Search Forum
Blog Entry# 1614643
Posted: Oct 12 2015 (10:56)
14 Responses
Last Response: Oct 13 2015 (09:00)
14 Responses
Last Response: Oct 13 2015 (09:00)
SWR/South Western
~ 130 news posts
There are plans to increase the speed of trains operating on Mysuru-Bengaluru section owing to likely completion of the track doubling work between the two cities.Sources...
10 Public Posts - Mon Oct 12, 2015
It already has 2 parking line besides the 2 pitline in the C&W yard. besides 6pfs at COA and CCT out of which 3 can be used for parking which already is being implemented - circar on pf 1 at COA, cocananda at pf 3 COA, special/bhavnagar at pf 3 CCT.
and as i recollected DSP saying construction of 3rd pitline might b gng on, i just found this on googlemaps. Adjacent to parking line beside pitline 2, we can notice a rised bund/elevation structure all along the length (length of approx 30 caoches). That might be 3rd pitline coming up.
and as i recollected DSP saying construction of 3rd pitline might b gng on, i just found this on googlemaps. Adjacent to parking line beside pitline 2, we can notice a rised bund/elevation structure all along the length (length of approx 30 caoches). That might be 3rd pitline coming up.
2 Public Posts - Mon Oct 12, 2015
1 Public Posts - Tue Oct 13, 2015