A few snaps taken at Satish Samanta Halt (SSPH) and in between SSPH - Mahishadal (MSDL) showing the doubling work status. Only a small stretch (near the Hijli Canal bridge) of ~ 2-3 kms is left. Rest of the part has already been doubled, and in working condition.