Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

There is no more pure joy than RailFanning.

Search Forum
<<prev entry    next entry>>
Blog Entry# 1551102
Posted: Jul 26 2015 (15:56)

1 Responses
Last Response: Jul 26 2015 (21:54)
3 Followers
Rail Fanning
31584 views
11

Jul 26 2015 (15:56)   TATA/Tatanagar Junction (6 PFs)
 
guest   6387 blog posts
Entry# 1551102            Tags   Past Edits
#railwayengineering
************ Exploring ELECTRIC LOCO SHED of TATANAGAR ************
Brief Description about ELS TATA:
1. History and Mile stones of ELS/TATA
Electric Loco Shed, Tatanagar was established in the year 1962 with 69 locomotives
...
more...

under the supervision of SNCF Railway. Tata Electric Loco Shed then became the 2nd
Electric Loco Shed in Indian Railways.Traction Motor Repair Shop was inaugurated On 06 February 1976.Wheel Centre Shop was inaugurated on 01/03/2005.ELS/TATA homed 1st three phase loco 31239 & 31240 on 15 March 2010. ELS/TATA & CTRC/TATA both accredited as ISO 9001:2008 quality management systems on 23th May 2013. ELS/TATA celebrated its glorious Golden Jubilee Celebration in 2012 and adjudged as
best electric loco shed in S.E.Railway.DP wireless operation in WAG9 Locomotives 31282 & 31284 Tata base fitted with prototype Radio Remote Control (RRC) first ever in Indian Railway. Date of commission: June 2013. DP wireless operation in conventional Tap changer Locomotives. DPWCS’s are commissioned in 28583 & 28589 Tata base locos. Date of commission: August 2013. ELS/TATA celebrated its golden jubilee celebration in 2012 and adjudged as best shed in S.E.Railway.
AT ELS/TATA: - ELS/TATA is homing WAM4, WAG5, WAG7 and WAG9 type of locomotives and
following works are being done at shed.
Routine maintenance / repair work & unscheduled attention.
Minor inspection schedule (IA, IB, IC)
Major inspection schedule (AOH, IOH)
For more details about HISTORY AND MILE STONES OF ELS/TATA please refer the attached PDF Document.DOWNLOAD LINK OF PDF DOC
For details about MISSION of ELS/TATA please refer this Link: click here
For details about MILESTONE of ELS/TATA please refer this Link: click here
For Official Messages of ELS TATA please refer this Link: click here
For Viewing the ISO 9001:2008 certificate of ELS/TATA please refer this Link: click here
For Viewing CHRONOLOGICAL LIST of ELS/TATA please refer this Link: click here
Attached Articles:
HISTORY AND MILE STONES OF ELS/TATA(4 Page PDF Document)
Attached Image Link: click here

Translate to English
Translate to Hindi

3010 views
5

Jul 26 2015 (21:54)
guest   6387 blog posts
Re# 1551102-1               Past Edits
So, 3 Phase Facility is in ELS/TATA and it is very Good so it can easily home WAP-7. It can also be said from the above blog that Major Overhaul work of 3 Phase locos can also be performed in TATA ELS such as Traction Motor, Auxiliary Converter related work of these Locos. So RB should allot WAP-7 to TATA without any tension as because it is the BEST LOCO SHED of SER with upgraded Facilities and also maintain WAP-7 Locos in a very well manner.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy