Search Forum
Blog Entry# 1444642
Posted: Apr 27 2015 (17:41)
9 Responses
Last Response: May 01 2015 (17:15)
9 Responses
Last Response: May 01 2015 (17:15)
Apr 27 2015 (17:41) 18626/Kosi Super Express | GAYA/Gaya Junction (10 PFs)
Tapaswini_Orrisa_queen~
Tapaswini_Orrisa_queen~ 1873 blog postsDo dil mil rahe hai magar chupke chupke..sbko ho rahi hai khabr chupke2. wap4 getting attached to super express ..@ gayajn pf 4..
7 Posts
It means "Periodic Overhaul of this Loco has been done at Kanchrapara Workshop".
After covering a certain distance every Locomotive is required to be sent to some rail workshop to renew it(Changing some parts or modifying some parts of Loco) for running in IR which is known as Periodic Over haul.
After covering a certain distance every Locomotive is required to be sent to some rail workshop to renew it(Changing some parts or modifying some parts of Loco) for running in IR which is known as Periodic Over haul.
ohk.. the yes it was needed.. its early wap4 was in pethatic bad condition.