Search Forum
Blog Entry# 1541817
Posted: Jul 16 2015 (00:31)
3 Responses
Last Response: Jul 16 2015 (00:44)
3 Responses
Last Response: Jul 16 2015 (00:44)
When train moves towards BBk from lko just after the dilkusha cabin there are two tracks just parallel to the in use tracks and a bridge over Gomati river which isnt in use and isnt even connected to in use tracks...so why have been all these constructed?? Can someone explain??
Gomti bridge was made 10 yrs bk ..bt it was nt connected to main line because nr did nt got permission for mega block from rb n there is sm technical issue in newly constructed bridge which ur talking abt...tender hogaya h ...2 3 months may new bridge operate ho jayega..
2 Public Posts - Thu Jul 16, 2015