Search Forum
Blog Entry# 1545180
Posted: Jul 19 2015 (16:42)
3 Responses
Last Response: Jul 20 2015 (14:12)
3 Responses
Last Response: Jul 20 2015 (14:12)
Jul 19 2015 (16:42) 12142/Patliputra - Mumbai LTT SF Express (PT)
![](http://st.indiarailinfo.com/images/1.png)
IndianRailwayslover~
IndianRailwayslover~ 2234 blog postsOn Eid day I went to check coach composition of 12142 , I saw the empty rake of this train with old composition having 2 three tier 1 two tier n 1 ha at Bhandup yard.. I got down at Thane at around 2:20 to capture 12142.. At around 3:08 train powered by kyn wcm3 slowly skipped thane changing tracks frm pf6 to pf8.. Couldnt capture due to some chaos at pf6, but the coach composition was as follows:
Loco-slr-gen-ha1-a1-b1+b2-b3-b4-s1-pc(dnt remember if it was between s1 n s2 or s3 n s4)-s2-s3-s4-s5-s6-s7-s8-s9-s10-s11-s12-gen-gen-slr(24 coaches)
The...
more...
Loco-slr-gen-ha1-a1-b1+b2-b3-b4-s1-pc(dnt remember if it was between s1 n s2 or s3 n s4)-s2-s3-s4-s5-s6-s7-s8-s9-s10-s11-s12-gen-gen-slr(24 coaches)
The...
more...
As per availability it seems that b3 b4 are permanent n it can be updated
You check the availibility to confirm.. It used to have 57 n 59 end to end for 3a for both ends which is changed to 129 n 135 respectively..