Management etc. to facilitate Managerial decision, have been successfully implemented & all are running.
WISE-II is under implementation at 5 workshops as pilot project, LLH Workshop is also one of them.
○○○○○○
Store:
Liluah depot is holding 2556 nos stock items to meet the requirement of Liluah Workshop and division of E.Rly., out of which A Cat. Items- 159, B Cat. Items- 337,C1 & C2 Cat items- 1303, D Cat. Items- 38 & nil Cat.items- 719.
Dy.CMM/LLH is the in-charge of the depot and he is assisted by AMM/P & AMM/L AMM/LCD.
Altogether there are eight nos of stocking wards for stocking of all the stock items. In addition to this RB sec, Genl.Sec, Despatch Sec,RR Sec, Ledger Sec, IC Sec, Computer Sec & Lorry Garrage etc. are under Dy.CMM/LLH.
○○○○○○
Modification work at Liluah Workshop:
1.Alarm chain (PEASD) provision in coaches.
2.Composit Head Stock (M,SCR,CR-Shop).
3.SS Inlay.
4.Trough Floor (Full + Half).
5.Toilet Indication in LHB Coaches.
6.Stain Resistance Upholstery Cloth (T-Shop).
7.Strengthing of under frame in VPH & SLR Coaches.
8.Body Bolster in Coaches (M,CR & SCR Shop).
9.Failure Indication & Brake Application (FIBA) in Coaches.
10. BMBC Conversion on Coaches.
11. Retrofitted of SS pipe in Coaches.
12. Friction Snubber Assy. In Coaches.
13. Sand Blasting.
14. ‘A’ Scheduled Painting in Coaches.
15. Codal life extension of Coaches.
○○○○○○
Total no. of stock items in Workshop (Depot is separate) :- 2556 (as on 31.01.2014)
ICF Coach-1130
LHB Coach-222
Wagon-299
Elect.-656
General-249
Total =2556
••••••
Video for a Visual - click here
Source - click here

Translate to English
Translate to Hindi

2373 views
1

Apr 05 2015 (20:32)
PankajMishra^~
PankajMishra^~   59101 blog posts
Re# 1411476-1              
fir bhi ER ke ko Bhopal jate hai :P
Translate to English
Translate to Hindi

1 Public Posts - Sun Apr 05, 2015
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy