Search Forum
Blog Entry# 1554979
Posted: Jul 31 2015 (19:48)
11 Responses
Last Response: Aug 13 2015 (13:08)
11 Responses
Last Response: Aug 13 2015 (13:08)
6 Posts
The machine shall be here for 15-20 days, working at Dhablan, 12 Kim's from Patiala towards DUI, and is under ADEN, Patiala. An MLP ( Military Loading Point) , is being setup here with laying of 8 extra loop lines, and shall be made a major crossing section on this route. A TSS shall also be constructed here. All these were proposed for Patiala, but due to lack of space around here, these are now been planned at Dhablan. Although Patiala already has a military loading point and ramp since long, but due to increase in city traffic etc, it was getting difficult for army to bring tanks etc here for loading. But , an emergency loading is still done here at Patiala. After Dhablan, the machine shall work on the Patiala Station Yard, due to yard remodeling has been planned here also.
* A correction dear friends, it's not Plasser machine, it's Kalugaputmash, a Russian track and tamping machine. Well , it tells you as all the glitters are not gold, likewise , all yellow machines are not Plasser :)
A close view... a mere 3 yr old machine , manufactured in 2012 as imprinted on the bottom right.