Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal Android   RailCal iPhone

site support

RailFanning is an art-form; RailFans are the paints - Ayush Kumar Singh

Search Forum
<<prev entry    next entry>>
Blog Entry# 1545180
Posted: Jul 19 2015 (16:42)

3 Responses
Last Response: Jul 20 2015 (14:12)
Rail Fanning
3174 views
0

Jul 19 2015 (16:42)   12142/Patliputra - Mumbai LTT SF Express (PT)
 
IndianRailwayslover~
IndianRailwayslover~   2234 blog posts
Entry# 1545180            Tags   Past Edits
On Eid day I went to check coach composition of 12142 , I saw the empty rake of this train with old composition having 2 three tier 1 two tier n 1 ha at Bhandup yard.. I got down at Thane at around 2:20 to capture 12142.. At around 3:08 train powered by kyn wcm3 slowly skipped thane changing tracks frm pf6 to pf8.. Couldnt capture due to some chaos at pf6, but the coach composition was as follows:
Loco-slr-gen-ha1-a1-b1+b2-b3-b4-s1-pc(dnt remember if it was between s1 n s2 or s3 n s4)-s2-s3-s4-s5-s6-s7-s8-s9-s10-s11-s12-gen-gen-slr(24 coaches)
The
...
more...
aditional 3ac coaches had b3 n b4 marking not sure if temp or permanent... Hope its permanent(can this be updated)

Translate to English
Translate to Hindi

2120 views
0

Jul 20 2015 (05:08)
IndianRailwayslover~
IndianRailwayslover~   2234 blog posts
Re# 1545180-1              
As per availability it seems that b3 b4 are permanent n it can be updated
Translate to English
Translate to Hindi

2290 views
0

Jul 20 2015 (06:30)
~   4533 blog posts
Re# 1545180-2              
Two three AC coaches are augumented...right???
Translate to English
Translate to Hindi

2255 views
0

Jul 20 2015 (14:12)
IndianRailwayslover~
IndianRailwayslover~   2234 blog posts
Re# 1545180-3              
You check the availibility to confirm.. It used to have 57 n 59 end to end for 3a for both ends which is changed to 129 n 135 respectively..
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy