Search Forum
Blog Entry# 1518995
Posted: Jun 20 2015 (18:53)
No Responses Yet
No Responses Yet
Work Details:
Work Description Dismantling of existing BG track, laying and linking of Broad gauge main line, loop lines including points and crossings at various yards, spreading of ballast, tamping of track, transportation of P-Way materials and other ancillary works between Guriya â?? Marwar Jn. Section in connection with Guriya - Marwar Jn. BG Patch Doubling Project.
Work Description Dismantling of existing BG track, laying and linking of Broad gauge main line, loop lines including points and crossings at various yards, spreading of ballast, tamping of track, transportation of P-Way materials and other ancillary works between Guriya â?? Marwar Jn. Section in connection with Guriya - Marwar Jn. BG Patch Doubling Project.