Search Forum
Blog Entry# 1530329
Posted: Jul 02 2015 (12:48)
2 Responses
Last Response: Jul 02 2015 (13:19)
2 Responses
Last Response: Jul 02 2015 (13:19)
Article published in Bhaskar today. Washable apron work completed.
1 Public Posts - Thu Jul 02, 2015
Route relay interlocking work at palwal will be undertaken to link line no. 3 & 4 with existing line no. 1 & 2 so that trains running on line no. 3 & 4 can easily switch to line no 1 & 2 .
Washable apron means facility to wash trains and to fill water in coaches storage tank at the platform itself and thus avoiding the rake to be taken to yard which eventually saves loads of time.
Washable apron means facility to wash trains and to fill water in coaches storage tank at the platform itself and thus avoiding the rake to be taken to yard which eventually saves loads of time.