Search Forum
Blog Entry# 1551102
Posted: Jul 26 2015 (15:56)
1 Responses
Last Response: Jul 26 2015 (21:54)
1 Responses
Last Response: Jul 26 2015 (21:54)
#railwayengineering
************ Exploring ELECTRIC LOCO SHED of TATANAGAR ************
Brief Description about ELS TATA:
1. History and Mile stones of ELS/TATA
Electric Loco Shed, Tatanagar was established in the year 1962 with 69 locomotives...
more...
************ Exploring ELECTRIC LOCO SHED of TATANAGAR ************
Brief Description about ELS TATA:
1. History and Mile stones of ELS/TATA
Electric Loco Shed, Tatanagar was established in the year 1962 with 69 locomotives...
more...
So, 3 Phase Facility is in ELS/TATA and it is very Good so it can easily home WAP-7. It can also be said from the above blog that Major Overhaul work of 3 Phase locos can also be performed in TATA ELS such as Traction Motor, Auxiliary Converter related work of these Locos. So RB should allot WAP-7 to TATA without any tension as because it is the BEST LOCO SHED of SER with upgraded Facilities and also maintain WAP-7 Locos in a very well manner.